Sec. 15-196. - Construction work—Regulation by City.

All construction shall comply with all applicable local, state and federal laws, including the following: (a) Existing facilities. Before initiating construction on rights-of-way, a user will make all reasonable efforts to attach its facilities to existing poles and to share existing conduit space as appropriate. Nothing contained in this article shall be construed to require or permit the attachment on or placement in a user's facilities of any electric light or power wires, or facilities or other systems not owned by the user. If the City desires to attach or place electric light or power wires, communications facilities or other similar systems or facilities in or on the user's facilities, then a further separate, non-contingent agreement with the user shall be required. Nothing contained in this article shall obligate the user to exercise, or restrict the user from exercising, its right to enter voluntarily into pole attachment, pole usage, joint ownership or other wire space or facilities agreements with any person authorized to operate in the rights-of-way of the City. (b) Traffic disruptions. The user shall endeavor to minimize disruptions to the efficient use of the rights-of-way by pedestrian and vehicular traffic, and rights-of-way shall not be blocked for a longer period than shall be reasonably necessary to execute all construction, maintenance and/or repair work. All lane closures must comply with the Texas Manual on Uniform Traffic Control Devices. (c) Pole placement. All poles placed shall be of sound material and reasonably straight, and shall be set so that they will not interfere with the flow of water in any gutter or drain, and so that they will not unduly interfere with ordinary travel on the streets or sidewalk. The location and route of all poles, stubs, guys, anchors, conduits, fiber and cables placed and constructed by the user in the construction and maintenance of its facilities in the City shall be subject to the lawful, reasonable and proper control, direction and/or approval of the City. (d) Work in accordance with permit. All construction and installation in the rights-of-way shall be in accordance with the permit for the facilities. The Director shall be provided access to the work and to such further information as the Director may reasonably require to ensure compliance with the permit. A copy of the right-of-way permit and approved engineering plans shall be maintained at the construction site and made available for inspection by the City at all times when construction or installation work is occurring. (e) Time for completion. All construction or installation work authorized by permit must be completed in the time specified in the right-of-way permit. If the work cannot be completed in the specified time periods, the user may request in writing an extension from the Director. So long as the written extension request is made before the permit has expired, work may continue pending a decision by the Director on the extension request. (f) Prior notification. The Department must be notified twenty-four (24) hours in advance that construction is ready to proceed by either the user, its contractor or other representative. If not previously provided, such notice shall include information required in Section 15-195(d)(12). (g) Signage. All utility signage and markers shall be of the flexible vertical fiberglass Carsonite-type and no more than forty-eight-inches above grade, or stickers and plaques placed on existing facilities such as poles, pedestals and cabinets, or placement of marker buttons on curbs, sidewalks or pavement. Generally, separate signage is discouraged. Signage shall be flexible so that it does not present a danger to pedestrians, bicyclists and motorists if the signage is impacted at speed. Metal poles and signs are prohibited. Damaged, dilapidated, defaced or obsolete signage is prohibited and must be removed within fifteen (15) days from receipt of notice by the City. Except as required by law, user shall not post any other signage or advertising at the location, including on a pole, wireless facility, ground equipment cabinet or back-up battery. Signage must be updated by the user within ninety (90) days of a company name change of the user. An information sign will be posted at both ends of the construction area unless other posting arrangements are approved or required by the Director. (h) Accessible routes. Obstructions or protrusions of utility poles, guy lines, pedestals, cabinets or other utility facilities are prohibited over a sidewalk, ramp, trail or other transportation facility if they hinder or prevent full use of the facility or impede full access. (i) Bollards. Use of bollards in City right-of-way is prohibited. Any facility at risk of impact by the travelling public shall be relocated to a safer location rather than be protected by bollards. (j) Visibility obstructions. No facility shall be installed in violation of Chapter 9, Article X, Sections 9-305 through 9-308 related to sight visibility and view obstructions. (k) Erosion and stormwater controls. Erosion control measures (e.g., silt fence) and advance warning signs, markers, cones and barricades must be in place before work begins. User shall be responsible for stormwater management erosion control that complies with City, state and federal guidelines. Upon request user may be required to furnish documentation submitted or received from federal or state governments. (l) Construction traffic control, barricading and signing. The utility company and their contractors and subcontractors are responsible for design and implementation of a plan during construction and maintenance operations for traffic control, barricading and signage that shall, at a minimum, meet the requirements of the current "Texas Manual of Uniform Traffic Control Devices," Sections 11-104 and 11-105 of this Code, and the City of Mesquite "Work Zone Traffic Control Guidelines," Mesquite City Code Section 9-86. No alley or street shall be closed without forty-eight (48) hours' notice to the assigned Public Works construction inspector. (m) Obstructions prohibited. Facilities shall not obstruct, impede or hinder pedestrian or vehicular travel or public safety on a right-of-way, or render right-of-way noncompliant with applicable codes, including the Americans with Disabilities Act. The City's minimum right-of-way dimensions shall be maintained. (n) Damage to utilities. User, contractor or subcontractor shall notify the Department immediately of any damage to other utilities either City or privately owned. (o) Cuts. Except in the event of an emergency, when a street or sidewalk cut is required, prior approval must be obtained from the Department and all requirements of the Department shall be followed. Repair of all street and sidewalk removals shall be made promptly to avoid safety hazards to vehicular and pedestrian traffic. (p) City utilities. Installation of facilities must not interfere with City utilities in particular gravity dependent facilities. (q) Cable or facility burial depth. All conductor burial depths shall comply with Section 353.D of the National Electrical Safety Code, approved by the American National Standards Institute. Minimum depth for voltages zero (0) to six hundred (600) volts is twenty-four (24) inches below the bottom of the edge of pavement for streets with curbs and gutters or below the roadway ditch flowline grade for streets without curbs and gutters. New non-municipal facilities must be installed to a depth approved by the Department. (r) Boring. All directional boring shall have a locator place bore marks and depths while boring is in progress. The locator shall place a mark at each stem with a paint dot and shall mark the depth of at least every other stem. (s) Working hours. Except in emergencies, the working hours in the rights-of-way are the time period between one (1) hour after sunrise and until sunset Monday through Friday. Non-emergency work that needs to be performed outside these hours must be approved in advance by the Department. Any non-emergency work performed on Saturday must be approved forty-eight (48) hours in advance by the Department. Directional boring is permitted only Monday through Friday from 7:00 a.m. to 6:00 p.m. unless approved in advance by the Department. No work will be done except for emergencies on Sundays or City holidays. (t) Construction inspection. The City's Public Works construction inspector shall be notified prior to any trench backfilling or pavement repair within a City right-of-way so that a proper inspection can be made. If City inspection is required outside normal working hours, users shall pay an additional overtime inspection fee based upon a calculation of the actual additional cost to the City of the inspection work required. Upon request, documentation of the overtime inspection fee shall be provided to user before the inspection. (u) Line locations. Users working in the rights-of-way are responsible for obtaining line locates from all affected utilities or others with facilities in the rights-of-way prior to any excavation. Use of Geographic Information System or the plan of record does not satisfy this requirement. User shall be responsible for verifying the location, both horizontal and vertical, of all affected facilities prior to any excavation or boring with the exception of work involving lane closures as set forth above. User shall provide location data of its facilities to all other utilities when requested to do so by other utilities preparing to work in the area of such facilities. Requests for location of City-owned utilities shall be made no later than forty-eight (48) hours in advance of construction. The user shall properly mark the proposed location of its facilities in order that City locators can appropriately mark City-owned utilities. Only water soluble paint is permitted for markings using paint. (v) Manholes/handholes. Placement of all manholes and/or handholes must be approved in advance by the Department. Handholes or manholes shall not be located in sidewalks unless approved by the Department. (w) Pumping. Construction that requires pumping of water or mud shall be contained in accordance with City ordinances, federal and state law, and the directives of the Department. (x) Restoration. (1) Restoration of rights-of-way shall be to the reasonable satisfaction of the Department. Restoration shall be made in a timely manner as specified by approved Department schedules and to the satisfaction of the Director. (2) If restoration is not satisfactory or is not timely performed, all work in progress, except that related to the problem, including all work previously permitted but not complete may be halted and a hold may be placed on any permits not approved until all restoration as required herein is complete. If restoration work is not completed in a timely manner, the user is subject to the criminal penalties described in Section 15-205, and the additional following procedures shall be followed: a. The City shall provide the user with reasonable notice of failure to act and request restoration. b. If the user continues to delay, the Director and the user will jointly review the restoration request in an expeditious manner to establish a mutually acceptable completion date for the restoration. c. If the user continues to delay or does not meet the revised completion date, the Director shall provide not less than five (5) calendar days written notice to the user advising of the City's intent to perform the restoration. d. If, after expiration of the written notice required by the preceding sentence, the user continues to delay, the City shall have the right to perform the restoration. The City shall not be liable to the user for any damage to any of its facilities and shall not be liable in any event for any consequential damages relating to service interruptions. If the restoration performed by the City involves the construction or improvement of base or pavement of rights-of-way, user shall not thereafter disturb such rights-of-way for a period of three (3) years after completion of such improvements except when necessary in the event of an emergency. (3) User shall warrant all pavement repairs for a period of two (2) years after restoration has been complete. The restoration shall include but not be limited to: a. Replacing all ground cover with the type of ground cover damaged during work, or better, by sodding as directed by the Department; b. Installation of all manholes and handholes as appropriate; c. Filling in or daily covering all bore pits, potholes, trenches or any other holes unless other safety procedures are approved by the Department; d. Leveling of all trenches and backhoe lines (all trench backfill must comply with density requirements per the City standards and the City must be provided with a copy of all density reports); and e. Restoring all landscaping, ground cover and sprinkler systems to the original condition. (y) Nonresidential placements. In nonresidential zoning districts, facilities shall be located between tenant spaces, storefront bays or other adjoining properties where their shared property lines intersect the right-of-way. (z) Colors and finishes. All facilities installed in the right-of-way shall be in earth tone colors or in colors that blend with the surroundings, or, if on a service pole or municipally owned pole shall match the color and finish of the pole, or must be approved by the City. (aa) Courtesy and proper performance. User shall make citizen satisfaction a priority in using the right-of-way. User shall train its employees to be customer service oriented and to positively and politely interact with citizens when dealing with issues pertaining to its facilities and related ground equipment in the right-of-way. User's employees shall be clean, courteous, efficient and neat in appearance and committed to offering the highest quality of interaction with the public. If, in the opinion of the City Manager or designee, user is not interacting in a positive and polite manner with citizens, the City Manager may request user to take all remedial steps to conform to these standards. (bb) Drug policy. It is the policy of the City to achieve a drug-free workforce and workplace. The manufacture, distribution, dispensation, possession, sale or use of illegal drugs or alcohol by user's employees, contractors, subcontractors, sub-network provider's or vendors while on City premises is prohibited. (cc) Responsibility of user. Users are responsible for the workmanship and any damages by contractors or subcontractors. A responsible representative of the user shall be available to the Department at all times during construction. The provisions of this section are solely for the benefit of the City and the user and are not intended to create, grant or affect any rights, contractual or otherwise, to or of any other person.

(Ord. No. 4503, § 1, 8-21-17)