For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 106-90 — Inspections

Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 106-90

Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/a65ca160-414d-422f-9e06-e9026a9ba903

Sec. 106-90. - Inspections.

To assure compliance with this article, the city manager or duly authorized representative shall have the right to enter any premises for inspection purposes during reasonable hours and after reasonable notice has been given at intervals as required. Also, the city manager, upon notification of the permit holder or his agent, shall make or cause to be made any necessary inspections and shall either approve that portion of the construction as completed or the placement of the sign or shall notify the permit holder or the agent wherein the sign fails to comply with this article. (1) Foundation inspection. A foundation inspection is required of all permanent outdoor advertising displays constructed of block or brick or for which footings are required. Such inspections shall be made after trenches are excavated and any reinforcing steel is in place and prior to the placing of concrete. (2) Setbacks inspection. A setback inspection is required of all signs, permanent and temporary. Setbacks shall be inspected at the time the foundation inspection is made for permanent signs and prior to the placing of concrete and after placement for temporary signs. (3) Electrical inspection. An electrical inspection is required of all illuminated signs. All electrical work shall be done by a master, licensed electrician. It shall be the responsibility of the electrician to call for the required inspection. Work shall not be done on any part of the sign installation beyond the point indicated in each successive inspection without first obtaining the approval of the city manager or duly authorized representative. Such approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated under subsection (1) to (3) of this section.

(Ord. No. 2021-03, 1-4-21)

Ask a question about Pharr law

Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.