§ 6-653 — Deletions, additions, and amendments
Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 6-653
Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/7a0fc2b1-94ae-4b81-b661-8a07a9588cd2
Sec. 6-653. - Deletions, additions, and amendments.
The following deletions, additions and amendments to the Uniform Administrative Code adopted in this article are hereby approved and adopted: (1) Chapter 1, Title, Scope and General. Section 102.6, Moved Buildings, is amended by the addition of the following exception: Exception: Relocated buildings within the jurisdiction may comply with the requirements of the Uniform Code for Building Conservation when the building has been pre-designated or designated as a heritage resource. Section 103, Definitions, add definitions as follows: Licensing: a. Electrical license is authorization issued under the provisions set out in the Code of Ordinances of the City of Plano, allowing an individual to perform work which is controlled by the city electrical code. b. Mechanical license is authorization issued by the State of Texas allowing an individual to install air conditioning, heating and ventilating systems or their components. c. Plumbing license is a license issued by the State of Texas under the provisions of Article 6243.101, Vernon's Texas Civil Statutes, as amended (known as "The Plumbing License Law of 1974"). d. Registration is a contractor's registration obtained from the City of Plano. Toilets: a. Permanent toilet facilities: A room in an existing building or in the building being constructed with a water closet installed in such room which conforms to the plumbing code, and is continuously available to all workers involved in a construction project. b. Temporary toilet facilities: A portable, fully enclosed, chemically sanitized toilet which is serviced and cleaned at least once a week. Section 108 is added as follows: Registration. a. General. Any person submitting application or validation to obtain a permit in the City of Plano shall be registered as a contractor. Exception: Homeowners may obtain permits to do work at their residence without being registered. b. Registration Requirements. Contractors may register by making application on forms provided by the building official. Electrical, irrigation, mechanical and plumbing contractors shall provide proof of required license. c. Revocation/Suspension. A contractor's registration may be suspended for the following causes: 1. The contractor fails to finalize permits by obtaining the required, approved inspections. 2. The contractor allows use or occupancy of the structure for which a permit was obtained without first obtaining the required authorization. 3. The contractor has been found by the building standards commission to have been grossly negligent in the performance of his/her work. For the purposes of this section, a contractor may be found to have acted in a grossly negligent manner if such contractor has received six (6) municipal court convictions for City Code violations and if such violations occurred in the twelve-month period preceding the revocation/suspension action before the commission. 4. Expiration, suspension or revocation of required license, bond or insurance. Section 109 is added to read as follows: Every construction project requiring a building permit within the city limits of the City of Plano shall have adequate toilet facilities for workers associated with the project. The following shall be considered adequate facilities: Residential Construction Projects (Single-family). At least one (1) permanent or temporary toilet facility shall be maintained in each subdivision for the employees or subcontractors of each builder holding a permit for a building in that subdivision. A toilet facility must be provided by each builder as long as the builder holds an active building permit in the subdivision. Commercial Construction (Including Multi-Family). At least one (1) permanent or temporary toilet facility shall be maintained at every site where a building permit has been issued, as long as a building permit is active for the project. In addition to the justifications in the building code and in addition to other remedies, the building official may issue a stop work order as described in the building code for any work done on a project not in compliance with this section. (2) Chapter 2, Organization and Enforcement. Subsection 202.4, Stop Orders, is amended by the addition of the following paragraphs: a. Whenever work is being done that is authorized by a permit, and construction debris from that work is not confined to a container or to a site on the property; and such construction debris poses a threat to public health, safety and comfort so that it constitutes a nuisance, the building official or his designee shall give a written notice identifying the location and nature of such noncompliance and the contractor shall clean up the construction debris within twenty-four (24) hours of receiving written notice of the violation. At the end of the twenty-four (24) hour period, city shall re-inspect the site and shall assess a re-inspection fee. If at the time of such re-inspection, the construction debris is not confined at the site in accordance with the provisions of this section, city may issue a stop work order for the violation. When a stop work order has been issued, a re-inspection fee shall be assessed and a municipal court citation may be issued. To obtain a re-inspection for removal of the stop work order, a request must be submitted therefor and a re-inspection fee, as set by the building inspection department shall be paid. Section 204, Board of Appeals, is changed so that the section title shall read "Building Standards Commission." (3) Chapter 3, Permits and Inspections. Add a Subsection 301.1.1 to read as follows: Registration required. No person shall be allowed to obtain a permit or provide a validation for a permit for the purpose of contracting any general, electrical, mechanical or plumbing work unless that person holds the appropriate registration for that work. Exception: Registration is not required for a homeowner to obtain a permit to do work at their own residence. Subsection 301.2.1, Building Permits. Item numbers 1 and 2 of the first paragraph are deleted in their entirety, and the remaining items are renumbered accordingly. Section 302.3, Information on Plans and Specifications, add the following paragraphs: Foundation plans shall be submitted with each application. These plans shall be designed by an engineer licensed by the State of Texas and shall bear that engineer's seal. Exception: These plans shall not be required for Group U, Division 1 occupancies when not attached to another occupancy or Group U, Division 2 other than those which are required by separate ordinance. All structural plans for residential buildings in excess of seven thousand (7,000) square feet in area shall be designed by an engineer licensed by the State of Texas and shall bear that engineer's seal. Section 303.1 Issuance, add a paragraph: A demolition permit may be withheld for any building or structure within the Plano Historic Building and Site Survey as designated in the Preservation Plan for a period not exceeding thirty (30) days pending review by the Heritage Commission. Amend Section 303.4, Expiration, the first paragraph to read as follows: Every permit issued by the building official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within one hundred eighty (180) days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of one hundred eighty (180) days. Before such work can be recommenced, the permit shall be renewed and the fee to renew shall be one-half (½) the amount required for a new permit for such work, provided no changes have been made or will be made in the original plans and specifications for such work; and provided further that such suspension or abandonment has not exceeded six (6) months from the date of expiration. If the work has been abandoned for a period exceeding six (6) months from the date of expiration, the permittee shall pay a full permit fee for a new permit. Permits may only be renewed one (1) time. Permits which expire with outstanding failed inspections shall only be valid for a period of thirty (30) days from their renewal date unless specifically extended by the building official. Add a Section 303.6 to read as follows: Permits may be withdrawn by the applicant if no work has commenced on the project. Permit fees exceeding fifty dollars ($50.00) may be partially refunded. Where applicable, fees will be refunded at eighty (80) percent of their original value, excluding the plan review and fire protection plan review deposits. Permits for which work has commenced may not be withdrawn unless a subsequent permittee has obtained a permit to complete the work, or when work has started unless an inspection has been made and the building official has determined that the existing work has created no violation of any code or ordinance. Expired permits may not be withdrawn. Withdrawn permits with fees of less than fifty dollars ($50.00) are nonrefundable. Section 304.2, delete the first sentence and replace with the following: The fee for each permit shall be as set forth by the city council resolution. Add a Section 304.2.1 to [read] as follows: Fire Protection Plan Review Fee. All new and existing construction shall be assessed a fire protection plan review fee in addition to the permit fees. Said plan review fee shall be paid at the time of submitting building plans and specifications for review. Subsection 309.1, Use or Occupancy, first paragraph, is changed to read as follows and the exception thereunder is retained: Buildings or structures shall not be used or occupied nor shall a change in existing occupancy classification or reoccupancy of a building or structure or portion thereof be made until the building official has issued a certificate of occupancy therefor as provided herein. Subsection 309.2, Change in Use, is amended by the addition of the following paragraph: A change in occupant shall require that a corrected certificate be issued which will correctly reflect the current occupant. An inspection of the property shall be made to verify that the property complies with the provisions of the Plano Nonresidential Property Code.
(Ord. No. 98-5-5, § II, 5-11-98; Ord. No. 98-8-36, § I, 8-24-98)
Ask a question about Plano law
Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.
