SECTION I: - WATER MAIN EXTENSIONS

A. Plat Approval. As a prerequisite for approval of a plat of a new subdivision or replat of an existing subdivision by the City, the developer shall be required to install water transmission and distribution mains and service laterals within and/or adjacent to such new subdivisions as specified and required by the City Water Utility System. 1. Water Service Required. A public water supply from the City or San Angelo and a distribution system shall be installed, meeting all the criteria or this Chapter and the City of San Angelo Construction Design Standards, whichever are more stringent. The required public water supply shall not be required in only the following circumstances: a. If the proposed subdivision is a minor subdivision, as defined by this Ordinance or b. If the proposed subdivision is more than one (1) mile from an acceptable City of San Angelo water source, as determined by the Director of Public Works. When the proposed subdivision is more than one (1) mile from an acceptable City of San Angelo water source, the developer shall provide the distribution system and an acceptable and State licensed water supply system, which shall be dedicated to the City, together with the other subdivision improvements. Upon dedication by the developer and acceptance by the city, the City shall operate and maintain the system. The costs of maintenance and operation shall be borne by the residents of the subdivision, through a fee structure established by the City Council. 2. Water Service to Existing Subdivisions and Developments. Existing subdivisions and developments outside of the City limits that have not met the design criteria of this Chapter, shall be required to meet these design criteria before water service will be provided. The City Council may contract for construction of necessary improvements with the existing owners or [of] the subdivision or development and assess the total cost of construction, plus interest, to the owners of the existing subdivision or development. 3. Water Main and Hydrant Plan. After the final plat is approved, the developer shall, at his expense, have an engineer prepare and submit, to the Department of Public Works, complete plans for the water mains and hydrants for the new subdivision. The Department of Public Works shall have not less than three (3) weeks from the date of receipt of such original plans to approve same or request specified additions thereto. If revised plans are required, the Department of Public Works shall have one (1) week from the date of resubmission by the developer for review of the required additions, deletions or other changes. Such procedure shall continue until such plans and specifications meet final approval of the Department of Public Works. 4. Performance Security. The awarding of a construction contract, and/or advertising for construction bids, shall not occur prior to final plan and specification approval by the Department of Public Works and before the required bonds, securities or sureties as required by the City of San Angelo have been accepted. 5. Oversized Facilities. In the determination of plans and specifications for the installation of such water facilities for new subdivisions, the Department of Public Works shall require facilities to be constructed to Water System Standards to service the new subdivision, and the Department of Public Works may require the installation of off-site standard size facilities, or on-site and/or off-site oversized facilities to Water System Standards in anticipation of future requirements by land areas adjacent to such new subdivisions. 6. Connection to Existing System. The Department of Public Works may require such plans to provide for the on-site water distribution system to be connected to the existing water distribution system at more than one point. B. Installation Requirements. The developer shall be responsible for the installation of a water distribution system to provide domestic, fire protection, or industrial water within his development. 1. Design Demand. The distribution system within the development shall provide the total demand of the development. The design shall be based on use as projected by the developer. If the development use is changed after original design is approved, the developer shall provide the additional system, if such addition is required to meet the additional demand. The distribution system shall conform to the requirements and specifications as set forth by the Department of Public Works. 2. Service Connections. Service connections shall be provided for each lot or parcel of land requiring service. This requirement may be deferred to a later stage of the development process at the discretion of the Director of Public Works or designee as provided at Section II, Chapter 6 of this Ordinance. a. Paving Cuts. All precautions shall be taken to avoid paving cuts within the development. b. Size and Type. The size and type of services shall conform to the specifications for the development area. c. Changes and Additions. All State and City regulations shall be observed, and if at any time after completion of the development, the developer, owner, or builder changes or adds within the development, and such changes or additions require additional water service or fire service coverage, the party causing such additional service shall be responsible for the additional installation requirements. C. Construction Procedure. 1. Installation by a Contractor. The installation of required sized water facilities for new subdivisions may be performed by a contractor selected by the developer, based on the guidelines established by the Department of Public Works. 2. Oversized Water Facilities. In the case of oversized water facilities installation, the following shall apply: a. The Department of Public Works shall pay the difference of cost in pipe size required to oversize. b. The Department of Public Works shall purchase the oversized pipe under the competitive bids in accordance with the statutes of the State of Texas and the City Code of the City of San Angelo. c. The oversized pipes shall be furnished to the job site by the Department of Public Works, upon request by the developer. d. The developer shall be billed for the required size pipe cost and prompt payment of the developer's share shall be made. e. The City of San Angelo shall have no liability for the original payment for construction of facilities by the construction contractors. Upon the completion of such construction, pursuant to contract or contracts for construction, the City shall not be a signatory party to such contract or contracts; provided, however, that such construction shall nevertheless be subject to progress inspection by the Department of Public Works and shall be in compliance with all plans and specifications as stated in the Water System Standards. 3. Performance Bond. All contractors for construction of either standard or oversized facilities shall furnish a performance bond and payment bond executed by the contractor as principal, as provided in Article 160, Vernon's Texas Civil Statutes; and a corporate surety approved by the City of San Angelo, being payable to the City of San Angelo, for the benefit of the account of the Department of Public Works, in the event of default by the contractor. All such bonds shall be in a form approved by the City Attorney. 4. Inspection. The installation of such water facilities shall be subject to inspection by the Department of Public Works at and under reasonable times and conditions, including the aforesaid final inspection. Such inspections shall be on a regular basis by the Department so as to provide complete inspection or [of] underground or otherwise concealed installations prior to covering and/or concealment. 5. Letter of City Acceptance. Upon final approval by the Department of Public Works of such completed construction, the Department shall issue its letter of acceptance to the developer, with a duplicate executed original to be furnished by the Department to the Planning Department. D. Payment and Reimbursement. The developer shall timely pay the total cost and expenses incurred in the construction and installation of the required facilities to serve the new subdivision, including on-site, off-site, required size and oversized facilities. E. Connection to Existing Water Mains. The Department of Public Works may allow new proposed subdivisions to connect onto preinstalled water distribution mains when such property is adjacent to, or in the serviceable area of, such water distribution mains, under the following conditions: 1. The proposed subdivisions and other entities requiring water service may connect onto previously installed water distribution mains when such newly proposed subdivisions or other entities are located adjacent to, or in the area contemplated to be serviced by such preinstalled water distribution mains, provided that the Department of Public Works has predetermined that such proposed new subdivisions or other entities may be adequately serviced by such preinstalled water distribution mains. 2. Connections to existing water distribution mains shall be granted by the Department of Public Works upon the satisfactory determination of the aforegoing and upon payment to the Department of Public Works of the appropriate connection charges (front footage, acreage demand and/or water meter installation charges). F. Conditional Reimbursement to Developers for Off-Site Water Mains. The Department of Public Works will reimburse, to the developer who installed and/or paid for the installation of off-site water mains and fire hydrants, the front footage, and fire protection charges collected from connection of property adjacent to that off-site water main. The reimbursement period shall be for six (6) years after acceptance by the Department of Public Works of the off-site water mains from the developer. In no case shall the amount of reimbursement exceed the construction cost to the developer of the off-site water mains and fire hydrants. All reimbursement is made to the Department of Public Works by the developer or his assignee. The Department of Public Works, other customers, or developers may extend previously installed water line[s] without any reimbursement to the original installer other than the applicable front footage fee, it any, for abutting property. Reimbursement shall be outlined in contracts between the City and the developer who is paying for the main installation.

(1959 Code, title 9, ch. 4, ex. A; Ord. No. 2019-109, § 6, 8-20-19)