For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-92 — Definitions

Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 14-92

Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/cf4497a2-4221-4c1d-9316-33400a010b84

Sec. 14-92. - Definitions.

The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Below ground installations means activity that causes excess sediment laden water, concrete sawing wash water, wash water or drilling mud pumped from an excavation or structure and shall be treated as sediment laden runoff for erosion control purposes. Building official means the building official for the City of Plano or his designee. Construction activities means construction activities that require a building permit. Director of development services means the director of development services for the City of Plano or his designee. Erosion control plan means a site plan with necessary details, showing the property where land disturbing activity will take place and showing the locations and types of devices, procedures and practices to be used to control erosion and sedimentation. Final approval means completion of a project, site or building in accordance with City of Plano requirements and ordinances. In the case of a building, a certificate of occupancy is issued. Land disturbing activity means any activity, including but not limited to excavation, planting, tilling, and grading, which disturbs five thousand (5,000) or more square feet of the natural or improved vegetative ground cover so as to expose soil to the erosive forces of rain, storm water runoff or wind. All installations and maintenance of franchise utilities such as telephone, gas, electric, etc., shall be considered land disturbing activities. Manual means the City of Plano Erosion and Sediment Control Manual, as amended from time to time. A current copy of the manual shall be kept on file in the office of development services. Off-site borrow area means a source of earth fill material used in the construction of embankments or other earth fill structures, that is located on another parcel of property other than where the principal construction is occurring. Off-site sedimentation means deposit of soil material beyond the limits of the property undergoing land disturbing activity or in city streets, alleys or drainage facilities in an amount sufficient to constitute a threat to public safety and comfort. Off-site spoil area means an area on another parcel of property, other than where the principal construction is occurring, where excess earth, rock or construction material is disposed of. Permanent erosion control devices means devices or practices installed prior to final approval and maintained after final approval to prevent or minimize the erosion and deposit of soil materials. Such devices may include, but shall not be limited to, permanent seeding, sod, storm drain channels, channel linings, storm drain pipes, outlet velocity control structures and stormwater detention structures. Permanent ground cover means permanent vegetative cover on all bare soil areas of a property not covered by a permanent structure or landscaping improvements, including but not limited to, live sod, perennial grasses or other materials which lessen runoff and soil erosion on the property. Phased occupancy means use or inhabitation of a single structure or other portion of a project as such structure or portion thereof is completed, but before the project as a whole is fully completed and finally approved by the city. Related land area includes the property where the principal land disturbing activity is taking place, all adjacent property, off-site borrow areas, off-site spoil areas, off-site properties necessary for required utility extensions, and off-site areas for required street improvements. Responsible party means a business entity, franchised utility company, developer, property owner, contractor or holder of a building permit who is required to comply with the terms of this article. Staging area means an on-site or off-site location used by a contractor to store materials for a project, to assemble portions of equipment or structures, to store equipment or machinery, to park vehicles, or for other construction related uses. Stop work order means the suspension of all city permits with no approvals or inspections of work for the site or project being performed. Temporary erosion control devices means devices installed or practices implemented and maintained during land disturbing activities to prevent, minimize or control the erosion and deposit of soil materials.

(Ord. No. 98-3-9, § II, 3-16-98)

Ask a question about Plano law

Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.