§ 13-2-191 — Requirements
Code of Ordinances, City of Odessa, Texas (Includes legislation through Ord. No. 2026-22 adopted August 11, 2026) · Odessa City Code § 13-2-191
Corpus is an independent public-information project, not the official City of Odessa website. Stable reference: corpuslaw.us/code/a217a27a-c0ff-458d-b58a-1cc217c8f2d4
§ 13-2-191: Requirements.
(a) The director shall provide an application requiring all users discharging to the POTW(s) to provide information necessary to evaluate discharges to the POTW(s) and satisfy EPA requirements. (b) Existing users and significant industrial users shall update the application under the following conditions: (1) A minimum of every five (5) years. (2) If significant changes to the user’s operations (e.g. additional wastestreams, increased discharge volume, additional or increased pollutants, addition of a categorical wastestream, etc.) cause the application filed with the city to be inaccurate. (c) Existing significant industrial users. If a significant industrial user is currently operating under a wastewater discharge permit issued by the director and is discharging wastewater into the POTW(s) prior to the effective date of this division and wishes to continue such discharges in the future, the user shall, within ninety (90) days after said date, or for a shorter time period if allowed by the director, submit a revised wastewater discharge application in accordance with this section, and shall not cause or allow discharges to the POTW(s) to continue after one hundred eighty (180) days of the effective date of this division except in accordance with a wastewater discharge permit reissued by the director. (d) New users. (1) In order to comply with the objectives of section 13-2-101, any user, deemed necessary by the director, who proposes to begin or recommence discharging into the POTW(s) must complete such application prior to the beginning or recommencing of such discharge. (2) Wastewater discharge applications are mandatory for significant industrial users proposing to begin or recommence discharge to the POTW(s). (e) The control authority reserves the right to take the following time periods from the receipt of the completed application to review the application information to determine the conditions which must be met prior to discharge: (1) New users: Thirty (30) days. (2) Significant industrial users: One hundred eighty (180) days. (3) Existing users who propose to implement process changes that will result in changing their user classification significant industrial user: One hundred eighty (180) days. (f) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. The timeframe established in subsection (c) of this section will not begin until the control authority receives an application which it deems to be complete.
( Ordinance 2011-01 , sec. 1, adopted 1/11/11 )
Ask a question about Odessa law
Corpus searches the Odessa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
