For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 90-241 — Construction permit

Code of Ordinances of the City of McKinney, Texas (Codified through Ordinance No. 2022-12-145, enacted December 20, 2022 (Supp. No. 37 archive; publisher-stale)) · McKinney Code of Ordinances § 90-241

Corpus is an independent public-information project, not the official City of McKinney website. Stable reference: corpuslaw.us/code/a959cd5c-a7c2-48d6-beb5-cfd18434b47b

Sec. 90-241. - Construction permit.

(a) After registration has been completed, a separate construction permit for each work location must be obtained from the public works department. Nothing in this article relieves a public service provider from obtaining a construction permit under this article to perform work in the public right-of-way. (b) A person shall not perform any construction, except for an emergency activity, within a public right-of-way without first obtaining a permit from the public works department prior to the start of construction. A person who undertakes any work outside of the public right-of-way that will cut, break, or otherwise damage the public right-of-way shall also obtain a permit. (c) A construction permit is not required under this section if the activity in the public right-of-way consists exclusively of: (1) Routine maintenance or repair of facilities that does not involve any of the following: the cutting or breaking of pavement; the closure of a traffic lane for longer than 24 hours; boring; or excavation greater than 100 cubic feet; (2) A connection of real property to a utility service on the same side of the public right-of-way, if the connection does not require a pavement cut in the right-of-way; (3) The replacement of a single damaged pole within a ten-foot radius of the damaged pole; or (4) Installation of aerial lines on existing poles, or installation of aerial lines on not more than ten new poles. (d) If no construction has commenced under a permit within 30 calendar days after issuance of the permit, the permit becomes null and void, and a new permit is required before construction may be performed in the public right-of-way. An extension to a permit may be granted by the director only before the permit expires.

(Ord. No. 2008-08-080, § 2, 8-19-2008)

Ask a question about McKinney law

Corpus searches the McKinney sections it holds and shows the ones that match, with their citations. Free, no sign-in.