For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-217 — Individual wastewater discharge permit application contents

Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 26-217

Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/c78b5fa9-486b-443f-93d8-ecefaf56f933

Sec. 26-217. - Individual wastewater discharge permit application contents.

(a) All users required to obtain an individual wastewater discharge permit or a general permit must submit with the city an application in the form prescribed by the city and signed by an authorized representative of the user. The city may require users to submit all or some of the following information: (1) Identifying information. a. The name of the operator and owner; b. Address and location of the facility (and of operator and owner, if different from facility); c. Contact information (including mailing address, telephone numbers, fax numbers, and email addresses). (2) Environmental permits. A list of any environmental control permits held by or for the facility. (3) Description of operations. a. A detailed description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications (SIC number) of the operation(s) carried out by such user according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972 edition, as amended. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes and flow volumes. b. Description of activities, facilities, and plant processes on the premises, including all materials that are or could be discharged; c. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; d. Number and type of employees, hours of operation, and proposed or actual hours of operation of facility and pretreatment system; e. Type and amount of raw materials processed (average and maximum per day); f. Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, floor drains, and sewer connections and appurtenances by the size, location and elevation g. Location or proposed location for monitoring all wastes covered by the permit (4) Time and duration of discharges; (5) The location for monitoring all wastes covered by the permit; (6) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in section 26-204(a)(3) (see 40 CFR 403.6(e)) or for other calculations. (7) Measurement of pollutants. a. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. b. The nature and concentration of any pollutants in the discharge which are limited or regulated by any city, state, or federal pretreatment standards, and a statement regarding whether or not the pretreatment standards are being met on a consistent basis, and if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required for the user to meet applicable pretreatment standards. c. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the city, of regulated pollutants in the discharge from each regulated process. Wastewater constituents and characteristics, including but not limited to, those mentioned in this article and as determined by a reliable analytical laboratory d. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. e. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in section 26-237 of this article, or section 304(g) of the Act and 40 CFR 136. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the city or the applicable standards to determine compliance with the standard. f. Sampling must be performed in accordance with procedures set out in sections 26-237 and 26-238 of this article. (8) Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on section 26-231 (see 40 CFR 403.12(e)(2)). (9) Any request to be covered by a general permit based on section 26-218. (10) Any other information as may be deemed necessary by the city to evaluate the permit application. (11) Where required drawings must be certified by a licensed professional engineer. (12) If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the shortest compliance schedule by which the user will provide such additional pretreatment. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. The following conditions shall apply to this schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.). b. No increment referred to in subsection a. above shall exceed nine months. c. Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the city including, at a minimum, whether or not the user complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine months elapse between such progress reports to the city. (b) Incomplete or inaccurate applications will not be processed and will be returned to the user for revision.

(Ord. No. 2021-743, § 2, 10-5-21)

Ask a question about Waco law

Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.