For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 21-40 — Construction requirements

Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 21-40

Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/b6e923c0-770a-47c9-b367-8780db7ab211

Sec. 21-40. - Construction requirements.

(a) Electrical. 120v Ground Fault Circuit Interrupting ("GFCI") receptacle shall be installed immediately adjacent to the well equipment to allow for maintenance work on the equipment or the use of a freeze protection device. (b) Freeze protection. Adequate provisions must be made to protect piping from freezing by insulation or heat or both on all water wells. The RPZ relief valve must not be enclosed. (c) Backflow protection. An RPZ is the only approved backflow prevention assembly allowed on properties located within Plano, its ETJ or other premises. The RPZ is to be installed on all properties which contain a well. (d) Casing. A casing of steel or other approved material shall be provided to prevent caving of the formations penetrated and also to ensure protection of water supply from contamination by water from shallow strata. The wall shall be cased from the bottom of the drilled hole to twenty-four (24) inches above the finish grade or more if required to keep surface water from entering casing. The well casing shall be cemented in place and sealed to protect the underground water formation from potential contamination resulting from surface water or individual waste disposal systems (i.e. septic tanks). (e) Well seal. The annular space between the drilled hole and the well casing shall be sealed with concrete or grout for a depth of at least ten (10) feet above the water producing formation. The casing shall be covered at the ground with a concrete slab no less than twenty-four (24) inches by twenty-four (24) inches by twelve (12) inches. The top of the slab shall protrude six (6) inches above finished grade and shall be sloped away from the casing. The top of the casing shall be provided with a suitable well seal to prevent contamination of the well. If a vent is provided on the casing, it shall be equipped with an elbow turned downward and screened with a 16 gauge mesh screen. (f) Abandonment of wells. Permanently abandoned wells shall be filled with cement grout or Redi-mix concrete. Abandoned wells shall not be used for the disposal of wastewater, septic tank effluent or other wastes. (g) Screening. The water bearing formation shall be screened to control, among other similar conditions, the flow or production of sands and formation materials. (h) Compliance with Texas Department of Licensing and Regulation (TDLR) Rules and Regulations. Permittee shall comply with any and all TDLR rules and regulations and other governing state statutes.

(Ord. No. 2007-10-14, § II, 10-8-07)

Ask a question about Plano law

Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.