Sec. 21-184. - Procedure for establishing pro rata fees.
(a) Request for pro rata fees. Prior to final acceptance of the improvements, the developer shall submit a written request to the city engineer stating whether a pro rata fee will or will not be established for the main that the developer installed. (b) Submittal requirements. The request to establish a pro rata fee shall be on a form provided by the city. The request shall include a copy of the actual contract with unit prices. The request must identify the cost of the main, including fire hydrants, valves, fittings, manholes and other appurtenances which were determined necessary for the construction of the line. (c) Verification of costs by engineer. The city engineer shall verify the developer's calculations for the reimbursement. In the event of a discrepancy, the city engineer shall establish the cost per foot for the pro rata fee. (d) Reimbursement amount. The maximum amount for which a developer may be reimbursed from the proceeds of pro rata fees for the main installed shall not exceed the costs determined by the city engineer under subsection (c), plus engineering fees, calculated at the rate of six (6) percent of the verified construction cost. (e) Pro rata for lift station. In the event that a lift station which exceeds the area necessary to serve a development is required pursuant to section 21-178, the developer must submit a written request for establishment of a pro rata fee for the lift station, which shall be on a cost-per-acre basis. The costs eligible for reimbursement shall include the lift station, force main and other appurtenances and other items included in subsection (b). The city engineer shall be responsible for approving the cost per acre submitted by the developer for the drainage area served by the facility, as provided in subsection (c).
(Ord. No. 90-8-9, § I, 8-13-90)
Ask a question about Plano law
Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.