For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-26.1 — Driveway approaches

Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 19-26.1

Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/b0f65aa8-0e16-41ec-a120-572fff321e6e

Sec. 19-26.1. - Driveway approaches.

A driveway approach shall be defined as the paved portion of a driveway intended for vehicular traffic and running from the street curb line or edge of paving to the property line. (1) A driveway approach connecting to a street shall conform to the following standards: a. General requirements. Driveway approaches shall be constructed of reinforced concrete and shall be a minimum of six (6) inches thick. No part of the driveway approach shall cross over the projection, to the street, of the adjacent property line. b. Concrete specifications. Concrete for driveway approaches shall have a minimum compressive strength of three thousand (3,000) psi in twenty-eight (28) days. The quantity of mixing water shall not exceed six and one-half (6½) gallons per sack (ninety-four (94) lbs.) of Portland cement. The slump of the concrete shall not exceed four (4) inches. A minimum content of five (5.0) sacks of cement per cubic yard of concrete is required. c. Reinforcing steel. Reinforcing steel shall be No. 3 (⅜-inch nominal diameter) deformed bars, shall be placed on twenty-four-inch centers each way in the approach, and shall be lapped/spliced a minimum of twelve (12) inches. Reinforcing shall be properly supported to assure it will remain at mid-depth of the slab after placing of the concrete. d. Removing existing pavement. All existing concrete pavement shall be removed by first sawing a groove at least one (1) inch in depth along the proposed break line. Said break line shall lie eighteen (18) inches into the street from the existing back of curb and shall run between the points of curb return for the approach. After the initial saw cut has been made, the pavement and curb may be removed by use of pneumatic equipment. Care shall be exercised to expose the existing reinforcing steel for lap splicing to driveway reinforcing. e. Optional method of removing existing pavement. An optional method of removing is to saw the full depth of the concrete and construct a longitudinal butt joint in accordance with Exhibit "B." f. Construction methods. The subgrade shall be excavated and shaped to line grade in cross section and, if considered necessary by the city's inspector, tamped and sprinkled. The subgrade shall be moist at the time the concrete is placed. Forms shall be of wood or metal, straight, free from warp and of a depth equal to the thickness of the finished work. They shall be securely staked to line and grade and maintained in a true position during the depositing of concrete. The reinforcing steel shall be placed in position, and care shall be exercised to keep all steel in its proper location. g. Connection to asphalt pavement. When connecting a driveway approach to asphalt street paving, the concrete shall be separated from the edge of the existing pavement by an eighteen-inch strip of hot mixed asphaltic concrete at least six (6) inches in depth. All other applicable requirements listed above concerning concrete and reinforcing steel shall remain in effect. h. Texas Highway Department permit. All driveway approaches connecting to existing roads which are a part of the state highway system will require a permit from that organization in addition to those required by this article. Such permit shall be applied for through the city engineering department. (2) A driveway approach connecting to an alley shall conform to the following standards: a. General requirements. Driveway approaches shall be constructed of reinforced concrete and shall be a minimum of six (6) inches thick. No part of the driveway approach shall cross over the projection, to the alley, of the adjacent property line (see Exhibit "C"). b. Concrete specifications. Concrete for driveway approaches shall have a minimum compressive strength of three thousand (3,000) psi in twenty-eight (28) days. The quantity of mixing water shall not exceed six and one-half (6½) gallons per sack (ninety-four (94) lbs.) of Portland cement. The slump of the concrete shall not exceed four (4) inches. A minimum content of five (5.0) sacks of cement per cubic yard of concrete is required. c. Reinforcing steel. Reinforcing steel shall be No. 3 (⅜-inch nominal diameter) deformed bars, shall be placed on twenty-four-inch centers each way in the approach, and shall be lapped/spliced a minimum of twelve (12) inches. Reinforcing shall be properly supported to assure it will remain at mid-depth of the slab after placing of the concrete. d. Construction methods. The subgrade shall be excavated and shaped to line grade in cross section and, if considered necessary by the city's inspector, tamped and sprinkled. The subgrade shall be moist at the time the concrete is placed. Forms shall be of wood or metal, straight, free from warp and of a depth equal to the thickness of the finished work. They shall be securely staked to line and grade and maintained in a true position during the depositing of concrete. The reinforcing steel shall be placed in position, and care shall be exercised to keep all steel in its proper location.

(Ord. No. 90-8-6, § III, 8-13-90)

Ask a question about Plano law

Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.