Sec. 4.04.184 - General electrical construction requirements

(a) Disconnects. (1) Requirements. Outside main disconnects shall be required on all new structures and on new main service to existing structures. (2) Exceptions. (A) In buildings with sprinklers throughout, in accordance with NFPA 13, Standard for the Installation of Sprinkler Systems, disconnects may be installed in accordance with NFPA 70, National Electrical Code. (B) The building official may require an outside disconnect for safety concerns when the building or structure is constructed of at least Type IV construction and is normally unoccupied. (b) Temporary meter location and power permit. (1) Temporary power and/or lighting shall meet all requirements of this code and, when a meter installation is necessary, the meter shall be attached to a substantially mounted and braced pole. (2) If from ground mount transformer, the power drop shall conform to the requirements of this code. (3) All installations of temporary meter locations and/or temporary power shall be required to obtain an electrical permit. This may be a part of the initial electrical permit for the job. The electrical inspector shall approve and inspect the temporary meter location and/or temporary power at the first required inspection or at the rough-in inspection, whichever is appropriate. (c) Temporary power permit for buildings or premises under construction. Subject to all of the requirements for obtaining a general permit, a temporary power permit to temporarily energize the permanent service in a new building or structure, or in a building or structure being remodeled, may be issued. This permit may be issued for the time necessary to complete the construction that requires electrical power, for a period of time not to exceed 90 days. Upon the expiration of the temporary power permit, the electrical inspector shall have the authority to order the electrical power to the premises for which the permit was issued disconnected. If necessary to complete construction, more than one temporary power permit for construction may be issued per construction job. (d) Change of occupancy. If the occupancy classification of an existing building changes, the electrical system shall be made to conform to the intent of this code as required by the building official.

(Ord. No. 2018-128, § 2, 10-16-2018; Ord. No. 2023-017, § 1(Exh. A), 2-7-23)