§ 2-253 — Application Procedures
Code of Ordinances of the City of Sugar Land, Texas (Supp. No. 56: codified through Ordinance No. 2403, adopted June 16, 2026) · Sugar Land Development Code § 2-253
Corpus is an independent public-information project, not the official City of Sugar Land website. Stable reference: corpuslaw.us/code/562b0e32-8582-49cb-aa18-6bc62d1f85bf
Sec. 2-253. - Application Procedures.
An application for a Conditional Use Permit for a Tower, Antenna, or use of an Alternative Tower Structure must be made to the Director. An application will not be considered until it is complete. A complete application must contain the following: A. An inventory of the applicant's existing Towers that are either within the City or within 1 mile of the corporate limits, specifying the location, Height, and design of each tower. The Director may share the information with other applicants for a Conditional Use Permit under this Article. B. Site plans to scale specifying the location of tower(s), transmission Building and other Accessory Uses, street access, parking, Fences, Landscaped Areas, and adjacent land uses. C. A report from a professional structural engineer licensed in the State of Texas documenting the following: 1. Tower Height and design, showing a cross-section of the Tower Structure. 2. Total anticipated capacity of the Tower Structure, including the number and types of Antennas which can be accommodated. D. A letter of intent to lease excess space on the Tower and to lease additional excess land on the Tower site when the shared use potential of the Tower is absorbed, if structurally and technically possible. E. Each applicant must make a good faith effort to substantially demonstrate that no existing Towers could accommodate the applicant's proposed Antenna by doing the following: 1. The applicant must contact the owners of all existing Towers of a Height roughly equal to or greater than the Height of the Tower proposed by the applicant. A list must be provided of all owners contacted, the date of the contact, and the form and content of the contact. Where an existing Tower is known to have capacity for additional Antennas of the sort proposed, that application for a new Tower is not complete until the owner of the existing Tower responds, unless the applicant submits sufficient information for the Director to determine that all reasonable efforts to obtain a response have been made and further efforts would be futile. 2. The applicant must request the following information from each Tower owner contacted: a. Identification of the site by location, existing uses, and Tower Height. b. Whether each Tower could structurally accommodate the Antenna proposed by the applicant without requiring structural changes be made to the Tower. To enable the owner to respond, the applicant must provide each owner with the Height, length, weight, and other relevant data about the proposed Antenna. c. Whether each Tower could structurally accommodate the proposed Antenna if structural changes were made, not including totally rebuilding the Tower. If so, the owner must specify in general terms what structural changes would be required. d. If structurally able, shared use by the existing Tower would be precluded for reasons related to RF interference. If so, the owner must describe in general terms what changes in either the existing or proposed antenna would be required to accommodate the proposed Tower, if at all. 3. The Director must maintain and provide, on request, records of responses from each owner. Once an owner demonstrates an Antenna of the sort proposed by the applicant cannot be accommodated on the owner's Tower as described below, the owner need not be contacted by future applicants for Antennas of the sort proposed. 4. Shared use is not precluded simply because a reasonable fee for shared use is charged, or because of reasonable costs necessary to adapt the existing and proposed uses to a shared Tower. The Director and the City Council may consider expert testimony to determine whether the fee and costs are reasonable. Costs exceeding new Tower development are presumed unreasonable. F. Any other information which may be requested by the Director to fully evaluate and review the application and the potential impact of a proposed Tower or Antenna.
Ask a question about Sugar Land law
Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.
