For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11.03.050 — Stormwater pollution prevention plan (SWPPP)

Code of Ordinances of the City of San Angelo, Texas (Codified through Ordinance No. 2025-103, enacted November 4, 2025. (Supp. No. 10)) · San Angelo Code of Ordinances § 11.03.050

Corpus is an independent public-information project, not the official City of San Angelo website. Stable reference: corpuslaw.us/code/2218e437-9857-496d-b820-f1d5945bd21d

Sec. 11.03.050 - Stormwater pollution prevention plan (SWPPP)

(a) The SWPPP must be completed and implemented prior to the beginning of construction activities. (b) The SWPPP must be updated and modified as required by the TPDES permit or in the following instances: (1) When there is a change in design, construction, operation, or maintenance which has a significant effect on the potential for the discharge of pollutants to the MS4, or surface water in the state, or the waters of the U.S. (2) If the SWPPP proves to be ineffective in eliminating or significantly minimizing pollutants, or in achieving the general objective of controlling pollutants in stormwater discharges associated with construction activity. (c) The operator must submit a copy of the appropriate construction site notice for a large or small construction and a copy of the notice of intent (if applicable). (d) All operators identified in the SWPPP must sign a copy of the certification statement listed in the TPDES construction general permit before conducting any professional service identified in the SWPPP. The certification must include: (1) The name and title of the person providing the signature; (2) The name, address, and telephone number of the contracting firm; (3) The address (or other identifying description) of the site; and (4) The date the certification is made. (e) The SWPPP and the certifications of all operators required by this section with any modifications attached, must be retained on-site at the construction site or, if the site is inactive or does not have an on-site location to store the plan a notice must be posted describing the location of the SWPPP. (f) The SWPPP must be made readily available at the time of an on-site inspection to a federal, state, or local agency approving sediment and erosion plans, grading plans, or stormwater management plans; local government officials including the administrator; and the operator of a municipal separate storm sewer receiving discharges from the site. (g) If the SWPPP is retained off-site, then it shall be made available as soon as reasonably possible. In most instances, it is reasonable that the SWPPP shall be made available within 24 hours of the request. (h) Qualified personnel, provided by the operator, must inspect at the chosen frequency per the TPDES construction general permit. (i) All protective measures in the SWPPP must be maintained in effective operating condition. (j) If the operator determines that BMPs are not operating effectively, then the operator shall perform maintenance as necessary to maintain the continued effectiveness of stormwater controls, prior to the next rain event if feasible. If maintenance prior to the next anticipated rain event is impracticable, the reason shall be documented in the SWPPP and maintenance must be scheduled and accomplished as soon as practicable, but in no case later than seven calendar days following the inspection. (k) Erosion and sediment controls that have been intentionally disabled, run over, removed, or otherwise rendered ineffective must be replaced or corrected immediately upon discovery. (l) A report summarizing the scope of any inspection required by this section must be made and retained as part of the SWPPP. The report must contain at a minimum the following: (1) The name(s) and qualifications of personnel making the inspection; (2) The date(s) of the inspection; (3) Major observations relating to the implementation of the SWPPP; (4) Actions taken in accordance with appropriate plan revisions. (5) Identification of any incidence of noncompliance; or if the report does not identify any incidence of noncompliance, the report must contain a certification that the facility is in compliance with the SWPPP, the TPDES permit, and this ordinance. (6) Signed by the person responsible for making it. (m) A copy of the CSN or NOT as required by the TPDES must be submitted to the city: (1) When a site has been finally stabilized and all stormwater discharges from construction activities that are authorized by this ordinance and by the TPDES permit are eliminated; or (2) When the operator of all stormwater discharges from the construction site changes.

(Ord. No. 2018-146, § 2, 12-11-18)

Ask a question about San Angelo law

Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.