§ 106-104 — Permit for completion; right of city to designate formations to be developed; inspection fee
Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 106-104
Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/6b8dec4f-be15-4fb9-ae0f-fe53b22c729a
§ 106-104: Permit for completion; right of city to designate formations to be developed; inspection fee.
(a) If the electric log and soil formation indicate favorable conditions for completion of a water well, based upon geological analysis of such soil formation and electric log, the city will issue a final permit for well completion. The city reserves the right to designate which formations are to be developed and which formations are to be sealed off and not developed, a condition to be determined before final issuance of the permit. (b) An inspection fee of $25.00 shall be charged for each final permit granted under this section.
( Ordinance 2017-27 , § I, adopted 5/8/2017 )
Ask a question about McAllen law
Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.
