For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19-344 — Post-Repair inspection and testing requirements

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 19-344

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/36e19235-e5fd-4823-9532-ae45dd9837d8

Sec. 19-344. Post-Repair inspection and testing requirements.

a. After a property owner has repaired a defective private lateral, the Director shall: 1. Inspect, or cause to be inspected, the private lateral to determine that it complies with the City design guidelines for water and sewer lines, City specifications and the current Plumbing Code; and 2. May test the private lateral in a manner approved by the Director. b. If a private lateral fails the post-repair inspection or test, the property owner shall perform additional repairs as required by the Director to correct the defect.

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.