Sec. 27-40. - Application.
Any person desiring to construct any trunk pipeline across or along and under any street within the limits of the city shall first submit to the director of public works and to the director of city planning a plan accurately showing the proposed location, course and alignment of the proposed pipeline. Such plan shall be accompanied by a written application for the passage of an ordinance granting the franchise, which application shall show (unless the same are sufficiently shown on the plan) the time, manner, means and methods of the proposed construction, the particular commodity proposed to be transported through such line and the maximum pressure and maximum temperature under which the same may be pumped or otherwise caused or permitted to flow through any and all of the particular portions of the line. Such plan, which shall consist not only of the plan but also of a suitable alignment map as drawn for the applicant for his own records, shall accurately show the location of all existing streets and all proposed streets designated on the master plan for the city or on the official map of the city, across or along and under which the pipeline is intended to be laid. Two (2) copies thereof and of the application shall be presented to the director of city planning and two (2) copies thereof and of the application shall be presented to the director of public works.
(Ord. No. 70-59, § 1, 4-7-70)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.