For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-94 — Inspection of work

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Code of Ordinances § 22-94

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/cd48cd55-533e-4e9e-b51f-a7a9229f319d

§ 22-94: Inspection of work.

(a) The building official or designee shall inspect all work covered by a permit required by this article during and after its completion. If the work appears to be constructed in accordance with all rules and requirements governing such work, the building official shall issue a certificate approving the work. Such certificate shall be issued only to the master electrician who ordered the permit. The approval by the building official relating to any such electrical work shall not constitute a guarantee or warranty to anyone by the city or the building official that such work is in compliance with code requirements or is otherwise safe or without default, and the city and building official shall never be liable for any damage of whatsoever nature caused by any defect in any electrical work installed or repaired under any permit issued under this article. (b) No concealed wiring for which a permit is issued or required by this article shall be lathed over or in any manner concealed from sight until inspected and accepted by the building official. (c) All wiring must be completed before the wiring shall be allowed to be concealed from view. All cabinets, cutouts, flush switches and all other fittings shall be permanently installed before final inspection and acceptance, except the lighting or other fixtures themselves, and a separate permit shall be required for any alteration or changes thereafter. (d) When electrical work has been reported to the building official as ready for final inspection, and when upon such inspection the work is found to be defective, a permit reinspection fee shall be paid at the time of the new application for final inspection and before such work is again inspected for final approval. (e) Any person having charge of the construction, alteration or repair of buildings or any person who covers or conceals or causes to be concealed or covered any wiring for which a permit has been issued or required before the wiring has been inspected and approved, without having officially notified the building official at least two whole business days before (Monday through Friday), shall be guilty of a misdemeanor.

( 1966 Code, § 13-18 ; Ordinance 2005-76 , § 1, adopted 9/26/2005 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.