§ 5.4.6: Inspection of Public Improvements.
A. Conformance with Approved Construction Plans. 1. Construction shall be in accordance with the approved plans and City standards. 2. Any significant change in design required during construction shall be made by the applicant's engineer, funded by the applicant and shall be subject to approval by the City Engineer/Utility Engineer. B. Preliminary Inspection Required. 1. The applicant, upon completion of drainage, roads, streets, water, reclaimed water, wastewater and other facilities intended for the use of the public, or purchasers or owners of lots fronting or adjacent there to, shall request a preliminary inspection from the City Engineer/Utility Engineer. 2. After preliminary inspection, the City Engineer/Utility Engineer shall notify and provide the applicant with a written punch list of any issues the applicant must rectify in order for the public improvements to be in accordance with the approved construction plans and City standards. C. Final Inspection. 1. The applicant, upon rectifying any issues identified in the preliminary inspection punch list (if applicable), shall request from the City Engineer/Utility Engineer a final inspection. 2. The City shall provide letter of final acceptance after the final inspection if the applicant has properly addressed any issues identified in the preliminary inspection and documented in the associated punch list, and are now installed in accordance with the approved construction plans and City standards. D. Letter of Final Acceptance. 1. If all improvements are completed, inspected, tested (if applicable), and determined by the City Engineer/Utility Engineer to be in conformance with the provisions of the UDC and the City's standards and all inspection fees have been paid, then the City Engineer/Utility Engineer shall issue a letter of final acceptance to the applicant. 2. Dedication and acceptance language shall be recorded with the final plat or provided by a separate document if requested and approved by the City Engineer/Utility Engineer. 3. A note shall be placed on the plat to address the maintenance of public improvements by either the City, the public utility service provider or the property owner. 4. The applicant shall submit to the City record drawings (refer to subsection E) and a warranty letter after receiving the letter of final acceptance. 5. A final plat application shall not be accepted by the City until the applicant submits to the City Engineer/Utility Engineer the as-built drawings and received approval of the warranty letter. 6. A letter of final acceptance shall mean that the applicant has transferred all rights to all the public improvements to the City for title, use, and maintenance, this shall not release the applicant from the warranty letter. E. As-Built Drawings. 1. The purpose of the City requiring as-built drawings is to have a record of how public improvements were constructed in the field. 2. The applicant must submit the as-built drawing after receiving a letter of final acceptance by the City Engineer/Utility Engineer. 3. All sheets for the as-built drawings shall show all changes made in the construction plans during construction, and on each sheet, there shall be a "as-built" stamp bearing the signature of the engineer and date. 4. Digital files of all the as-built drawings shall be submitted by the applicant in AutoCAD and Adobe PDF formats, as required by the City. F. Inspection and Testing Fees. 1. Inspection and testing fees shall be established by the City and set forth in the adopted fee schedule. 2. The applicant may be charged an additional inspection and testing fee to reimburse the City the actual inspection cost if the City is required to have third-party inspections of the public infrastructure in each subdivision or development. G. Warranty Letter. 1. Construction company shall be responsible for submitting as-built drawings, warranty letter, and any other information as required by the City Engineer/Utility Engineer.
( Ordinance 2026-16 adopted 2/9/2026 )
Ask a question about McAllen law
Corpus searches the McAllen sections it holds and shows the ones that match, with their citations. Free, no sign-in.