For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-65 — Plan submission and approval

Code of Ordinances, City of Plano, Texas (Supp. No. 153: codified through Ordinance No. 2025-10-2, adopted October 13, 2025) · Plano City Code § 9-65

Corpus is an independent public-information project, not the official City of Plano website. Stable reference: corpuslaw.us/code/c93f139d-520b-44e4-ae71-7227f325ed7a

Sec. 9-65. - Plan submission and approval.

(a) Facility and operating plans. (1) When plans are required. a. A permit applicant or permit holder shall submit to the department plans and specifications properly prepared by an engineer, architect, or as otherwise approved by the department. Plans and specifications must be submitted for review and approval before: (i) The construction of a food establishment; Pf (ii) The conversion of an existing structure for use as a food establishment; Pf (iii) The remodeling of a food establishment or a change of type of food establishment or food operation, or under the conditions set by the department, if the department determines that plans and specifications are necessary to ensure compliance with this Code. Pf b. Any changes to the plans and specifications must be submitted to the department for approval prior to making the planned changes. Pf c. Prior to opening, the operator of the facility shall request a permitting inspection from the department. If deficiencies are found during this inspection, corrections shall be made prior to receiving approval to operate, or as determined by the department. Pf (2) Contents of the plans and specifications. The plans and specifications for a food establishment, including a food establishment specified under paragraph (3) of this subsection must include, as required by the department based on the type of operation, type of food preparation, and foods prepared, the following information to demonstrate conformance with code provisions: a. Intended menu; b. Anticipated volume of food to be stored, prepared, and sold or served; c. Proposed layout, mechanical schematics, and construction materials, and finish schedules; d. Proposed equipment types, manufacturers, model numbers, locations, dimensions, performance capacities, and installation specifications; e. Evidence that standard procedures that ensure compliance with the requirements of this Code are developed or are being developed; and f. Other information that may be required by the department for the proper review of the proposed construction, conversion or modification, and procedures for operating a food establishment. (3) When a HACCP plan is required. a. Before engaging in an activity that requires a HACCP plan, a permit applicant or permit holder shall submit to the department for approval a properly prepared HACCP plan as specified under subsection (a)(4) of this section and the relevant provisions of this Code if: (i) Submission of a HACCP plan is required according to law; (ii) A variance is required as specified under sections 9-25(a)(4)d., 9-30(a), or 9-37(d)(10)b.; or (iii) The department determines that a food preparation or processing method requires a variance based on a plan submittal specified under subsection (a)(1), an inspectional finding, or a variance request. b. Before engaging in reduced oxygen packaging without a variance as specified under section 9-30(b), a permit applicant or permit holder shall submit a properly prepared HACCP plan to the department. (4) Contents of a HACCP plan. For a food establishment that is required under subsection (a)(3) of this section to have a HACCP plan, the permit applicant or permit holder shall submit to the department a properly prepared HACCP plan that includes: a. General information such as the name of the permit applicant or permit holder, the food establishment address, and contact information; b. A categorization of the types of time/temperature control for safety foods that are to be controlled under the HACCP plan; Pf c. A flow diagram or chart for each specific food or category type that identifies: (i) Each step in the process, Pf and (ii) The steps that are critical control points; Pf d. The ingredients, recipes or formulations, materials and equipment used in the preparation of each specific food or category type and methods and procedural control measures that address the food safety concerns involved; Pf e. A critical control points summary for each specific food or category type that clearly identifies: (i) Each critical control point, Pf (ii) The significant hazards for each critical control point, Pf (iii) The critical limits for each critical control point, Pf (iv) The method and frequency for monitoring and controlling each critical control point by the designated food employee or the person in charge, Pf (v) Action to be taken by the designated food employee or person in charge if the critical limits for each critical control point are not met, Pf (vi) The method and frequency for the person in charge to routinely verify that the food employee is following standard operating procedures and monitoring critical control points, Pf and (vii) Records to be maintained by the person in charge to demonstrate that the HACCP plan is properly operated and managed; Pf f. Supporting documents such as: (i) Food employee and supervisory training plan that addresses the food safety issues of concern; Pf (ii) Copies of blank records forms that are necessary to implement the HACCP plan; Pf (iii) Additional scientific data or other information, as required by the department, supporting the determination that food safety is not compromised by the proposal; Pf and g. Any other information required by the department.

(Ord. No. 2025-4-2, § 1, 4-14-25)

Ask a question about Plano law

Corpus searches the Plano sections it holds and shows the ones that match, with their citations. Free, no sign-in.