§ 21-180 — Participation and reimbursement by city in the cost of oversize water and wastewater mains
Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 21-180
Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/87c5860a-294f-4c9b-88ef-64810e18dafa
Sec. 21-180. - Participation and reimbursement by city in the cost of oversize water and wastewater mains.
(a) City participation policy. The city may participate in the reasonable construction costs of oversizing water or wastewater mains and appurtenances thereto that exceed the size of a standard water or wastewater main (twelve (12) inches in diameter). The developer initially shall be responsible for the entire cost of the oversize main. City oversize participation shall be in accordance with the subdivision regulations. (b) No funds available. In no event may the city be required to participate in the costs of oversize mains pursuant to this section if there are no funds available for such purposes. (c) Participation and reimbursement requests. A request for city participation authorized by subsections (a) and (b) hereof shall be initiated through the submission of an application for participation by the developer in accordance with section 16-160.12 of the subdivision regulations. The application shall be accompanied by as-built drawings showing the reimbursable items, a copy of the contractor's bid for construction, final payments with quantities, oversize calculations for all reimbursable items and a project location map. (d) City reimbursement. If the request for city participation is approved by the city, following dedication and acceptance of a facility or appurtenances in which it has agreed to participate, the city shall refund the costs of oversizing such facility in accordance with the following procedures and standards: (1) Oversizing standards. The following standards apply to the determination of the costs of oversizing water and/or wastewater mains: a. The size of a standard water main shall be twelve (12) inches. b. The size of a standard wastewater main shall be twelve (12) inches. c. Where the size of the water or wastewater main needed exceeds that of a standard facility, the size of the main to be installed shall be determined by the city engineer, whose decision shall be final. d. The city shall pay only the difference in cost between the standard sized main with appurtenances and the oversize main with appurtenances as required by the city engineer. (2) Oversize cost determination. The extent of the city's participation in the costs of oversize mains shall be determined by comparing costs computed by the following two (2) methods: a. Method 1. The developer shall take bids on installation of a system using the standard size main and the larger size that will actually be installed. Copies of the bids, tabulations and figures shall be submitted to the city engineer. Calculations shall delineate the total cost for installation of the oversize mains with appurtenances, along with the cost for installing standard size mains with appurtenances, with the differences noted as participation by the city. b. Method 2. The city engineer shall establish a table of water and wastewater facility costs ("table"), which shall be updated on a regular basis by the city engineer, and in no case shall more than twelve (12) months lapse between updates. The table shall establish base unit costs used to determine the maximum difference in cost between the standard size main and the cost of oversize mains likely to be installed, using average costs of all water and wastewater mains installed in the city during the previous twelve (12) months. The then-current table shall be incorporated into this section as if fully set forth herein and shall be used to determine the city's participation. c. City engineer's option. The city engineer shall have the option to use the method in subsection b. whenever he considers the results of the method in subsection a. to be unreasonable or whenever the developer fails to submit the proper information as required. d. Engineering costs. The city shall pay a maximum of six (6) percent of the city's cost for engineering fees, which includes surveying, construction staking and supervision. e. Street rights-of-way. A development shall be responsible for the full cost of utilities which cross street rights-of-way up to a maximum width of one hundred sixty (160) feet. A development on one (1) side of the street shall be responsible for the cost of utilities up to eighty (80) feet in length. If the required street right-of-way exceeds one hundred sixty (160) feet, the city will assume the cost of the excess length of the utility line as oversize participation.
(Ord. No. 90-8-9, § I, 8-13-90)