For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 39.04.007 — Street name signs and street lights

Code of Ordinances of the City of Lubbock, Texas (Lubbock Code of Ordinances, Charter and Unified Development Code current through Ordinance 2026-O0123 adopted September 22, 2026 (eCode360 publication LU6396, scraped 2026-11-17)) · Lubbock Unified Development Code § 39.04.007

Corpus is an independent public-information project, not the official City of Lubbock website. Stable reference: corpuslaw.us/code/f9d4ba68-e0d2-4a50-a1a7-9e6a4162c8df

§ 39.04.007: Street name signs and street lights.

a. Street name signs. 1. Signs. Street name signs for streets shall be provided at all street intersections within or abutting the proposed plat in accordance with the City of Lubbock Code of Ordinances Chapter 36, Streets, Sidewalks, and Other Public Ways. Street name sign locations will be determined by the City Engineer during plat review. Street name signs shall be paid for by the subdivider and produced and installed by the Traffic Engineering Department. 2. Payment. Payment for street name signs shall be provided by the subdivider for the original sign and installation. The cost for street name signs shall be set annually in the City's budget ordinance. If no fee is established by budget ordinance, a minimum cost of $200.00 per street name sign shall be required prior to recording of the Final Plat and shall be paid to the City Engineer. b. Street lights. 1. Location. Street lights shall be provided at all street intersections and other locations within and abutting the subdivision with the exception of thoroughfare lighting. 2. Number. Street lights shall be placed in accordance with the current City standards for both location and number. 3. Installation and inspection. Engineering design and installation as well as the actual inspection of the street light construction shall be performed by Lubbock Power and Light. Lubbock Power and Light will provide design and specifications for stock light standards and fixtures to be used in all subdivisions. 4. Cost for street light fixtures. A cost recovery fee for the design of materials, preparation of specifications, installation of lighting, and the inspection of construction shall be charged for stock standards and fixtures. The cost for stock light standards and fixtures and the cost recovery fees for the design of materials, installation, specifications, and inspection of construction shall be set annually in the City's budget ordinance. If no fee is established by budget ordinance, Lubbock Power and Light shall charge fees established through Lubbock Power and Light's electric rate tariff/schedule. Lubbock Power and Light will notify the plats coordinator when such fees are paid. 5. Non-stock street light fixtures. Non-stock light standards and fixtures must be approved by the City Engineer prior to approval of the Final Plat. It will be the subdivider's responsibility to receive approval from Lubbock Power and Light for the locations and installation of the streetlights. If the subdivider chooses non-stock light standards and/or fixtures, the subdivider shall provide design and specifications and receive approval of lighting improvements prior to approval of the Final Plat. The subdivider is also responsible for selecting and paying a contractor for installation of the non-stock light standards and fixtures. An inspection fee shall also be paid to Lubbock Power and Light. A. A subdivider may choose Lubbock Power and Light as the contractor for non-stock street lighting and shall negotiate a price for materials and labor. A cost recovery fee for the design of materials, preparation of specifications, installation of lighting, and the inspection of construction shall be charged for non-stock light standards and fixtures when Lubbock Power and Light is the contractor. B. The subdivider will maintain and store at least three non-stock light standards and fixtures as replacement inventory and provide them to Lubbock Power and Light when replacements are needed. If at any time the subdivider does not provide such inventory, standards and fixtures will be replaced with stock inventory. C. Any appeal of a decision of Lubbock Power and Light shall be to the Planning and Zoning Commission. Any appeal of a decision of the Planning and Zoning Commission shall be to the City Council. The decision of the City Council shall be final. 6. Base mixed-use district. Refer to Section 39.02.005a, General Mixed-Use Standards, for street light standards related to the Base Mixed-Use districts.

( Ordinance 2023-O0054 adopted 5/9/2023 )

Ask a question about Lubbock law

Corpus searches the Lubbock sections it holds and shows the ones that match, with their citations. Free, no sign-in.