§ 5-35 — Improvements

Code of Ordinances of the City of Sugar Land, Texas (Supp. No. 56: codified through Ordinance No. 2403, adopted June 16, 2026) · Sugar Land Development Code § 5-35

Corpus is an independent public-information project, not the official City of Sugar Land website. Stable reference: corpuslaw.us/code/180b6d89-e47c-4975-a9b4-29ee1c779785

Sec. 5-35. - Improvements.

A. All subdivisions must provide public improvements that the City shall accept, if located in the corporate City limits, or issue a certificate of compliance, if located in the extraterritorial jurisdiction. The required public improvements of the subdivision shall include, but are not limited to, the following: 1. Water and wastewater facilities; 2. Drainage facilities; 3. Streets; 4. Street lights; 5. Street signs; 6. Sidewalks; 7. Traffic-control devices required as part of the subdivision; and 8. Appurtenances to the above, and any other public facilities required as part of the proposed subdivision. B. All aspects of the design and implementation of public improvements shall comply with the Design Standards and any other applicable City codes and ordinances, including preparation and submittal of infrastructure construction plans and construction inspection. However, when property is subdivided for nonresidential or multifamily lots and Sidewalks are the only public infrastructure required by this Chapter, submittal of construction plans will not be required. C. All subdivisions in the extraterritorial jurisdiction shall also be reviewed and approved by Fort Bend County. D. Prior to the final approval construction of the streets and utilities, monuments for the subdivision shall be in place for the perimeter, Right-of-Way corners, angle points, and points of curvature using an iron pipe or rod of not less than 5/8 inch in diameter and 36 inches long and set 6 inches below finished grade. Plat boundary corners shall be set and shall include a cap or tag with the surveyor's registration number. Acceptance by the City shall be contingent upon proper documentation. All lot corner monuments shall be set prior to the issuance of a building permit or the beginning of principal building construction. The lot corner monuments shall be iron rods not less than ½ inch in diameter and 24 inches in length. E. The final approval of construction and acceptance of the improvements in a subdivision shall be in accordance with the requirements established in the current Design Standards. F. Building Permit Statement to be Recorded on Plat. The City shall not issue any permits for construction within the subdivision within the corporate limits, except permits to construct public improvements, until such time as all public improvements of the subdivision have been constructed and accepted by the City or a certified check, performance bond or letter of credit is provided to and accepted by the City. A notation stating the above shall appear on each Final Plat. G. Guarantee of Public Improvements. Before considering the Final Plat of a subdivision, the City must be satisfied that all public improvements required will be constructed in accordance with the requirements in the Design Standards. 1. The subdivider shall, unless the City Council has determined otherwise, guarantee these public improvements will be constructed in one of the following ways: a. Deposit a certified check with, and payable to, the City in an amount equal to the cost to complete such public improvements, including the cost of remaining engineering and inspection services; b. Furnish the City with a performance bond executed by a surety company authorized to do business in the State of Texas in an amount equal to the cost to complete such public improvements, including the cost of remaining engineering and inspection services. The performance bond shall be in a form approved by the City Attorney and must be executed by a corporate surety in conformance with the standards of Texas Government Code Chapter 2253; c. Furnish the City with a letter of credit payable by an acceptable financial institution to the City in a form approved by the City Attorney, guaranteeing the payment of an amount equal to the cost to complete such public improvements including the cost of remaining engineering and inspection services. The letter of credit shall be irrevocable and shall be for a term sufficient to cover the 12-month period plus an additional 30 calendar days and require only that the City present the issuer a letter signed by an authorized representative of the City certifying to the City's right to draw or collect funds under the specific terms of the letter of credit; or d. As an alternative to providing financial securities for public infrastructure associated with the final plat, the subdivider may construct all improvements, receive initial acceptance of the improvements, and provide a maintenance bond guaranteeing their maintenance as required herein. If all public improvements have not been constructed at the time the subdivider requests plat recordation, the subdivider shall provide a financial security (Performance Bond, Letter of Credit, or Certified Check) in the amount of the improvements not yet constructed. 2. The above requirements for guarantees do not apply to the following: a. Public water, wastewater, paving, and drainage improvements financed through a municipal utility district, levee improvement district or other special district created under state law. b. Sidewalks that directly front or side single-family residential lots that will be constructed when the lot is improved. 3. In all instances, the original mylar copies of the Final Plat, without benefit of required signatures of City officials, shall be held in escrow by the Director and shall not be released for any purpose until the improvements are constructed or a financial security is provided, unless exempt from guarantee requirements as stated above. 4. Upon the requirements of this Section being satisfied, the Final Plat shall be considered fully approved, except as otherwise provided for in these regulations, and the original copies of the Final Plat shall be signed by the appropriate City officials. 5. If a performance bond or a letter of credit is the method selected by the subdivider for guaranteeing such improvements, such document is subject to the condition that the public improvements will be completed within 12 months after recordation of the Final Plat, unless a longer time is approved by the City, upon the determination that such longer time period would not be unreasonable. If the required public improvements guaranteed by the performance bond or letter of credit are not or will not be completed within the time specified by the City, the City Engineer shall have the authority to extend the time period within which the subdivider shall complete the public improvements, subject to the extension of the expiration date of the approval of the plat, performance bond or letter of credit. H. Security. 1. Waiver of Security. The City Council may waive all or a portion of the security requirements of this section if it finds that the public health, safety and general welfare will not be harmed by such waiver. The City Council shall take into consideration the extent of public improvements to be installed and the likelihood that such improvements will be installed by the subdivider within the 12-month period, the impact that may result if such improvements are not timely installed, and the hardship to the subdivider if the security requirements are imposed. 2. Release of Security. As portions of the public improvements are completed in accordance with the Design Standards, the subdivider may make application to the Director to reduce the amount of the original letter of credit, performance bond or certified check. If the City Engineer is satisfied that such portion of the public improvements has been completed in accordance with City standards, the City may cause the amount of the letter of credit, performance bond or certified check to be reduced by such amount that the City Engineer deems appropriate, so that the remaining amount of the letter of credit, performance bond or certified check adequately insures the completion of the remaining public improvements. 3. Determination of Amount. A professional engineer licensed to practice in the State of Texas shall furnish estimates of the costs of engineering and construction of all required improvements to the Director who shall present the information to the City Engineer for review of the estimates in order to determine the adequacy of the guarantee instrument for insuring the construction of the required facilities. 4. Coordination with Fort Bend County. If the subdivision is located in the extraterritorial jurisdiction and is subject to the County bonding requirements, the subdivider may provide the financial security conforming to the above requirements in the name of Fort Bend County; provided, that the current County regulations stipulate that the security will not be reduced or released without written approval by the Director, and provided that the instrument is transferable from the County to the City upon annexation. I. Approval of a Final Plat shall be deemed to have expired in a subdivision for which no assurances for completion have been posted or the improvements have not been completed within the period of 1 year. In those cases where a security instrument has been required and improvements have not been completed within the terms of such security instrument, the City shall declare the subdivider to be in default and require that all the improvements be installed unless extended under the provisions of this Section. J. The City shall inspect all required improvements to ensure compliance with City requirements and approved infrastructure construction plans. When all required improvements have been satisfactorily completed, the City shall either accept, in writing, the improvements as having been satisfactorily completed or shall issue a punch list to the developer denoting items remaining to be completed. The City shall not accept dedications of required improvements nor release or reduce a performance bond or other assurance until such time as it determines that: 1. All improvements have been satisfactorily completed; 2. The required number of "as built" plans have been submitted to and accepted by the City; 3. The required maintenance bond has been provided; and 4. Any and all other requirements identified in this Chapter or other City codes and ordinances have been satisfied. K. Before the release of any security instrument guaranteeing the construction of required subdivision improvements or the signing of the Final Plat where subdivision improvements were made prior to the filing of the Final Plat for recordation, the subdivider will furnish the City with a maintenance bond to assure the quality of materials and workmanship and maintenance of all required improvements. The maintenance bond must be satisfactory to the City as to form, sufficiency, and manner of execution. The bond shall be in compliance with Table 5-35.1: Bond Requirements for Public Infrastructure. L. Whenever a defect or failure of any required improvement occurs within the period of coverage, the City will require that a new bond be posted for a period of 1 full calendar year sufficient to cover the corrected defect or failure. Table 5-35.1: Bond Requirements for Public Infrastructure IMPROVEMENTS COVERED BY BOND | BOND AMOUNT | BOND TYPE | BOND RELEASE | ACCEPTANCE Projects within City limits Water, sanitary sewer and drainage improvements | 10% of total construction cost. | Maintenance bond in the name of the City. When a MUD* project, maintenance bond in the name of the MUD. | At acceptance by the City. 1 year after construction completion at acceptance by the MUD. | 1 year after construction completion. Public Streets and Sidewalks | 10% of total construction cost. | Maintenance bond in the name of the City. | At acceptance by the City. | 1 year after construction completion and not until the sidewalks in all common areas area complete. Commercial Development | 10% of total construction cost. | Maintenance bond in the name of the City. | At acceptance by the City. | 1 year after construction completion and not until the streetlights are completely installed. Arterials and Collectors without homes fronting | 10% of total construction cost. | Maintenance bond in the name of the City. | At acceptance by the City. | 1 year after construction completion and not until the sidewalks and streetlights are complete. Infrastructure within the Extraterritorial Jurisdiction Water, sanitary sewer and drainage improvements | 10% of total construction cost. | Maintenance bond in the name of the County.** When a MUD* project, maintenance bond in the name of the MUD. | At acceptance by the County. 1 year after construction completion at acceptance by the MUD. | Upon annexation and 1 year after construction completion, whichever is later. Public Streets and Sidewalks | 10% of total construction cost. | Maintenance bond in the name of the County. | At acceptance by the County. | Upon annexation and 1 year after construction completion, whichever is later, and not until the sidewalks in all common areas are complete. Commercial Development | 10% of total construction cost. | Maintenance bond in the name of the County. | At acceptance by the County. | Upon annexation and 1 year after construction completion, whichever is later, and not until the streetlights are complete. Street Lights | 10% of total construction cost. | Performance bond in the name of the County. | At construction completion of the streetlights. | Upon annexation and 1 year after construction completion, whichever is later, and not until the street lights are complete. Arterials and Collectors without homes fronting | 10% of total construction cost. | Maintenance bond in the name of the County. | At paving acceptance by the County. | Upon annexation and 1 year after construction completion, whichever is later, and not until the sidewalks and streetlights are complete. * Municipal Utility District (MUD) ** Fort Bend County, TX

Ask a question about Sugar Land law

Corpus searches the Sugar Land sections it holds and shows the ones that match, with their citations. Free, no sign-in.