§ 13-2-77 — Water conservation plan
Code of Ordinances, City of Odessa, Texas (Includes legislation through Ord. No. 2026-22 adopted August 11, 2026) · Odessa City Code § 13-2-77
Corpus is an independent public-information project, not the official City of Odessa website. Stable reference: corpuslaw.us/code/ff2ddac6-d809-4dcd-820e-e7ef5709e191
§ 13-2-77: Water conservation plan.
(a) Introduction. This 2024 revision of the water conservation plan (plan) establishes water conservation measures, encourages water customers to conserve available water supplies, and monitors the effectiveness of the plan. The plan is submitted to the Texas Water Development Board as required by section 13.146 of the Texas Water Code. (b) System profile. (1) Source water. (A) The city receives all of its water, untreated, from the CRMWD. The majority of the water is surface water from Lake Ivie. Other surface water sources include Lake Thomas and Lake Spence when available. When needed, well water can be delivered to supplement surface water supplies. Well water is received from Ward County wells. (B) The city does not operate any reservoirs or develop any of its source water. Pursuant to the provisions of the contract for raw water between city and CRMWD, CRMWD is responsible for providing the needed raw water resources to the city. (2) Water treatment. (A) The city operates a conventional water treatment plant (WTP) using coagulation, flocculation, sedimentation, filtration, disinfection and pH adjustment for treatment of the surface water. The WTP's rated capacity is 55 MGD. (B) The maximum daily volume of water treated since 2000 has not exceeded 40 MGD. The plant capacity is sufficient under current projections to exceed 20 years. (3) Water service population characteristics. (A) The city provides potable water to customers inside the city limits as well as to the Ector County Utility District (ECUD), several industrial districts, and by contract to individual customers outside the city limits. In 2023, the estimated population served by the city's public water system was 159,868. (B) The following is a summary of the accounts served according to customer classification: Single-family | 35,632 Multifamily | 13,558 Commercial | 4234 Industrial | 10 Wholesale customer | 1 (4) Wastewater treatment. (A) The city provides wastewater treatment to its citizens, several industrial district customers, and by individual contracts to customers outside the city limits. Approximately 2.5 MGD of untreated wastewater is provided to the Gulf Coast Authority industrial wastewater treatment plant to assist in the treatment of their wastewater. This wastewater is diverted directly from the wastewater collection system. All other wastewater flow is treated at the Derrington Plant through extended aeration and single-stage nitrification treatment processes. This treatment is followed by clarification, disinfection and filtration. Treated water is either discharged to the Monahans Draw under the conditions of TCEQ Wastewater Discharge Permit No. WQ10238-002 or distributed to reuse customers. Sludge produced by the wastewater treatment process is dewatered and taken to the landfill for final disposal. (B) The Derrington Plant is rated at 12.7 MGD. The Derrington Plant currently receives between 5.5 to 7.0 MGD dry weather flow rates; therefore, treatment capacity is not an issue. (5) Ector county utility district (ECUD). The city has provided water to ECUD since approximately 1976. A master meter has been installed and meters flow to ECUD as a wholesale customer. The tracking of water is based on an automated meter infrastructure. (c) Water reduction goals. (1) Gallons per capita per day (gpcd) reduction. The currently required method for computing and tracking usage is gallons-per-capita-per-day (gpcd). The city will strive to reduce the gpcd usage by 0.5 gpcd each year for the next 10 years. The beginning gpcd baseline, established in 2019 (116 gpcd), is based on the average gpcd for the last five years. This projection may have to be adjusted based on new or changing industrial users or population, trends in weather, or available water resources. (2) Water loss reduction. Over the next 10 years, the city will strive to maintain its calculated water loss at less than 12%. (d) Best management implementation schedule. (1) Schedule. Description | Currently Implemented | Improve Existing Program | Implement by-2025 | Implement by-2030 | Implement by-2035 System water audit and water loss | [image] Water conservation pricing | [image] Addressing nonpayment and theft issues | [image] Prohibition of wasting water | | [image] School education | | [image] Plumbing code enforcement | [image] Landscape irrigation conservation | [image] Golf course conservation | [image] Park conservation | [image] Athletic field conservation | [image] Metering of all connections | [image] Meter replacement and maintenance | [image] | | [image] Wholesale agency assistance program | | | [image] Effluent reuse | [image] Public information | | [image] Leak detection and line rehabilitation | [image] | [image] (2) System water audit. The city will continue to annually conduct the water loss audit calculations published in the TWDB publication "Water Loss Audit Manual for Texas Utilities." The results of this annual audit will be used to determine the effectiveness of the city's water conservation program and whether adjustments to the program need to be made. (3) Water billing. (A) Water conservation pricing. Currently, the city uses an inclining block rate structure to encourage water conservation. During the annual development of the budget, revenues collected from the rates are evaluated to ensure sufficient funds are available to meet financial obligations, capital requirements, and operation and maintenance needs. The current rate structure is per 1,000 gallons and codified and made part of the city's Code of Ordinances in chapter 13, article 13-2, division 2, entitled "rates." There is also a minimum charge for the first 2,000 gallons based on the meter size. (B) Cut off for unpaid bills. Customers who do not pay for water service have their water service terminated approximately 20 days after the original due date. Service is not reactivated until payment arrangements are made. (C) Water theft. When water theft is determined, service is immediately disconnected and will not be reinstated until all fines and fees are paid. (4) Prohibition of wasting water. The city has implemented a nuisance water ordinance and enforcement strategy for the purpose of restricting the improper discharge of water by its discharge into the streets. Imposing hours of irrigation for automated irrigation systems will also be considered. (5) Plumbing code enforcement. The city enforces the 2018 International Plumbing Code which requires installation of the following water conserving fixtures in new construction. Fixture | Maximum Flow Rate Lavatory, private | 2.2 gpm at 60 psi Lavatory, public, (metering) | 0.25 gallon per metering cycle Lavatory, public (other than metering) | 0.5 gpm at 60 psi Shower head | 2.5 gpm at 80 psi Sink faucet | 2.2 gpm at 60 psi Urinal | 1.0 gallon per flushing cycle Water closet | 1.6 gallons per flushing cycle (6) School education program. (A) The city makes staff available to assist in teaching the curriculum or making water conservation related presentations at local schools as requested. (B) Tours of the WTP and water education brochures suitable for distribution to school children are also available. (7) Landscape irrigation conservation. (A) The city establishes minimum standards for installation of irrigation systems within the city and its extraterritorial jurisdiction. This article requires irrigation system designs which must be submitted to the city for review prior to the installation of the system. New irrigation systems must be designed, installed, maintained and repaired in a manner which will promote water conservation. This article requires the irrigation system to: (i) Operate at pressures provided by the distribution system. (ii) Limit water spray over impervious materials. (iii) Have separate zones based on plant material type, microclimate factors, topographic features, soil conditions and hydrological requirements. (iv) Include rain or moisture shutoff device. Repairs to existing automatic irrigation systems require replacement with a controller which has a rain or moisture shutoff device. (B) Beginning in 2010, a licensed irrigator or licensed irrigator technician must be onsite during the installation of the irrigation system unless the system is being installed by the homeowner. Failure to comply with the requirements of this article may result in a fine of up to two thousand dollars ($2,000.00) per day. (8) Golf course conservation. The three golf courses located within the city limits are irrigated with reclaimed water. Raw or potable water is only available to the golf courses if reclaimed water is unavailable. (9) Parks conservation. (A) The parks department has converted all of its parks irrigation systems, except one, from manual operation to automatic irrigation systems. The last park is currently under design to convert the irrigation system to an automated system. In addition, the following conservation related issues have been or will be incorporated into the city's parks operations: (i) All irrigation systems will be equipped with controllers that would allow future conversion to a master control irrigation system. (ii) Drip irrigation systems will be located in all planting beds. (iii) Plans are under development to convert all bubble systems to drip. (iv) Installation of low trajectory irrigation heads at the perimeter of the parks sites to reduce drift. Future irrigation systems will be designed to include the low trajectory irrigation heads along the parks perimeter. (v) Irrigation schedules for automated sites are programmed to irrigate at night. (vi) Plant materials indigenous to the city's climate and soil conditions are used at the park sites. (B) One detention pond is located within the Memorial Gardens Park. When the water level in the pond recedes during drought conditions, reuse water is used to supplement the runoff water. (C) The UTPB Park is irrigated with reuse water or raw water when reuse water is unavailable. The Memorial Gardens Park is irrigated with a combination of reuse water and runoff water. (10) Athletic field conservation. All athletic fields operated by the parks department are equipped with automated sprinkler systems. The athletic fields at the UTPB Park are irrigated with reuse water rather than the potable water supply. (11) Metering of all connections. (A) Master meters are currently installed at the WTP and are calibrated monthly. An accuracy of plus or minus 5% is required for these meters. (B) The city has implemented automated meter reading of all customer connections, including city-owned and operated facilities. All new construction is also required to be metered. The type of meter installed will be evaluated to ensure an appropriate meter to satisfy the customer's usage. (12) Meter replacement and maintenance. (A) As part of the city's meter replacement program, the meter installation included the installation of bypasses and test portals which allow testing of the meters. After installation of the large meters, the following test schedule was implemented: (i) 6" and larger meters: Annually. (ii) 3 and 4" meters: Once every 4 years. (iii) 1-1/2 and 2 meters: Once every 6 years. (B) In addition, 3/4 and 1" meters were placed on a replacement schedule of 10 years or 1,200,000 gallons. (C) The above testing and replacement frequencies may be adjusted based on factors such as suspected problems with a meter or meter evaluations which indicate the frequency should be increased or decreased. (D) The city completed the installation of AMI meters in 2016. Improved installation has improved metering accuracy and usage accountability. (13) Wholesale agency assistance program. (A) As provided in the wholesale contract with ECUD, ECUD is required to implement a water conservation program which is as stringent as the one adopted by the city. (B) Under the requirements of the wholesale contract, ECUD is master metered. ECUD installed AMI meters throughout its service area in 2016, improving metering accuracy and accountability. (C) The city will make its public and school education programs available to ECUD's customers. (14) Reuse water program. (A) The city has a very active reuse program. Customers are encouraged to participate in the reuse program by provision of high-quality water sold at a cost which is considerably less than potable water. The customer base includes: (i) Industrial customers: a. Power plant. b. Petrochemical plant.* (ii) Irrigation customers: a. The University of Texas Permian Basin.* b. UTPB Park. c. Memorial Gardens. d. Odessa Country Club.* e. Links Golf Course.* f. Ratliff Golf Course.* g. Texas Department of Transportation Right-of-Way.* *Original customers (B) Since much of the reuse water is provided for irrigation purposes, the amount of water actually used is highly dependent on the season and rainfall. Therefore, effluent available for reuse that goes unused is generally discharged daily. Due to the high quality and lower cost of the reuse water, other potential customers have requested the reuse water. (15) Public information. (A) The city provides an annual mail out to all customers which contains indoor and outdoor water conservation information. In addition, each new water customer is given a water conservation brochure. (B) City staff is available to make water conservation presentations to organizations upon request. (C) The local Master Gardeners, Keep Odessa Beautiful organization, and the Texas Agricultural Extension Agent have also been very helpful in providing information to the city and its customers on outdoor water conservation. The city will continue to work with these groups to improve its public outreach in these areas. (D) The city provides conservation information through its website. The city will work to update the website and its information and to publicize its availability through the government access channel and other means. (16) Leak detection and rehabilitation. (A) Customer leaks. Through its customer billing system, the city monitors water consumption, inspects meters which vary significantly from previously established norms, and assists customers in determining a leak in their system. (B) System leaks. Notifications of leaks are taken 24 hours each day. Each leak is investigated as soon as possible, and repaired if the leak is on the city line. (C) Distribution system rehabilitation program. (i) Due to aging infrastructure within the city's distribution and collection system, the city council has approved approximately 50 million dollars for the rehabilitation of the systems (including large meter change out previously discussed). The city employed an outside consultant to assist in the completion of an infrastructure study which will help determine the priority which should be set in the replacement or rehabilitation of lines. (ii) Through the replacement of the distribution lines, it is anticipated that many currently undetermined leaks will be resolved. In addition, the water flushed through the system to maintain water quality and resolve customer complaints will be reduced.
( Ordinance 2020-34 adopted 9/22/20 ; Ordinance 2024-22 adopted 5/14/2024 )
Ask a question about Odessa law
Corpus searches the Odessa sections it holds and shows the ones that match, with their citations. Free, no sign-in.