SECTION IV: - DRAINAGE
A. Requirements. The Planning Commission shall not recommend for approval any plat that does not make adequate provision for stormwater drainage. Possible actions that may be required include, but are not limited to, the following: 1. Lot Layout. Lots should be laid out so as to provide positive drainage away from all buildings and individual lot drainage should be coordinated with the general storm drainage pattern for the area. Drainage should be designed so as to avoid concentration of storm drainage water from each lot to adjacent lots. 2. Drainage Rights. When a proposed drainage system will carry water across private land outside the subdivision, appropriate drainage rights must be secured and indicated, or referenced, on the plat. 3. Easements. Adequate drainage easements shall be obtained and designated on the subdivision plat, when required by the City. 4. Drainage Networks. Drainage networks shall be designed to accommodate potential runoff from the entire upstream drainage area, whether inside or outside the subdivision. The Director of Public Works will approve the proposed size of all structures, based on the provisions in the design standards and specifications. 5. Drainage Studies. Compliance with City Code of Ordinances, Chapter 12, Article 12.05 "Stormwater Management" ordinance is required. The developer may be required to provide preliminary and final drainage studies prepared by a licensed engineer for review and approval by the City Engineer. The study should include an examination of the runoff alterations of each proposed subdivision on existing off-site downstream drainage facilities. Local government drainage studies, together with such other studies as may be pertinent, should serve as a guide to needed on-site and off-site drainage system improvements. Where it is anticipated that the additional runoff produced or caused by the development of the subdivision will overload existing downstream drainage facilities, the City Engineer may recommend that the City withhold approval of the final plat until provision has been made for compliance with stormwater management requirements in a manner as the City Engineer determines to be adequate. A subdivision plat that does not satisfactorily provide for containment and/or conveyance of all on-site and off-site stormwater runoff shall not be finally approved by the Planning Commission or City Council except if deferred as herein provided. The required drainage studies, and associated improvements, may be deferred to a later stage of the development process at the discretion of the City Engineer as provided at Section II, Chapter 6 of this Ordinance. 6. Flooding. a. 50- and 100-Year Flood. For usual drainage design considerations, the fifty (50) year flood should be contained in the street right-of-way, and the one hundred (100) year flood should not inundate buildings and homes. b. Development Permit. Subdivisions located within the one-hundred-year floodplain, 25 [sic] determined by the latest Federal Flood Insurance Maps, shall be required to obtain a floodplain development permit from the Director of Public Works. 7. Indemnification. The developer may be required to submit legal documents indemnifying the City for those areas where surface runoff from streets, alleys and drainageways discharges onto private property.
(1959 Code, title 9, ch. 4, ex. A; Ord. No. 2019-109, § 5, 8-20-19); Ord. No. 2019-109, § 5, 8-20-19)
Ask a question about San Angelo law
Corpus searches the San Angelo sections it holds and shows the ones that match, with their citations. Free, no sign-in.