§ 2-137 — Community development fees
Code of Ordinances of the City of Sugar Land, Texas (Supp. No. 56: codified through Ordinance No. 2403, adopted June 16, 2026) · Sugar Land Code of Ordinances § 2-137
Corpus is an independent public-information project, not the official City of Sugar Land website. Stable reference: corpuslaw.us/code/6ee5bf46-fde4-4a9c-8635-14be85d6d298
Sec. 2-137. - Community development fees.
The fees set out below are adopted for the city services outlined therein: (a) Building permits, licenses and inspections: *If the contractor begins work prior to the issuance of any required permit, all fees established below are to be doubled. Re-inspections under the building, plumbing, mechanical, or electrical code required as a result of a failure to pass the initial inspection or if the system is not ready for inspection at the requested time will result in a $59.75 fee for the first re-inspection, and each re-inspection thereafter. (1) Commercial building: Building permit and plan check fees (based on construction value). The minimum total fee for any commercial building permit will be $150.00. a. First $1,000.00 or fraction thereof .....$150.00 Additional $1,000.00 or fraction thereof, up to and including $50,000.00 .....$7.75 b. First $50,000.00 .....$529.75 Additional $1,000.00 or fraction thereof, up to and including $100,000.00 .....$6.50 c. First $100,000.00 .....$854.75 Additional $1,000.00 or fraction thereof, up to and including $500,000.00 .....$4.75 d. First $500,000.00 .....$2,754.75 Additional $1,000.00 or fraction thereof .....$2.50 e. Plan checking fee—One-half of building permit fee when valuation exceeds the minimum permit fee. ..... f. Plan resubmittal fee: ..... First and second resubmittal .....No charge Third and each subsequent resubmittal .....5% of original plan-check fee or $150.00, whichever is greater g. Revision fee .....$150.00 per revision to approved permit application (2) Residential building: ..... Building permit and plan check fees (based on square footage). a. One—100 square feet .....$55.00 base permit Additional square feet, up to 500 .....$.55 per square foot b. 501 square feet .....$275.00 base permit Additional square feet, up to 1,000 .....$.60 per square foot c. 1,001 square feet .....$600.00 base permit Additional square feet, up to 1,500 .....$.60 per square foot d. 1,500 square feet .....$900.00 base permit Additional square feet, up to 2,000 .....$.60 per square foot e. 2,001 square feet .....$1,200.00 base permit Additional square feet, up to 3,000 .....$.60 per square foot f. 3,001 square feet .....$1,800.00 base permit Additional square feet, up to 4,000 .....$.60 per square foot g. 4,001 square feet .....$2,400.00 base permit Additional square feet, up to 5,000 .....$.75 per square foot h. 5,001 square feet .....$3,250.00 base permit Additional square feet .....$.75 per square foot i. Plan checking fee .....One-half of building permit fee j. Pool permit .....$330.00 k. Pool plan check .....$162.50 l. Roof permit .....$127.00 m. Foundation/piers and pilings .....$153.25 n. Fence permit .....$92.00 for first 50 feet, $12.50 per additional 50 ft. o. Generator permit (50kw and larger) .....$330.00/$165.00 plan check (3) Commercial and residential building: ..... a. Overtime inspections, per hour (minimum of two hours) .....$100.00 b. Moving permit for moving any building or structure .....$144.25 (4) Demolition permit fees: ..... a. Commercial: ..... First 100,000 cubic feet .....$72.00 Each additional 1,000 cubic feet or fraction thereof .....$.50 b. Residential: ..... Base fee .....$72.00 Plan checking fee for The Hill Residential District (HR-1) .....one-half of residential demolition permit fee (b) Plumbing services and gas permit fees: ..... (1) Commercial building: ..... a. Plumbing services and gas permit base fee, first $2,000.00 in construction valuation .....$150.00 b. Each additional $1,000.00 of value, or fraction thereof .....$4.25 (2) Residential building: ..... Base fee of $41.25 plus any number of the following, each: a. Plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection) .....$12.25 b. Building sewer .....$44.25 c. Each sample well .....$22.25 d. Each water heater and/or vent .....$12.25 e. Installation of water piping .....$12.25 f. Installation of water treating/softening equipment .....$12.25 g. Backflow protective device .....$12.25 h. Interceptors/separators (each) .....$44.25 i. Gas inspection fee—1 to 3 openings .....$22.25 j. Gas inspection fee—Each additional opening .....$7.25 k. Storm sewer tie in .....$73.50 l. Catch basin or outside area drain—First two .....$22.25 m. Catch basin or outside area drain—each additional installed under same permit .....$12.25 n. Junction box (each) .....$12.25 o. Roof drain or outside downspout .....$12.25 (c) Irrigation permit fee: ..... (1) Residential irrigation system permit .....$107.00 (2) Commercial irrigation system permit .....$66.75 plus $36.75 per irrigation zone (d) Mechanical services fee: ..... (1) Commercial buildings: ..... a. Building Permits and Mechanical Services base fee, first $2,000.00 in construction valuation .....$150.00 b. Each additional $1,000.00 of value, or fraction thereof .....$4.25 (2) Residential buildings: ..... a. Up to 5,000 square feet .....$132.75 b. 5,001 to 10,000 square feet .....$187.25 c. 10,001 to 15,000 square feet .....$271.50 d. 15,001 to 20,000 square feet .....$543.50 e. 20,001 square feet and above .....$784.50 f. HVAC replacements .....$115.00 (e) Electrical services fee: ..... (1) Change of occupancy permit .....$44.25 (2) Commercial buildings: ..... a. Building permits and electrical services base fee, first $2,000.00 in construction valuation .....$150.00 b. Each additional $1,000.00 of value, or fraction thereof .....$4.25 (3) Residential buildings: ..... Building permits and electrical services base fee .....$44.25 Base fee plus any number of the following, each: a. Meter loop and service—Up to and including 50 Kw .....$22.25 b. Meter loop and service—Over 50 Kw through 250 Kw .....$22.25 c. Meter loop and service—Over 250 Kw .....$44.25 d. Sub panel with eight or more circuits (each) .....$12.25 e. Electric heat—Up to and including one Kw .....$12.25 f. Electric heat—One Kw through ten Kw .....$12.25 g. Electric heat—Over ten Kw .....$12.25 h. Electric heat—Plus, per Kw .....$2.25 i. Outlets .....$1.00 j. Lighting fixtures .....$1.00 k. Range receptacle .....$7.25 l. Clothes dryer .....$7.25 m. Cooking tops .....$7.25 n. Ovens .....$7.25 o. Garbage disposals .....$7.25 p. Dishwasher .....$7.25 q. Miscellaneous .....$24.50 r. Motion picture/commercial sound equipment .....$12.25 s. X-ray machines .....$12.25 t. Motors—Up to and including one Hp .....$7.25 u. Motors—Over one Hp through ten Hp .....$11.75 v. Motors—Over ten Hp .....$12.25 w. Motors—Plus, per Hp .....$2.50 x. Transformers—Up to and including one Kva .....$2.50 y. Transformers—Over one Kva through ten Kva .....$12.25 z. Transformers—Over ten Kva .....$12.25 aa. Transformers—Plus, per Kva .....$2.50 bb. Ball park and parking lot light poles (each) .....$44.25 cc. Pole with guy wire (each) .....$12.25 dd. Temporary saw pole .....$29.50 ee. TCI/letter required .....$44.25 ff. Reconnection fee .....$44.25 gg. Sign circuit .....$12.25 hh. Water heater (each) .....$12.00 ii. Electrical underground inspection .....$22.25 jj. Electrical panel inspection .....$29.50 (f) Sign permit and inspection fees: ..... (Monument and walls, wind banners, or other wind devices require a sign permit.) Sign permit and inspection base fee .....$44.25 (1) First $1,000.00 of valuation .....$21.75 (2) Plus: Additional $1,000.00 of valuation .....$11.25 (g) Subdivision fees: ..... (1) Plats: ..... a. Preliminary plat, base fee per submittal .....$1,443.75 b. Final plat, base fee per submittal .....$1,443.75 c. In addition to the base fee above, the following fees apply: ..... Per each lot .....$3.75 Per each acre and/or fraction of an acre in reserves .....$20.00 (2) Replats: ..... a. Preliminary replat, base fee per submittal .....$1,342.00 b. Final replat, base fee per submittal .....$1,342.00 c. In addition to the base fee above, the following fees apply: ..... Per each lot .....$3.75 Per each acre and/or fraction of an acre in reserves .....$20.00 (3) Amending or minor plat/replat, per submittal .....$638.00 (4) Subdivision variances if not submitted as part of a plat approval, per separate request .....$933.75 (5) Infrastructure Construction plan review and engineering inspection fee: ..... a. Plan review, base fee per submittal .....$386.50 b. In addition to plan review, the following field inspection fees apply: $0.75/linear foot of installed public water line including appurtenances $1.25/linear foot of installed gravity or pressurized sanitary sewer line including appurtenances $2.25/linear foot of installed storm sewer line including appurtenances $3.75/linear foot of up to 15-ft width sections of pavement installed $1,502.50 for new lift station installations (6) General land plan review. Base fee of $3,324.50 per submittal, plus $13.00/acre or fraction of an acre. No single general land plan review fee will exceed $4,136.00 (7) General land plan minor amendment (no new or revised impact analysis required) .....$872.75 (8) General land plan major amendment (new or revised impact analysis required) .....base fee of $2,148.75 per submittal plus a fee of $13.25 /acre or fraction of an acre. No single general land plan major amendment fee will exceed $5,062.71 (9) Parkland fees in lieu of dedication of land: ..... a. Per single family lot .....$448.00 b. Multi-family development per unit .....$307.25 (h) Zoning Fees: (1) Site plan review. For development of non-single-family sites on platted reserves or lots, per each set of plans a. Initial submittal .....$792.25 b. First resubmittal .....no charge c. Subsequent resubmittals, each .....$223.25 (2) Site development permit within the mixed use conservation (MUC) district and/or Hill Area Residential (HR-1) zoning district .....$581.25 (3) Planned development (PD) district fee. Required for general development plans and final development plans. Base fee of $2,303.25 per submittal, plus a fee of $25.75/acre or fraction of an acre, not to exceed $3364.50 per submittal. (4) Administrative amendment to PD .....$259.75 (5) Conditional use permit application fee, per separate request .....$2,148.75 (6) Redevelopment Concept Review .....Base fee of $3,097.50 per submittal, plus $12.00/acre or fraction of an acre. (7) Special exception application fee, per separate request .....$758.50 (8) Zoning variance to the Zoning Board of Adjustment, if not submitted as part of a plat approval, per separate request .....$925.75 (9) Zoning renotification fee. Required when republication of a zoning hearing is required as a result of an action by the applicant. Fee is based on the actual cost of publication. ..... Initial deposit .....$2,842.75 Plus $6.50 per property owner notified within 200 feet of the area to be considered for rezoning or conditional use permit. If needed, alternate publication fee .....$300.25 *Additional amount owed, or refund based on actual cost of publication; (10) Zoning appeal to the Zoning Board of Adjustment .....$590.25 (11) Standard rezoning fee, per request .....$1,443.00 (12) Zoning verification .....$55.75 (i) Miscellaneous land development fees: ..... (1) Development agreement .....$3,408.00 (2) Annexation petition .....$4,538.00 (3) Utility District, Public Improvement, or other special district fees: ..... a. Process petition to create district (other than Public Improvement District) .....$38,899.75 b. Process petition to acquire or annex land (other than Public Improvement District) .....$38,899.75 c. Public Improvement District Application .....$20,000.00 (4) Driveway variances, per each separate request .....$603.75 (5) Flood zone development permit fee .....$129.75 (Fee required unless exempt by state or federal law) (6) Land disturbance fee .....$129.75 (7) Vested rights .....$973.00 (8) Fire Station fee .....$10.25 (9) Traffic Impact Analysis Plan Review fee, per submittal .....$382.00 (10) Traffic Impact Analysis fee .....$10,000.00
(Ord. No. 2246, § 1, 9-21-2021; Ord. No. 2282, § 1, 9-20-2022; Ord. No. 2314, §§ 1, 5, 9-19-2023; Ord. No. 2327, § 1, 12-19-2023; Ord. No. 2355, § 1, 9-17-2024; Ord. No. 2382, § 1, 9-16-2025)
Ask a question about Sugar Land law
Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.
