§ 126-377 — Traffic calming system; committee; system requirements
Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 126-377
Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/e644b99b-ed15-4422-ace4-9304a9b6d426
Sec. 126-377. - Traffic calming system; committee; system requirements.
(a) [Traffic calming system.] The adoption of the traffic calming program is a joint city and community program that allows for the evaluation and implementation of a program in areas within the community that qualify for the installation and maintenance of devices that are intended to provide calm and safe passage on public roadways. (b) Traffic safety committee. All evaluations, reports, and necessary information and materials, are the subject of review and approval of the following city personnel: (1) Director of public works or designee; (2) City manager or designee; (3) Police chief or designee; and (4) Director of planning and zoning or designee; (5) City engineer or designee. (c) Program requirements; requests; ranking system; funding. (1) The traffic safety committee will consider the following point system during consideration of any requests: Ranking System Points | Basis for Point Assignment 0—30 | 85 th percentile speed exceed posted speed limit; 2 points assigned for every 1 mph 0—25 | Average daily volume (1 point assigned for every 120 vehicles) 0—10 | 1 point for every crash reported within past three years 0—10 | 5 points assigned for each school crossing on the project street Middle School 0—15 | 5 points assigned for each public facility (parks, community centers, high school, commercial site) Generators 0—10 | 5 points assigned if there is no continuous sidewalk on one side, 10 points assigned if there is no continuous sidewalk on both sides _____ 100 (2) Any group of persons, as required herein, interested in obtaining consideration of speed cushion study be performed for a proposed street should download required forms and mail it back to the city or call 956-787-9772 to have the city mail a form. The form will indicated some of the details of a request and a preliminary show of support from your neighbors. Once the form has been completed and returned to the city, the committee will analyze the street to determine its eligibility status. If it is eligible, it will be considered, along with many others, for funding. A request for speed cushions begins by completing a "Request for Speed Cushion Investigation" form. The form is available by calling 956-787-9772 or can be downloaded from the city's website at www.pharr-tx.gov. (3) Requests can be made by either a neighborhood or a group of residents located on the street requesting speed cushions. A designated contact person will receive all correspondence and be responsible for gathering evidence of support. Only request forms supplied by the department of public works or exact copies may be used for this purpose. Request forms should be submitted to the traffic operations division at the following address: Public Works Department Traffic Operations Division Attn: Speed Cushion Processing Request P.O. Box 1729 Pharr, TX 78577 (4) The request must be for a specific street segment and should include, at a minimum the following information: a. The requested street name. b. The boundary of the street segment (example: between Bus 83 and Bell Ave). c. Name of contact person. d. Address of contact person. e. Daytime phone number of contact person. f. Evidence of neighborhood support (ten individual signatures representing ten different residents whose property abuts the street segment in question). g. Signature of contact person. (5) In order for a request to qualify for consideration, a street must meet criteria set by the department of public works under subsection (c)(1). It is the responsibility of the department of public works to conduct an evaluation to determine if the street segment meets the following minimum criterions: a. The street segment must be primarily a residential street which provides direct access to residential properties, or as determined by public works director. b. The street segment must have no more than one moving lane of traffic in each direction of travel. c. The street segment may not be designated as an arterial street on the Major Thoroughfare Plan. d. The street shall have a speed limit of 30 mph with a length of 660 feet minimum. e. The street segment must not be so close to a critical facility such as fire department, police department, ambulance or emergency response building as to significantly interfere with emergency vehicle operations. f. The street segment must be long enough to comply with the minimum placement procedures described in Step Five. The measured length shall be continuous with a minimum of 660 feet without interruption by a regulatory traffic control device. (6) Funding. Only those requests meeting all the eligibility requirements will proceed to Step Three "Funding". If a request is denied, applicants will not be able to reapply to the speed cushion program for the following five years unless there is considerable change in conditions. a. An eligible project may be expedited if the applicants choose to pay for 100 percent of the estimated cost of the installation. Expedited projects will be constructed following deposit of funding. (7) Support level. If the traffic safety committee determines the street to be eligible and funding has been identified according to Step Two "Eligibility", and funding identified per Step Three "Funding"; the requestor will be required to canvass the owners for approval. Only canvassing forms supplied by the department of public works will be used for this purpose and each form must be notarized before it is turned in. A street must show 67 percent approval prior to installation. (8) System location. It is the responsibility of the traffic safety committee to determine the final location of all speed cushions in accordance with the following safe engineering principles. The department of public works shall prepare and maintain current design standards for speed cushions in accordance with this installation procedure. a. Speed cushions will usually be placed an average of 300 feet apart. b. A speed cushion will not be located in front of a driveway or within an intersection. c. Speed cushions will not be located within 250 feet of a regulatory traffic control device or within 50 feet of an intersection. d. A speed cushion will not be located adjacent to a property if the occupant objects to its placement unless deemed necessary by director of public works. e. Speed cushions should not be placed within six feet of a driveway. f. Speed cushions will typically be placed at property lines. g. Speed cushions will not be placed within a curved section of roadway. (9) System removal. The process for speed cushion removal or alteration by residents is the same as the process for installation. Funding will be required before a speed cushion is removed or relocated. The cost to remove or relocate the speed cushions will include the cost to repair the pavement by milling and overlaying the section of roadway.
(Ord. No. O-2011-08, § 3, 3-15-11)
Ask a question about Pharr law
Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.
