For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-1-4 — Site requirements

Municipal Code of the City of Midland, Texas (Supp. No. 1, Update 2: codified through Ordinance No. 10709, enacted February 10, 2026) · Midland Municipal Code § 4-1-4

Corpus is an independent public-information project, not the official City of Midland website. Stable reference: corpuslaw.us/code/bfe7ff49-8bd8-4452-a53c-a3c3e636f2dd

Sec. 4-1-4. - Site requirements.

The following site requirements shall be satisfied or committed prior to a building permit being issued for any new construction or substantial addition to the development or redevelopment of a new parcel of land. (A) Sidewalk construction and permits therefor required: 1. Sidewalks required. Sidewalks shall be constructed within all street rights-of-way adjacent to all tracts or lots at the time of their initial development to the full length of the property line of the lot or tract involved. Sidewalks shall be constructed within all street rights-of-way adjacent to all lots or tracts, which were initially developed without sidewalks when subsequent development exceeds 25 percent of the existing floor area and also exceeds 1,000 square feet in floor area. On properties situated at the corner of intersections, sidewalks are required both on the front and side along the full length of the tract or lot involved on which development is being made and such sidewalks shall be connected to the street pavement, if existing, at all street intersections. Sidewalks will be located and constructed as specified in Section 9-4-1 of the City Code. No such sidewalks shall be constructed until a permit approved by the Director of Engineering Services of the City has been secured, as provided for in Title IX, "Public Ways and Property," Chapter 9-4, "Sidewalks, Driveways and Curbings," of the Midland City Code. If sidewalks, in good condition, exist adjacent to the developed property, newly constructed sidewalks must provide connections thereto. The Building Official of the City shall not issue any final electrical or gas clearance or certificate of occupancy and completion until all sidewalks required to be constructed have been finally completed and approved by the Director of Engineering Services of the City, except pursuant to Section 4-1-9 of the Midland City Code. 2. Exceptions. The following exceptions shall not apply on a street classified as an arterial, freeway or interstate. (a) Where the same side of a street, between two intersecting streets, is 75 percent or more developed and has no existing sidewalks, then no sidewalks shall be required in the remaining undeveloped portion of that side of the street. This exception shall also apply to cul-de-sacs which are 75 percent or more developed and have no existing sidewalks. (b) Where the tract or lot being developed was platted pursuant to an application for final plat filed with the City on or before June 30, 1994: (1) No sidewalks shall be required on any street frontage on which the adjacent tracts or lots adjoining on both sides have no existing sidewalks, or (2) No sidewalks shall be required on any street frontage on which the adjacent tract or lot adjoining a corner lot has no existing sidewalk. 3. Appeals process. Any person wishing to appeal the requirement of the sidewalk construction on the basis that such construction would be infeasible, impractical, or would constitute a hazard to public safety, may appeal to the City Manager, or his designee, prior to constructing the sidewalk. The person may seek an exemption from all or part of the sidewalk construction. The City Manager, or his designee, shall make a decision within ten business days of receiving the appeal in writing. The City Manager, or his designee, shall ensure that a person has all rights under applicable law. A person shall incur no financial hardship by exercising his or her right to appeal. (B) Parking and loading areas: 1. Barriers required along streets and alleys. Where an off-street parking, loading or vehicle storage area is to be paved or modifications to such area are to be made adjacent to a public street or alley, the paved area shall not project into the public right-of-way unless a curb, multiple wheel stops, or other effective barrier(s) shall be erected to prevent parked or stored vehicles from encroaching into said right-of-way, except in one and two family developments. However, if existing conditions would make such a restriction unreasonably difficult to satisfy, the City Manager may issue a permit for an encroachment into the right-of-way of a street when he determines that the following conditions will be met: (a) The encroachment will not create a traffic hazard and adequate space for pedestrian traffic will be maintained. (b) Barriers as specified above are provided to prevent encroachment beyond the line authorized by the permit. (c) The permit conditions of Section 10-1-10(A)5(a)(1) are met. Parking provided by encroachment into a public right-of-way shall not be considered off-street parking in determining satisfaction of any requirement for such parking. 2. Access to alleys. Where required or non-required parking spaces and loading spaces are permitted which depend upon an alley for access, the abutting property shall have a permanent opening of not more than 25 feet per separately owned parcel. All additional access shall be granted by joint alley use agreement authorized by the City Manager. Such agreement shall provide for a fee per the current adopted fee schedule and shall be revocable by the City Manager upon his determination that the access must be revoked or impaired to accommodate some other public purpose. Such agreement shall be effective for one year from the date of issuance and shall automatically renew from year to year upon payment of the prescribed fee, as said fee may be amended from time to time, unless said agreement is earlier revoked as provided for herein above. 3. Parking, loading areas, and traffic patterns. A building permit shall be required for any new parking area or change in the arrangement of an existing parking area. Where any structure is to be built or improved, the permit may be considered part of the building permit for the structure. In applying for such permit, the applicant shall provide a site plan showing the location and arrangement of the parking areas, to include parking areas, aisles, driveways and abutting street paving, with locations of nearby median openings and street intersections. A permit shall not be given by the Building Official for the construction of any building or parking area where said building or parking area is to be changed and such change will affect or change the traffic pattern entering and exiting the property where such building or parking area is located, unless and until the director of engineering services reviews such traffic patterns and makes appropriate recommendations as to the proper control of such traffic to provide safe entry to and exit from the abutting rights-of-way and to provide that the traffic capacity of the abutting rights-of-way is retained. The recommendations of the director of engineering services shall be in accordance with all City ordinances and City engineering specifications concerning traffic control and the use of the public rights-of-way, and such recommendations shall include the location, size and construction of entryways and exit ways along the rights-of-way abutting such property. All such recommendations of the director of engineering services shall be conditions of the permit issued by the Building Official. (C) Creation of a building site: 1. No permit for the construction of a building or buildings upon any tract or parcel of land shall be issued until a building site, building tract or building lot has been created by complying with one of the following conditions: (a) The lot or tract is represented as a separate lot or tract on a plat of record, properly approved by the Planning and Zoning Commission and filed in the Plat Records of Midland County, Texas. (b) The site, plot or tract is all or part of a site plan officially approved by the Planning and Zoning Commission or City Council, which site plan provides all utility and drainage easements, alleys, street and other public improvements necessary to meet the normal requirements for platting including the designation of building areas and access provisions, and such easements, alleys and streets have been required and properly dedicated and the necessary public improvements provided. (D) Refuse collection: Where dedicated alleys are not conveniently located for refuse service to a lot or tract, a building permit shall not be issued for such lot or tract until a plan for locations of refuse collection within the property and a guarantee of access to such locations has been submitted by the permit applicant or property owner and found satisfactory by the director of solid waste or his designated representative. Except upon specific permission of the director of solid waste, locations adjacent to public streets shall not be acceptable. (E) Site plan review: In the event that Section 11-2-5(B) of this Code shall be applicable to the proposed development of a lot, no building permit shall be issued until approval of the site plan required by said Section 11-2-5(B)8 is obtained.

(Ordinance 9921, sec. 1, adopted 5/28/2019)

Ask a question about Midland law

Corpus searches the Midland sections it holds and shows the ones that match, with their citations. Free, no sign-in.