§ 11-148 — Permits
Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code § 11-148
Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/2929d102-de9b-4c40-a09d-c02085d0935c
Sec. 11-148. - Permits.
The City has several permits related to storm drainage. Some of these permits are listed below and explained in detail in the following paragraphs. Permits required by other ordinances may also be needed. (1) Development permit. All developers, owners or builders shall obtain and submit for approval a development permit application for new construction, placement of fill, new manufactured home sites, alteration of a waterway, substantial improvements to existing structures or manufactured homes, or improvements to existing structures, or manufactured homes in the floodplain of the design flood that will result in increasing the overall outside dimensions of the structure or manufactured home. Permit applications shall comply with the City of Mesquite Engineering Design Manual. The City Engineer will determine whether the review of a flood study will be completed by City staff or if, due to complexity or time constraints or resource limitations, an engineering consulting firm will be required to assist City staff in the review. The cost of this review shall be borne by the developer, engineer or property owner submitting the flood study. The City shall first obtain a cost estimate for the City staff review time or if review is being completed by an engineering consultant, a cost estimate from the engineering consultant will be obtained. Before the review begins, the developer, engineer or property owner submitting the flood study shall deposit with the City funds equal to the cost estimate. If applicable, the City shall disburse the funds to the consulting engineer as the review progresses. Should the review fees exceed the initial estimate, the developer, engineer or property owner submitting the flood study shall be informed of the shortage and a new estimate shall be made by the City staff or consultant engineer to complete the flood study review. Additional funds will then be deposited with the City by the developer, engineer or property owner submitting the flood study to cover the estimated shortfall before the review of the study resumes. If an existing non-residential structure is proposed for flood-proofing, then a certificate sealed by a registered professional engineer in the State of Texas shall be submitted stating that all of the flood-proofing criteria listed in the City of Mesquite Engineering Design Manual will be met. Construction or renovation projects cannot begin until the City issues the development permit. (2) Elevation certificate. Developers, owners or builders adjacent to the design floodplain, other existing creeks, swales or ditches, or other flood prone areas as designated by the City Engineer shall complete an elevation certificate prior to issuance of a certificate of occupancy by the City. Elevation certificate forms can be obtained at the office of the City Engineer. (3) Proceeding without the applicable permits. Any developer, owner or builder who fails to obtain the applicable development or other necessary permits before beginning the subject project is in violation of this article. Furthermore, any act or omission of any owner or developer of land subject to the provisions herein which has as its effect the circumventing of the intent and purpose of this article shall be considered in violation of same. In addition to the penalties outlined in Section 11-128, no building permit, plat, site plan or certificate of occupancy shall be issued for any construction, reconstruction or development upon any land where such construction, reconstruction or development is not in conformity with the requirements and intent of this article. Anyone who violates any of the terms and provisions of this article shall be denied a building permit, etc., until the violation is corrected. (4) Deviations from permit terms. Permits may be revoked by the City Engineer if, upon periodic inspection, he determines that the work is not progressing in accordance with specifications of the approved plan and permit. Field changes to storm sewer plans can be made only upon approval by the City Engineer. Record drawings shall be submitted to the City Engineer at the completion of the project.
(Ord. No. 4216, § 1, 7-2-12; Ord. No. 4674, § 1(Exh. B(8)), 5-20-19)
Ask a question about Mesquite law
Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.
