§ 11-2 — Application of chapter
Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 11-2
Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/68edc51c-0549-4bee-9999-dd5536828df5
Sec. 11-2. - Application of chapter.
(a) This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city. (b) The areas of special flood hazard, identified by the Federal Emergency Management Agency in the scientific and engineering report entitled, "The Flood Insurance Study (FIS) of McLennan County and incorporated areas" dated December 20, 2019, with accompanying flood insurance rate maps (FIRM) dated December 20, 2019 and any revisions thereto, are hereby adopted by reference and declared to be a part of this chapter and shall be controlling in the administration of this chapter. If the floodplain administrator determines that newer, documented and approved flood studies provide better delineation(s) of the area(s) of special flood hazard than those depicted in the FIS referenced above, the floodplain administrator may choose to utilize the new studies as the "best available information" for land development permitting and construction. (c) A floodplain development permit shall be required to ensure conformance with the provisions of this chapter. (d) If land development activities are proposed which will result in flood hazard boundary delineations different from those depicted on the current flood insurance rate map (FIRM) issued by the Federal Emergency Management Agency (FEMA), the applicant for a development permit shall obtain a letter of map change (LOMC) from FEMA. If the area to be developed does not have floodplains established by FEMA this requirement is not applicable. Once a LOMC or a conditional letter of map revision (CLOMR) has been approved by FEMA, development may proceed. Upon completion of the improvements, a letter of map revision (LOMR) must be approved by FEMA. (e) For any development, flood-prone areas shall be determined for all watercourses with contributing drainage areas greater than 160 acres that have not been studied by FEMA. This flood-prone area shall be considered a "Local Floodplain." The flood-prone area determination shall be based upon a flood study performed by a licensed professional engineer. The Floodplain Administrator may waive the requirement for a flood study if the area being developed is five acres or less and is not being further subdivided. In the event the Floodplain Administrator waives the requirement for a study, an area of special flood hazard must be established that encompasses the entire channel from bank to bank. The bank-to-bank limits shall be based on an actual field survey. (f) In areas studied by FEMA but where no base flood elevations (BFEs) have been established BFEs shall be established. BFEs shall be generated for subdivision proposals and other proposed developments greater than 50 lots or five acres, whichever is lesser, based on a flood study performed by a licensed professional engineer. (g) If the developer believes that the FEMA FIRMs are in error, the developer will be allowed to perform a "corrective effective" study of the area and then obtain a LOMR, if appropriate.
(Ord. No. 2013-486, § 2, 8-20-13; Ord. No. 2020-384, § 1, 6-2-20; Ord. No. 2025-477, § 2, 6-17-25)
Ask a question about Waco law
Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.
