§ 34-1202 — Distribution main oversizing

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 34-1202

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/7c8745c8-4485-4fc8-bfc5-1fd25f3e543a

Sec. 34-1202. - Distribution main oversizing.

SAWS may require that a distribution main being constructed by a recycled water customer be increased in diameter to a diameter larger than reasonably necessary to provide adequate recycled water service to a customer's property as a condition of approving the customer's plans and specifications for the distribution main. SAWS shall, upon completion of a distribution main constructed by a customer which meets SAWS' required sizing, reimburse the customer the reasonable incremental cost of the construction of the larger mains. The customer's responsibility for a share of the total cost of the oversized main will be limited to the greater of the scheduled charge for a six-inch main or prorated share of the total cost of the oversize main. Cost sharing for distribution mains shall be based on the following examples: Example 1: Required recycled water size main, 8 inches | Flow capacity, 848 GPM Oversize recycled main constructed, 16 inches | Flow capacity, 3,393 GPM Length of main constructed= | 1,980 feet Cost per linear foot= | $ 33.33/foot Total main construction cost= | 66,003.00 Prorated customer share of main cost: 848 / 3393 = 0.2499 0.2499 x $66,003.00 = $16,494.00 Customer pays cost of six-inch main or prorated cost of $16,494.00, whichever is greater. Example 2: Required recycled water size main, 16 inches | Flow capacity, 3,393 GPM Oversize recycled main constructed, 20 inches | Flow capacity, 5,729 GPM Length of main constructed= | 2,013 feet Cost per linear foot= | $ 49.76/foot Total main construction cost= | $104,655.00 Prorated customer share of main cost: 3393 / 5729 = 0.5922 0.5922 x $104,655.00 = $61,976.00 Customer pays prorated cost of $61,976.

(Ord. No. 87597, § 1, 3-26-98)