For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.05.008 — Orders of the board

Code of Ordinances of the City of San Angelo, Texas (Codified through Ordinance No. 2025-103, enacted November 4, 2025. (Supp. No. 10)) · San Angelo Code of Ordinances § 4.05.008

Corpus is an independent public-information project, not the official City of San Angelo website. Stable reference: corpuslaw.us/code/d60d4ca4-ecb1-4fec-ac23-3eabd3e312c6

Sec. 4.05.008 - Orders of the board

(a) The board may issue any of the following orders: (1) Order to repair, remove or demolish. It is economically feasible for the building to be repaired so that it will no longer exist as a dangerous, dilapidated or substandard building. (2) Order to remove or demolish. It is not economically feasible for the building to be repaired so that it will no longer exist as a dangerous, dilapidated or substandard building. (3) Order to vacate the structure and relocate the occupants, which order may be in addition to orders entered pursuant to subsection (a)(1) or (2) of this section. The building is occupied and violates the standards set out in this article such that it is unfit for human occupation. (4) Order to release. The building is not found to violate the standards set out in this article to the degree requiring abatement. (b) If the structure is occupied and the board issues an order pursuant to subsection (a)(3), the structure shall be vacated and the occupants relocated. (c) Orders of the board issued pursuant to subsections (a)(1), (2) or (3) shall allow 60 days for the ordered action to be completed. (d) If a residential structure is removed or demolished pursuant to this article, any and all accessory structures located on the same property shall be removed or demolished, regardless of structural condition. (e) The inspector shall promptly mail a copy of any order issued pursuant to subsection (a) of this section to the owner of record, any lienholder or mortgagee along with a notice containing the following: (1) An identification of the building or structure and the property on which it is located; (2) A description of the violation(s) of the minimum standards; (3) A statement that the municipality will vacate, secure, remove or demolish the building or structure if the ordered action is not taken within 60 days. (f) Sixty days after an order to repair, remove or demolish has been issued, the inspector has the authority to request the utilities be disconnected at the structure or structures in order to prepare for demolition. (g) Once an order to remove or demolish has been issued by the board and at least 30 days have passed, the inspector has the authority to request that utilities be disconnected at the structure in order to prepare for removal or demolition of the structure after the time for compliance by the owner has passed and the structure remains unabated. (h) Within ten days following the date that an order is issued, the inspector shall: (1) File a copy of the order in the office of the city clerk; and (2) Publish in a newspaper of general circulation in the city a notice containing the following: (A) The street address or legal description of the property; (B) The date the hearing was held; (C) A brief statement indicating the results of the order; and (D) Instructions stating where a complete copy of the order may be obtained.

(1996 Code, sec. 4.1207; Ordinance adopted 9-2-08; Ordinance adopted 1-19-16)

Ask a question about San Angelo law

Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.