§ 16-35 — Participation and reimbursement by city in the cost of oversize water and wastewater mains
Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code § 16-35
Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/7bc1002d-f891-4f0a-9c10-f4802e20a02a
Sec. 16-35. - Participation and reimbursement by city in the cost of oversize water and wastewater mains.
(a) City participation policy. The city may participate in the reasonable construction costs of oversize water or wastewater mains and appurtenances thereto that exceed twelve (12) inches in diameter. The developer initially shall be responsible for the entire cost of the oversize main. (b) No funds available. In no event will the city be required to participate in the costs of oversize mains pursuant to this section if there are no funds available for such purposes. (c) Participation and reimbursement requests. A request for city participation authorized by subsection (a) and (b) hereof shall be initiated through the submission of an application for participation by the developer prior to the initiation of construction. The application shall be accompanied by engineering drawings approved by the city engineering division showing the reimbursable items, a copy of estimated costs for construction, final quantities, oversize calculations for all reimbursable items, performance bond and a project location map. (d) City reimbursement. If the request for city participation is approved by the city council following dedication and acceptance of a facility or appurtenances in which it has agreed to participate, the city shall refund the costs of oversizing such facility in accordance with the following procedures and standards. (1) Oversizing standards. The following standards apply to the determination of the costs of oversizing water and/or wastewater mains: a. Where the size of the water or wastewater main needed exceeds that of a 12-inch diameter water or wastewater main, the size of the main to be installed shall be determined by the city engineer whose decision shall be final. b. The amount of the city's participation shall be determined by the city council and shall not exceed the difference in cost between a 12-inch diameter main with appurtenances and the oversized main with appurtenances as required by the city engineer. (2) Oversize cost determination. The extent of the city's participation in the costs of oversized mains shall be determined by comparing costs computed by the following two (2) methods: a. Method 1. The developer shall take at least three (3) bids on installation of a system using a 12-inch diameter main and the larger size that will actually be installed. Copies of the bids, tabulations and figures shall be submitted to the city engineer. Calculations shall delineate the total cost for installation of the oversize mains with appurtenances, along with the cost for installing 12-inch diameter mains with appurtenances, with the differences noted as participation by the city. b. Method 2. The city engineer shall establish unit prices for similar types of construction done in the previous twelve (12) months. These unit prices shall establish costs based upon estimates obtained on similar projects within the last twelve (12) months or base unit costs used to determine the maximum difference in cost between the 12-inch diameter main size and the cost of oversize mains to be installed. The unit prices shall be incorporated into this section as if fully set forth herein and shall be used to determine the city's participation. c. City engineer's option. The city engineer shall have the option to establish the method in subsection b. whenever he considers the results of the method in subsection a. to be unreasonable or whenever the developer fails to submit the proper information as required. d. Engineering costs. The city shall pay a maximum of six (6) percent of the city's cost for engineering fees that includes surveying, construction staking and supervision. e. Street rights-of-way. A development shall be responsible for the full cost of utilities which cross street right-of-way up to a maximum width of one hundred sixty (160) feet. If required street right-of-way exceeds one hundred sixty (160) feet, the city will assume the cost of the excess length of the utility line as oversize participation. (3) Exception to city participation. The city will not participate in the cost of an oversized main if the development requires a main equal to the line constructed to serve the development.
(Ord. No. 3372, § 1, 6-19-00)
Ask a question about Mesquite law
Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.