Sec. 118-48. - Water, sewer, drainage facilities, and fire hydrants.

(a) Generally. (1) The subdivider shall dedicate, at his own cost, such rights-of-way and construct such water mains, water lines, fire hydrants, sanitary sewers, storm sewers and drainage ditches of such a size as to adequately serve the area being subdivided, as determined by the director of planning. All facilities shall be constructed in accordance with city standards. (2) In all subdivision developments, dwelling units (single-family, duplexes, townhouses, multifamily, apartments, condominiums and cluster developments) shall be connected to sanitary sewer mains by approved sewer lines, except where septic tanks are approved by the planning and zoning commission. (3) If the city should require the dedication of additional right-of-way or the construction of storm sewers, drainage ditches, sanitary sewers or water mains of a size greater than required for the subdivision alone, the city shall, within one year after date of approval of the final construction plans, provided construction has been completed within such one-year period and in accordance with approved construction plans, reimburse the subdivider for any increased cost of such facilities upon acceptance of such facilities by the city. (4) The subdivider shall provide, prior to the beginning of any such subdivision improvements, a guarantee of performance in accordance with section 118-207. Upon the completion of the system and acceptance by the city, the installation shall become the property of the city to operate and maintain. (b) Responsibility for installation. (1) Contributions to construction of water lines. The subdivider's contribution to the cost of water service to the subdivision shall be an amount equal to the installed cost, including all labor, ditching, engineering and material, including pipes, fire hydrants, valves, fittings and other appurtenances necessary to furnish water service to the subdivision. The city has adopted water tapping fees, and these shall be paid according to such fee schedule prior to installation of water lines (see section 118-49). If any part of the water line is required to be larger than that necessary to serve the subdivision, in order to provide the service elsewhere in the city water system, the city shall pay for the pipe in excess of the size required of the developer, as soon as funds can be made available. For purposes of this section, water lines eight inches or less in diameter are considered to be necessary for any subdivision development; therefore, the city will not participate in the cost of providing lines equal to or less than eight inches in diameter. Where a developer is required to extend a water line to reach his subdivision, and such extension is 300 feet or longer, the developer may obtain reimbursement from other landowners who tie onto such line, if by resolution the city commission shall deem it just and fair that such reimbursement should be forthcoming. Such reimbursement shall apply only to the cost of constructing off-site lines and shall recognize that the subdivider may not recover his own share of such expenses from third parties. Further, this provision shall not apply to a looped line where the developer is required to loop water lines as a requirement for approval of a developer's subdivision. In addition to the amount of reimbursement to be charged to the party requesting to tie on to the water line, the city shall recover a fee of $25.00 from each such party requesting to tie on, such fee to cover the costs to the city of administering such reimbursement program. (2) Contribution to construction of wastewater lines. The subdivider's contribution to the cost of wastewater service to the subdivision shall be equal to the installed cost, including all labor, ditching, engineering and material, including pipe, lift stations, manholes and appurtenances necessary to furnish wastewater service to the subdivision. The city has adopted wastewater tapping fees, and these shall be paid according to such fee schedule prior to installation of wastewater lines (see section 118-49). If any part of the wastewater line is required to be larger than that necessary to serve the subdivision, in order to provide the service necessary elsewhere in the city wastewater system, the city shall, provided funds are available, pay for the pipe in excess of the size required of the developer. For purposes of this section, wastewater lines of eight inches or less in diameter are considered to be necessary to serve any subdivision development; therefore, the city will not participate in the cost of providing lines equal to or less than eight inches in diameter. (3) Installation of drainage system. The subdivider shall be responsible for providing an adequate drainage system, consisting of pipes, swales, natural features and manmade improvements that effectively carry runoff created by the development of the site. (4) Bridges and/or large drainage structures. Provided that funds are available, the city may participate in the extra cost of bridges and/or large drainage structures on principal streets shown on the major thoroughfare plan. (c) Extension of city facilities. To properly serve a subdivision, it may be necessary to extend existing city utilities and/or drainage facilities. When these extensions of facilities are constructed outside the proposed subdivision, they are referred to in this subsection as off-site improvements. The subdivider shall install at his own expense off-site improvements of such size to adequately serve the area being subdivided. However, the city may require the construction of off-site improvements of a size greater than set out in this subsection; and the city may within one year after the date of approval of the final construction plans, provided construction has been completed within such one-year period and in accordance with approved construction plans, shall, upon approval, reimburse the subdivider for any increased cost of such facilities. (d) Bid tabulation sheet and construction contract requirements. Before any subdivider shall be entitled to reimbursement of any funds under this section, he shall furnish the city with a signed copy of the bid tabulation sheet which has been accepted by him for construction of the improvements for which the reimbursement is to be made, as well as a copy of the construction contract between such subdivider and the contractor.

(Code 1976, § 30-63)