For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 34-451 — Septic tanks—Permit required; percolation tests

San Antonio City Code (Supp. No. 147: codified through Ordinance No. 2026-09-10-547, adopted Sept. 10, 2026) · San Antonio City Code § 34-451

Corpus is an independent public-information project, not the official City of San Antonio website. Stable reference: corpuslaw.us/code/2335a909-2b83-44bd-9595-87a0863ffba4

Sec. 34-451. - Septic tanks—Permit required; percolation tests.

It shall hereafter be unlawful for any person to construct a septic tank system without first obtaining a written permit from the director of public health. Such permit shall be displayed at the site of construction until approval is obtained from the director of public health. Prior to issuance of such a permit, percolation tests shall be conducted at the site of the proposed installation. These percolation tests shall be conducted by the director of public health or a registered professional engineer and shall serve as a basis for determining the minimum length of disposal line as outlined in section 34-208. All percolation tests shall be conducted in accordance with procedure as outlined by the director of public health. The fee for conducting the percolation tests by the director of public health shall be ten dollars ($10.00), payable in advance. Results of percolation tests must be submitted at the time of application for permit.

(Code 1950, § 58-6; Ord. No. 21416, § 2, 6-23-55; Code 1959, § 18-71; Ord. No. 80574, § 11, 8-4-94)

Ask a question about San Antonio law

Corpus searches the San Antonio sections it holds and shows the ones that match, with their citations. Free, no sign-in.