§ 1.49 — Telephone, radio, cellular, television and/or other telecommunication towers and antennas
Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 1.49
Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/70afc920-7c70-47db-8c6b-d19b67356801
Sec. 1.49. - Telephone, radio, cellular, television and/or other telecommunication towers and antennas.
Effective January 25, 2003, all telephone, radio, cellular, television and/or other telecommunication towers and antennas shall be required to obtain a conditional use permit pursuant to the terms of this section: A. Purpose. The purpose of the ordinance described in this section is to: 1. Allow the compatible and orderly development, within the city, of uses which may be suitable only in certain locations in a zoning district; 2. Establish guidelines for the setting of all telephone, radio, cellular, television and/or other telecommunication towers and antennas; 3, Accommodate the needs of residents and business while protecting the public health, safety, and general welfare of the community; 4. Facilitate the provision of wireless telecommunication services to the residents and businesses of the city; 5. Encourage the location of towers and antennas in nonresidential areas; 6. Minimize the total number of towers and antennas within the community necessary to provide adequate personal wireless services to residents and avoid potential damage to adjacent properties from tower or antenna failure through structural standards and setback requirements; 7. Maximize the use of existing and approved towers and antennas to accommodate new wireless telecommunications in order to reduce the number of towers and antennas needed to serve the community; 8. Minimize adverse visual effects of towers and antennas through careful design and sitting standards; 9. Locate telecommunication towers and antennas in areas where adverse impacts on the community are minimized; 10. Enhance the ability of the providers of telecommunications services to deliver such services to the community effectively and efficiently. B. Definitions. Except as specifically defined herein, all words used in this section shall be defined in The New Illustrated Book of Development Definitions, (1993, Rutgers). Words not defined herein or in the referenced text shall be construed to have the meaning given by common and ordinary use and shall be interpreted within the context of the sentence in which they occur. For the purpose of clarification, certain words or terms used herein shall be defined as follows: Words used in the singular include the plural and words used in the plural include the singular. Words used in the present tense include the future tense. 1. The word "erected" includes the words "constructed", "located", or "relocated". 2. The word "map" or "zoning map" means the zoning map. 3. The word "parcel" includes the word "plot" or "lot". 4. The word "person" includes the words "individuals", "firms", "partnerships", "corporations", "associations", "governmental bodies", and all other legal entities. 5. The word "shall" is always mandatory, never discretionary. 6. The word "used" or "occupied" include the words "intended, arranged, or designated to be used or occupied". 7. Antenna or antenna array. An exterior apparatus made of one or more rods, panels, discs, or similar devices for wireless communication. Used in the transmission or reception of radio frequency signals and/or electromagnetic wares. Antennas may include omni-directional antennas (rod), directional antenna (panel) and parabolic antenna (disc). 8. Attached wireless communication facility. An antenna that is attached to an existing building or structure, which shall include, but not limited to, utility poles, signs, water towers, with any accompanying pole or device which attaches the antenna to the building or structure. 9. Co-location or site sharing. Use of a common tower or site by two or more wireless holders. 10. FAA. Federal Aviation Administration. 11. FCC. Federal Communication Commission. 12. Geographic antenna placement area. The general vicinity within which the placement of an antenna is necessary to meet the engineering requirements of an applicant's network or broadcasting need. 13. Governing authority. City of Pharr Board of Commissioners. 14. Height. When referring to a tower, antenna or structure, shall mean the distance measured from ground level to the highest point of the tower, antenna or structure. 15. Lattice tower. A guyed or self-supporting three or four-sided open steel frame structure used to support telecommunication equipment. 16. Monopole tower. A structure composed of a single spire used to support telecommunication equipment. 17. Temporary wireless communication facility. A wireless communication facility to be placed in use for 120 or fewer days. 18. Tower. A stand alone structure that is designed and constructed for the purpose of supporting one or more antennas, including self-supporting lattice towers, guy towers, or monopole towers. The term includes radio and television transmission towers, microwave towers, common-carrier towers, cellular telecommunication towers, with accessory buildings/structures and other similar structures. 19. Wireless communication. Any personal wireless services as defined in the Telecommunications Act of 1996, which includes FCC licensed commercial wireless telecommunication services including cellular, personal communication services (PCS), specialized mobile radio (SMR), enhanced specialized mobile radio (ESMR), paging, and similar services that currently exist or that may in the future be developed. 20. Wireless communication facility (WCF). Any unstaffed facility for the transmission and/or reception of wireless telecommunication services usually consisting of an antenna, cables, and a support structure to achieve the necessary elevation. 21. Base station. As defined in subsection K.(1.49.1), except for new base stations that are not eligible for Section 6409, need not be existing at the time of the application. 22. Collocation. As defined in subsection K.(1.49.1), below, except for new towers and base station that are not eligible for Section 6409, need not be existing at the time of application. 23. Eligible facilities request. As defined in subsection K.(1.49.1), below. 24. Eligible support structure. As defined in subsection K.(1.49.1), below. 25. Existing. As defined in subsection K.(1.49.1), below. 26. Personal wireless service. As defined in 47 U.S.C. § 332(c)(7). [7] 27. Personal wireless service facilities. As defined in 47 U.S.C. § 332(c)(7). [8] 28. Site. As defined in subsection K.(1.49.1), below. 29. Substantial change. As defined in subsection K.(1.49.1), below. 30. Tower. As defined in subsection K.(1.49.1), below, except for new towers that are not eligible for Section 6409, they need not be existing at the time of the application. 31. Transmission equipment. As defined in subsection K.(1.49.1), below. C. Application of section. 1. Preexisting towers and antennas. Towers and antennas for which a permit has been issued prior to the effective date of this section shall not be required to meet the requirements as specified below. 2. Relationship to other ordinances. This section shall supercede all conflicting requirements of other codes and ordinances regarding the locating and permitting of towers and antennas. 3. [Location map.] The planning department shall create a map indicating preexisting towers and antennas and shall maintain map of new structures as they enter the city. 4. District height limitations. Except as set forth in this section, the requirements of this ordinance shall govern the location of telecommunications towers that exceed, and antennas that are installed at a height in excess of 50 feet. 5. Amateur radio facilities. This section shall not govern any tower or antenna that is 75 feet or less in height and is owned and operated by a federally-licensed amateur radio station operator or is used exclusively for receive-only antenna. 6. Fencing and landscaping. If an additional tower or antenna is co-located upon a preexisting tower or site after the adoption of this section, then fencing and landscaping requirements shall be met as part of the permitting process. Alternative landscaping requirements will be considered only after all design alternatives have been exhausted, evaluated and reasonably rejected by development services director or designee. 7. Notwithstanding the above conditions, to the extent an applicant is fully qualified as an eligible facilities request under Section 6409, in the event of a conflict between the above conditions in this subsection and those criteria and conditions in subsection K., below, and the 2014 Infrastructure Order, then subsection K., below, and the 2014 Infrastructure Order control, subject to the city reservation of rights, as set forth in the preface to subsection K. D. General provisions; co-location. 1. Inventory of existing sites. To facilitate the co-location of towers and/or antennas, each applicant seeking to locate a new tower or antenna, relocate an existing tower or antenna, modify any such existing structures, shall provide to the department of planning and community development an inventory of its existing towers or alternative tower structures. The inventory shall include all such structures that are within the corporate limit of the City of Pharr and its extra-territorial jurisdiction. Inventory shall include specific information about the location. Information may include, but is not limited to: a. Latitude and longitude coordinates. b. Degrees. c. Minutes and seconds. d. Height. e. Design. f. Tower type. g. General suitability for co-location. h. Any other information that may be requested by the department. 2. Design requirements. In addition to all applicable building and safety codes, all towers, except amateur radio towers, shall be designed to accommodate the co-location of cellular telecommunication antennas according to the following: a. Towers up to 100 feet in height, the structure and fenced compound shall be designed to accommodate at least two providers. b. Towers greater than 100 feet in height, the structure and fenced compound shall be designed to accommodate at least three providers. c. Towers greater than 125 feet in height, the structure and fenced compound shall be designed to accommodate at least four providers. d. Towers of more than 50 feet in height shall be designed and engineered to withstand a 110 mph maximum gust wind. Such wind load capacity may be changed at the discretion of the building official. 3. Availability of suitable existing structures. No new structures, except amateur radio towers, shall be permitted unless the applicant demonstrates that no existing tower or tower structure can accommodate the applicants proposal. Evidence submitted to demonstrate that no existing tower or tower structure can accommodate the proposed antenna shall consist of one or more of the following: a. No suitable tower or tower structures are located within the geographic antenna placement area required to meet the applicant's networking requirements. b. The applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing towers or structures, or the antenna on the existing tower or structure would cause interference with the applicant's proposed antenna. c. The cost or contractual provisions required by the tower or structure owner to share or adapt an existing tower or structure are unreasonable. d. The applicant adequately demonstrates that there are other limiting factors that render existing towers or structures unsuitable. E. Aesthetics, landscaping and materials. 1. All towers and antennas shall maintain a galvanized finish or concrete finish. They may also be subject to any applicable standards of the FAA, and be painted in the neutral color so as to reduce visual obtrusiveness. 2. All tower sites shall be surrounded by a chain-link fence with some privacy covering six feet in height from finish grade. Access to the site shall be through a locked gate. Barbed wire may be allowed along the top of the fence if it is necessary to prevent unauthorized access to the site. 3. The fence shall be landscaped along the perimeter by drought tolerant plants or shrubbery or plants native to South Texas. 4. Towers shall not be artificially lighted, unless required by the FAA or other applicable authority. 5. Existing mature tree growth and natural land forms on the site shall be preserved to the maximum extent possible. Where natural vegetation around the perimeter of the side would provide an adequate visual screen, an undisturbed buffer may be utilized. F. Permitted use. Constructing a new tower or antenna or the relocation of an existing tower or antenna may be allowed in any zoning district provided that all structures meet the setbacks, screening and buffer requirements contained herein: 1. Residential Districts (R1), (R1A), (RTH), (R2), (R3), (R4), (RMH), (RHCMH). a. Only towers of monopole construction will be allowed in any residential district. b. Monopole towers shall have a front setback of 25 feet or one-third the street right-of-way width on which the property fronts, whichever is greater. c. Monopole towers shall have a rear setback of 15 feet. d. Monopole towers shall have a side setback of ten feet or 15 feet abutting a street. e. Towers and antennas shall be a minimum of 200 feet from any residential structure. Distances shall be measured along a single-straight line between the center of the tower base and the nearest point on any property line. f. Towers 100 feet or over in height shall not be located closer than 1,000 feet from any existing tower that is 100 feet or over in height. Distances shall be measured along a single straight-line between the center of the two tower bases. g. The tower shall be erected and operated in compliance with current Federal Communications Commission and other applicable federal, state and county standards. 2. Commercial, Agricultural and Industrial Districts (OP), (NC), (C2), (C), (HC), (LI), and (AO). a. Towers and antennas aforementioned in this ordinance shall be allowed in any commercial, agricultural or industrial district. b. Towers and tower structures shall not exceed: (1) 100 feet, if the tower is at least 200 feet from any residential district. (2) 125 feet, if the tower is at least 250 feet from any residential district. (3) 150 feet or more if the tower is (double the height of tower) from any residential district. c. The antenna shall not exceed the tower height by more than 20 feet. d. All guys and guy anchors are set back a minimum of 25 feet from any property line. e. All towers shall have a front setback of 25 feet or one-third the street right-of-way width on which the street right-of-way width on which the property fronts, whichever is greater. f. All towers shall have a rear setback of 15 feet. g. All towers shall have a side setback of ten feet or 15 feet abutting the street. h. Towers 100 feet or over in height shall not be located closer than 1,000 feet from any existing tower that is 100 feet or over in height. Distance shall be measured along a single straight line between the center of two tower bases. i. If the tower erected is to be used by a public agency for police, fire, EMS, 911, or other similar public emergency communications for the city, then the requirements of subection F.(1)a. shall be waived. j. The tower is erected and operated in compliance with current Federal Communications Commission or other applicable federal, state, and county standards. G. Approval procedures. See Article III, sections 1.40 through 1.47. H. Removal of abandoned tower and antenna. Any tower or antenna that is not operated for a continuous period of 12 months shall be considered abandoned, and the owners of such antenna or tower shall remove the structure within 90 days of receipt of notice from the city notifying the owner of such abandonment. If said tower or antenna is not removed within the 90 days grace period, the head building official may, in the manner provided in the Code of Ordinance of the City of Pharr, remove such tower or antenna at the owner's expense. I. Nonconforming towers and antennas. Towers and antennas in existence prior to the date of adoption of this section [January 7, 2003] which do not comply with the requirements aforementioned are subject to the following provisions: 1. Nonconforming towers and antennas may continue in use for the purpose currently used, but may not be expanded without complying with the provisions of this section. 2. Nonconforming towers and antennas which are damaged less than 50 percent, due to any reason or cause, may be repaired and restored to their former use, location and physical dimensions. J. Penalty. Anyone who violates this section shall upon conviction thereof be fined not to exceed $200.00 each day that the violation continues to exist in a separate offense. K. Eligible facilities request. (1.49.1) Definitions. These definitions and related Section 6409 procedures only apply to the city to the extent the FCC's Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies, Report and Order, 29 FCC Rcd 12865 (2014), ("2014 Infrastructure Order") preempts existing city procedures and to the extent the 2014 Infrastructure Order is effective as federal law. The city expressly reserves its rights to revise or repeal any or all of these definitions and related Section 6409 procedures to the extent the 2014 Infrastructure Order is interpreted, modified, revised or enjoined on any appeal or reconsideration in a manner inconsistent with the definitions in or procedure in this section. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Approval authority shall mean the public official, or designee, authorized to administratively issue project permit approvals. Applicant shall mean and refer to the person and such person's successor in interest owning and/or operating the transmission equipment proposed in an eligible facilities modification application to be collocated, removed or replaced. Authorized person shall mean the person, employees, agents, consultants, and contractors, authorized in writing by applicant to complete and submit an eligible facilities modification application on behalf of applicant and who is authorized to receive any notices on behalf of applicant of any action taken by the city regarding the application. Base station shall mean and refer to the structure or equipment at a fixed location that enables FCC-licensed or authorized wireless communications between user equipment and a communications network. The term does not encompass a tower as defined herein or any equipment associated with a tower. Base station includes, without limitation: a. Equipment associated with wireless communications services such as private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. b. Radio transceivers, antennas, coaxial or fiber-optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration (including distributed antenna systems (DAS) and small-cell networks). c. Any structure other than a tower that, at the time the relevant application is filed with the city, supports or houses equipment described in paragraphs a.—c., that has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, even if the structure was not built for the sole or primary purpose of providing that support. d. The term does not include any structure that, at the time the relevant application is filed with the city, does not support or house equipment described in paragraphs a.—b. of this section. City shall mean and refer to the City of Pharr. City Code shall mean and refer to the City Code of Ordinances. Collocation shall mean and refer to the mounting or installation of transmission equipment on an eligible support structure for the purpose of transmitting and/or receiving radio frequency signals for communications purposes. Deemed approved shall mean and refer to an eligible facilities modification application that has been deemed approved upon the city's failure to act, and has become effective, as provided pursuant the FCC Eligible Facilities Request Rules. Eligible facilities request application or application shall mean and refer to, unless the context clearly requires otherwise, a written document submitted to the city pursuant to this chapter for review and approval of a proposed facilities modification. Eligible facilities request shall mean any request for modification of an existing tower or base station that does not substantially change the physical dimensions of such tower or base station, involving: a. Collocation of new transmission equipment; b. Removal of transmission equipment; or c. Replacement of transmission equipment. Eligible support structure shall mean and refer to any existing tower or base station, as defined in this chapter subsection, provided that it is in existence at the time the eligible facilities request application is filed with the city under this section. Existing shall mean and refer to, for purposes of this chapter and as applied to a tower or base station, a constructed tower or base station that has been reviewed and approved under the applicable zoning or siting process, or under another state or local regulatory review process, provided that a tower that has not been reviewed and reviewed because it was not in a zoned area when it was built, but was lawfully constructed, is existing for purposes of this definition. Section 6409(a) means Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012, Public Law 112-96; 126 Stat 156, codified as 47 U.S.C. § 1455(a). Site for towers other than towers in the public rights-of-way, the current boundaries of the leased or owned property surrounding the tower and any access or utility easements currently related to the site, and, for other eligible support structures, further restricted to that area in proximity to the structure and to other transmission equipment already deployed on the ground. Substantial change a modification substantially changes the physical dimensions of an eligible support structure if it meets any of the following criteria: a. For towers other than towers in the public rights-of-way, it increases the height of the tower by more than ten percent or by the height of one additional antenna array with separation from the nearest existing antenna not to exceed 20 feet, whichever is greater; for other eligible support structures, it increases the height of the structure by more than ten percent or more than ten feet, whichever is greater; [9] b. For towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body of the tower that would protrude from the edge of the tower more than 20 feet, or more than the width of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support structures, it involves adding an appurtenance to the body of the structure that would protrude from the edge of the structure by more than six feet; c. For any eligible support structure, it involves installation of more than the standard number of new equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public rights-of-way and base stations, it involves installation of any new equipment cabinets on the ground if there are no pre-existing ground cabinets associated with the structure, or else involves installation of ground cabinets that are more than ten percent larger in height or overall volume than any other ground cabinets associated with the structure; d. It entails any excavation or deployment outside the current site; e. It would defeat the concealment elements of the eligible support structure; or f. It does not comply with conditions associated with the siting approval of the construction or modification of the eligible support structure or base station equipment, provided however that this limitation does not apply to any modification that is noncompliant only in a manner that would not exceed the thresholds identified in subsections a.—f., above. [10] Support structure(s) shall mean a structure designed to support telecommunications facilities including but not limited to, monopoles, towers, and other freestanding self-supporting structures. Telecommunication facility shall mean any unmanned facility established for the purpose of providing wireless transmission of voice, data, images or other information including but not limited to, cellular telephone service, personal communications service (PCS), and paging service. A telecommunication facility can consist of one or more antennas and accessory equipment or one base station. Tower shall mean any structure built for the sole or primary purpose of supporting any FCC-licensed or authorized antennas and their associated facilities, including structures that are constructed for wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul, and the associated site. Transmission equipment shall mean equipment that facilitates transmission for any FCC-licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-optic cable, and regular and backup power supply. The term includes equipment associated with wireless communications services including, but not limited to, private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul. (1.49.2) Purpose and intent. The purpose and intent of this amendment is to implement Section 6409 of the "Middle Class Tax Relief and Job Creation Act of 2012" (the "Spectrum Act") as interpreted by the Federal Communications Commission's ("FCC" or "Commission") Acceleration of Broadband Deployment Report and Order, which requires state or local government to approve any eligible facilities request for a modification of an existing tower or base station that does not result in a substantial change to the physical dimensions of such tower or base station. (1.49.3) Applicability. This chapter applies to all collocations or modifications to an existing wireless tower or base station submitted with a written request for approval pursuant to Section 6409(a). (1.49.4) Eligible facilities request (Section 6409) application review. (1) Application. The city shall prepare and make publicly available an application form which shall be limited to the information necessary for the city to consider whether an application is a qualified eligible facilities request. The application may not require the applicant to demonstrate a need or business case for the proposed modification. (2) Type of review. Upon receipt of self-described application for an eligible facilities request, the department of development services shall review such application to determine whether the application qualifies as a Section 6409 eligible facility request. If the request is deemed as an eligible facility request, collocations and minor modifications shall be permitted after administrative review and administrative approval, in accordance with the standards set forth in this ordinance. (3) Timeframe for review. Within 60 days of the date on which an applicant submits an application seeking approval, the city shall approve the application unless it determines that the application is not a qualified Section 6409 eligible facilities request. (4) Tolling of the timeframe for review. The 60-day review period begins to run when the application is filed, and may be tolled only by mutual agreement by the city and the applicant, or in cases where the city determines that the application is incomplete. The timeframe for review is not tolled by a moratorium on the review of applications. a. To toll the timeframe for incompleteness, the city must provide written notice to the applicant within 30 days of receipt of the application, specifically delineating all missing documents or information required in the application. b. The timeframe for review begins running again when the applicant makes a supplemental submission in response to the city's notice of incompleteness. c. Following a supplemental submission, the city will notify the applicant within ten days that the supplemental submission did not provide the information identified in the original notice delineating issuing information. The timeframe is tolled in the case of second or subsequent notices pursuant to the procedures identified in subsection (4)b. of this section. Second or subsequent notices of incompleteness may not specify missing documents or information that were not delineated in the original notice of incompleteness. (5) Failure to act. In the event the city fails to approve or deny a request seeking approval of an eligible facilities request within the timeframe for review (accounting for any tolling), the request shall be deemed granted. The deemed grant does not become effective until the applicant notifies the city in writing after the review period has expired (accounting for any tolling) that the application has been deemed granted. [11] (6) Remedies. Applicants and the city may bring claims related to Section 6409(a) to any court of competent jurisdiction. (7) Interaction with Section 332(c)(7). [12] (1.49.5) Application for a personal wireless service facility. The applicant for a personal wireless service facilities site shall complete the application, and any addendum to the application, provided by the city development services department. The application must be completed for all personal wireless facilities sites, both for those sites which require a conditional use permit and for those sites meeting the then current zoning criteria. The application may be revised from time to time, as reasonably determined by the city development services department to be consistent with state and federal law. [13] (1.49.6) Telephone, radio, cellular, television and/or other telecommunication towers and antennas permitted by conditional use permit. Any telecommunications facility or support structures not meeting the requirements of subsection 1.49 K. shall be required to meet the conditions as set forth in section 1.49.
(Ord. No. O-2003-04, §§ 1—10, 13, 1-7-03; Ord. No. 2017-18, §§ 1—3, 5-15-17)
Ask a question about Pharr law
Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.
