§ 16-39 — Procedure for establishing pro rata fees
Code of the City of Mesquite, Texas (Supp. No. 71: codified through Ordinance No. 5259, enacted July 20, 2026) · Mesquite City Code § 16-39
Corpus is an independent public-information project, not the official City of Mesquite website. Stable reference: corpuslaw.us/code/9879cd74-e357-4272-b272-1373d231a3ea
Sec. 16-39. - Procedure for establishing pro rata fees.
(a) Request for pro rata fees. Prior to final acceptance of water or wastewater main improvements by a developer, the developer shall submit a written request to the city engineer stating whether a pro rata fee will or will not be requested to be established for the main that the developer installed. (b) Submittal requirements. The request to establish a pro rata fee shall be on a pro rata contract form provided by the city. The request shall include a copy of the actual contract with unit prices. The request must identify the cost of the main including fire hydrants, valves, fittings, manholes and other appurtenances which are determined necessary for the construction of the line. (c) Verification of costs by city engineer. The city engineer shall verify the developer's calculations for the pro rata reimbursement. In the event of a discrepancy, the city engineer shall establish the cost per foot for the pro rata fee based upon verifiable costs. (d) Reimbursement amount. The maximum amount for which a developer may be reimbursed from the proceeds of pro rata fees for the main installed shall not exceed the costs determined by the city engineer under subsection (c) plus engineering fees, calculated at the rate of six (6) percent of the verified construction cost. (e) Pro rata for permanent lift station or sanitary sewer trunk main. In the event a permanent lift station or sanitary sewer trunk main that exceeds the area necessary to serve a development is required pursuant to section 16-33 and section 16-34, the developer must submit a written request for establishment of a pro rata fee for the permanent lift station or sanitary sewer trunk main which shall be on a cost per acre basis to be eligible for pro rata. The costs eligible for reimbursement shall include the lift station, force main and other appurtenances or sanitary sewer trunk main, and other items included in subsection (b). The city engineer shall be responsible for approving the cost per acre submitted by the developer for the drainage area served by the facility, as provided in subsection (c).
(Ord. No. 3372, § 1, 6-19-00)
Ask a question about Mesquite law
Corpus searches the Mesquite sections it holds and shows the ones that match, with their citations. Free, no sign-in.
