Sec. 11-29. - Inspection Requirements.
A. At a minimum, the stormwater management facility must be inspected annually to evaluate the primary function of the stormwater management facility and to ensure that all post-construction stormwater control measures are operating correctly and are being maintained consistent with the maintenance plan. B. Persons responsible for the operation and maintenance of a stormwater management facility must make records of the installation and of all maintenance and repairs. Records of the inspection, maintenance and repairs must be completed, signed by the responsible person, and retained for a minimum of 5 years, for review upon City request. As-built plans of the stormwater management facility must be retained for the duration of the existence of the stormwater management facility. Copies of the as-built plans and records of all self-inspections, maintenance, and repairs shall be kept on-site and shall be made available to the City during inspection of the stormwater management facility and at other reasonable times upon City's request. C. Person(s) responsible for the operation and maintenance of a stormwater management facility must inspect and evaluate the following, if present, at each stormwater management facility: 1. Dams, berms, levees; 2. Spillways; 3. Inlets; 4. Pipes, culverts, and appurtenances; 5. Outlets; 6. Bank erosion; 7. Sedimentation; 8. Vegetation; 9. Trash and debris; 10. Water quality impairments; and 11. Any other stormwater management facility. D. Deficiencies identified in the inspection must be noted in the inspection report and recommended corrective actions must be documented and maintained with the report. E. Deficiencies must be addressed within 90 days from the date identified unless additional time is approved by the Director. The person responsible for the inspection must document the resolution of each deficiency identified in the inspection report. F. The first inspection report and inspection reports every 5 years afterwards shall be submitted and sealed by a licensed professional engineer in the State of Texas. Inspections by the professional engineer are not required to be extended beyond visual field observations and review of as-built plans unless deficiencies are identified that, in the opinion of the professional engineer or Director indicate the need for a more detailed investigation. G. The first inspection report shall be submitted to the City upon completion of construction of the stormwater management facility, along with the as-built plans. Subsequently, inspection reports shall be submitted annually by January 31 for the preceding calendar year inspection or 180 calendar days from the adoption of this Article, whichever is later. Additional inspection reports may be required by the City in the event of a natural disaster or after a large storm event, upon the Director's request to evaluate the structural integrity and function of the stormwater management facility.
(Ord. No. 2037, § 7, 12-1-15)
Ask a question about Sugar Land law
Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.