For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.2.8 — Infrastructure Use – Specific Regulations

Code of Ordinances, City of McAllen, Texas (through Ord. 2026-83 adopted 2026-08-24) · McAllen Unified Development Code § 3.2.8

Corpus is an independent public-information project, not the official City of McAllen website. Stable reference: corpuslaw.us/code/1da3ed77-6bf7-4b61-8506-40cd48bfc7f3

§ 3.2.8: Infrastructure Use – Specific Regulations.

A. Eligible Facility. These definitions and related Section 6409 procedures only apply to the City to the extent the FCC's Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies, Report and Order, 29 FCC Rcd 12865 (2014), ("2014 Infrastructure Order") preempts existing City procedures and to the extent the 2014 Infrastructure Order is effective as federal law.[1] The City expressly reserves its rights to revise or repeal any or all of these definitions and related Section 6409 procedures to the extent the 2014 Infrastructure Order is interpreted, modified, revised or enjoined on any appeal or reconsideration in a manner inconsistent with the definitions in or procedure in this Subsection. 1. Eligible Facilities Request (Section 6409) Definitions. For the purposes of a personal wireless facilities siting permit under Section 6409(a),[2] as interpreted by the Federal Communications Commission's ("FCC") in the 2014 Infrastructure Order, which is asserted to be a qualified application for a Section 6409 eligible facilities request,[3] the following defined terms shall be used: a. Base Station. A structure or equipment at a fixed location that enables FCC-licensed or authorized wireless communications between user equipment and a communications network. The term does not encompass a tower as defined in subsection a(i), below or any equipment associated with a tower. Base station includes, without limitation: (i) Equipment associated with wireless communications services such as private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. (ii) Radio transceivers, antennas, coaxial or fiber-optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration (including distributed antenna systems ("DAS") and small-cell networks). (iii) Any structure other than a tower that, at the time the relevant application is filed with the City, supports or houses equipment described in subsection a(i) and subsection a(ii), above, that has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing that support. The term does not include any structure that, at the time the relevant application is filed with the City, does not support or house equipment described in subsections a(i) and a(ii). b. Collocation. The mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communications purposes.[4] c. Eligible Facilities Request. Any request for modification of an existing tower or base station that does not substantially change the physical dimensions of such tower or base station, involving: (i) Collocation of new transmission equipment; (ii) Removal of transmission equipment; or (iii) Replacement of transmission equipment. d. Eligible Support Structure. Any tower or base station, as defined in these Section 6409 Definitions, provided that it is existing at the time the relevant application is filed with the City. e. Existing. A constructed tower or base station is existing for purposes of Section 6409 if it has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, provided that a tower that has not been reviewed and reviewed because it was not in a zoned area when it was built, but was lawfully constructed, is existing for purposes of Section 6409. f. Site. For towers other than towers in the public rights-of-way, the current boundaries of the leased or owned property surrounding the tower and any access or utility easements currently related to the site, and, for other eligible support structures, further restricted to that area in proximity to the structure and to other transmission equipment already deployed on the ground. g. Substantial Change. A modification substantially changes the physical dimensions of an eligible support structure if it meets any of the following criteria: (i) For towers other than towers in the public rights-of-way, it increases the height of the tower by more than ten percent or by the height of one additional antenna array with separation from the nearest existing antenna not to exceed twenty (20) feet, whichever is greater; for other eligible support structures, it increases the height of the structure by more than ten percent (10%) or more than ten (10) feet, whichever is greater;[5] (ii) For towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than twenty (20) feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, it involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six (6) feet; (iii) For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public rights-of-way and base stations, it involves installation of any new equipment cabinets on the ground if there are no pre-existing ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than ten percent (10%) larger in height or overall volume than any other ground cabinets associated with the structure; (iv) It entails any excavation or deployment outside the current site; (v) It would defeat the concealment elements of the eligible support structure; or (vi) It does not comply with conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment, provided however that this limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds identified in subsection 1.g, above. h. Transmission Equipment. Equipment that facilitates transmission for any FCC-licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-optic cable, and regular and backup power supply. The term includes equipment associated with wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. i. Tower. Any structure built for the sole or primary purpose of supporting any FCC-licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the associated site. 2. Eligible Facilities Request (Section 6409) Application Review.[6] a. Application. The City shall prepare and make publicly available an application form which shall be limited to the information necessary for the City to consider whether an application is a qualified eligible facilities request. The application may not require the applicant to demonstrate a need or business case for the proposed modification. b. Type of Review. Upon receipt of self-described application for an eligible facilities request, the designated City department shall review such application to determine whether the application qualifies as a Section 6409 eligible facility request, in accordance with the 2014 Infrastructure Order. c. Timeframe for Review. Within sixty (60) days of the date on which an applicant submits an application seeking approval, the City shall approve the application unless it determines that the application is not a qualified Section 6409 eligible facilities request. d. Tolling of the Timeframe for Review. The 60-day review period begins to run when the application is filed, and may be tolled only by mutual agreement by the City and the applicant, or in cases where the City determines that the application is incomplete. The timeframe for review is not tolled by a moratorium on the review of applications. (i) To toll the timeframe for incompleteness, the City must provide written notice to the applicant within thirty (30) days of receipt of the application, specifically delineating all missing documents or information required in the application. (ii) The timeframe for review begins running again when the applicant makes a supplemental submission in response to the City's notice of incompleteness. (iii) Following a supplemental submission, the City shall notify the applicant within ten days that the supplemental submission did not provide the information identified in the original notice delineating missing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in subsection 2.d(ii). Second or subsequent notices of incompleteness may not specify missing documents or information that were not delineated in the original notice of incompleteness. e. Failure to Act. In the event the City fails to approve or deny a request seeking approval of an eligible facilities request within the timeframe for review (accounting for any tolling), the request shall be deemed granted. The deemed grant does not become effective until the applicant notifies the City in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted.[7] f. Remedies. Applicants and the City may bring claims related to Section 6409(a) to any court of competent jurisdiction. g. Interaction with Section 332(c)(7).[8] If the City determines that the applicant's request is not a Section 6409 eligible facilities request, the presumptively reasonable timeframe under Section 332(c)(7), as prescribed by the FCC's Shot Clock order,[9] as interpreted by the 2014 Infrastructure Order,[10] shall begin to run from the issuance of the City's decision that the application is not an eligible facilities request. To the extent such information is necessary, as determined by the City, the City may request additional information from the applicant to evaluate the application under Section 332(c)(7), pursuant to the limitations applicable to other Section 332(c)(7) reviews. 3. Application for a Personal Wireless Service Facility. a. The applicant for a personal wireless service facilities site shall complete the application, and any addendum to the application, provided by the Planning and Zoning Department. The application must be completed for all personal wireless service facilities sites, both for those sites which require a conditional use permit and for those sites that meet the then current zoning criteria. b. The application may be revised from time to time, as reasonably determined by the Planning and Zoning Department to be consistent with state and federal law.[11] 4. Exemptions. These regulations do not apply to a building, other structure or land under the control, administration or jurisdiction of state or federal agencies. B. Recycling Facility. 1. A Recycling Facility shall comply with all applicable Hidalgo County, State of Texas, and Federal regulations and permit requirements prior to approval. 2. A Recycling Facility shall be located at least one thousand (1,000) feet from any residential use or district. 3. A Recycling Facility shall be located on at least ten (10) acres. 4. A minimum continuous 6-foot opaque buffer shall screen the use from all sides. C. Solid Waste Facility. 1. A Solid Waste Facility shall comply with all applicable Hidalgo County, State of Texas, and Federal regulations and permit requirements prior to approval. 2. A Solid Waste Facility shall be located at least one thousand (1,000) feet from any residential use or district. 3. A Solid Waste Facility shall be located on at least ten (10) acres.

( Ordinance 2026-16 adopted 2/9/2026 )

Ask a question about McAllen law

Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.