For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2-172 — General Yard Regulations (Setbacks)

Code of Ordinances of the City of Sugar Land, Texas (Supp. No. 56: codified through Ordinance No. 2403, adopted June 16, 2026) · Sugar Land Development Code § 2-172

Corpus is an independent public-information project, not the official City of Sugar Land website. Stable reference: corpuslaw.us/code/50e326f5-74dc-4f44-a30c-e2c690a15436

Sec. 2-172. - General Yard Regulations (Setbacks).

A. Setbacks must be measured from the property line. The area between the property line and the setback establishes the required Yard. However, on lots with access from an Access Easement or alley, setbacks shall be measured from the nearest edge of curb. B. Except as otherwise provided in this Chapter, a Building may not be located or extend within the required Front, Side, or Rear Yard. C. Where more than 1 Principal Building is located on a Lot, the required Yards must be maintained around the group of Principal Buildings. D. The Front Yard of a corner Lot is the Yard that fronts upon the Lot Line of least dimension that separates the Street from the Lot. E. Exceptions to setback requirements: 1. Where a platted Lot abuts that portion of a Street that contains a turn lane that prevents the Lot from meeting the same minimum Yard requirements of adjacent Lots in the same block that do not abut the turn lane, the required Yard of the Lot shall be measured from a line determined by extending the same Lot Line that determines the same minimum Yards required of the adjacent Lots located on the same side of the Street and within the same block that do not abut the turn lane. (See Figure 2-172.A) [image omitted; see the official code] Figure 2-172.A 2. Where Street right-of way has been increased, all setbacks on a platted developed Lot adjacent to the Street Right-of-Way may comply with the setback requirements established prior to the increase in street Right-of-Way. A platted developed Lot need not comply with the Yard requirements applicable to the Front Yard or Street Side Yard if the Yard is reduced below the required minimum because of an increase in the Street Right-of-Way (see Figure 2-172.A).

Ask a question about Sugar Land law

Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.