§ 110-403 — Types of BMP credit
Code of Ordinances of the City of McKinney, Texas (Codified through Ordinance No. 2022-12-145, enacted December 20, 2022 (Supp. No. 37 archive; publisher-stale)) · McKinney Code of Ordinances § 110-403
Corpus is an independent public-information project, not the official City of McKinney website. Stable reference: corpuslaw.us/code/97badb0a-b62d-4c28-aee4-105fc95efa42
Sec. 110-403. - Types of BMP credit.
Individual properties may be eligible for BMP credit against SDUS fees up to a maximum total combined BMP credit per property of 40 percent. Types of BMP credit are available up to the maximum percentage identified for the following onsite BMP credit options, which BMP credit options are further explained in the city's stormwater credit policy along with the process to qualify for and obtain each BMP credit option. Table 1 BMP Credit Options BMP Credit Option | Maximum Percent BMP Credit Allowable 1. Voluntary community cleanup program (onsite or downstream) | 5 2. Single stage detention/retention facilities | 5 3. Aeration fountain | 5 4. Parking lot sweeping | 5 5. Industrial facility compliance | 5 6. Riparian preservation | 10 7. Multi-stage detention | 15 8. Extended detention | 20 9. Permanent structural controls | 40 10. Zero discharge credit | 40 Each BMP credit option listed above is given to encourage voluntary practices that will benefit the surface water drainage utility system and stormwater management program.
(Ord. No. 2015-04-030, § 8, 4-7-2015)
Ask a question about McKinney law
Corpus searches the McKinney sections it holds and shows the ones that match, with their citations. Free, no sign-in.
