For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 26-222 — Individual wastewater discharge permit and general permit contents

Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code § 26-222

Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/ec4468ad-5bcc-425c-9cb0-d3e592615afd

Sec. 26-222. - Individual wastewater discharge permit and general permit contents.

An individual wastewater discharge permit or a general permit shall include such conditions as are deemed reasonably necessary by the city to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. (a) Permits shall be expressly subject to all provisions of this article and all other applicable regulations, user charges, and fees established by the city. Individual wastewater discharge permits and general permits must contain: (1) A statement that indicates the wastewater discharge permit issuance date, expiration date and effective date; (2) A statement that the wastewater discharge permit is nontransferable without prior notification to the city in accordance with section 26-224 of this ordinance, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; (3) Effluent limits, including best management practices, based on applicable pretreatment standards; (4) Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practice) to be monitored, sampling location, sampling frequency, number of samples, standards for tests, reporting schedule, and sample type based on Federal, State, and local law. (5) The process for seeking a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with section 26-231(b). (6) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable Federal, State, or local law. (7) Requirements to control slug discharge, if determined by the city to be necessary, as well as requirements for notification of slug discharges, notification of any sewer use permit violations, and requirements for resampling and reporting of such. (8) Any grant of the monitoring waiver by the city must be included as a condition in the user's permit. (9) Requirements for an authorized representative to meet the signatory and certification requirements for all applications and industrial user reports and that pretreatment standards are being met on a consistent basis. (10) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city and affording the city access thereto. (11) Requirements for notification to the city of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater system. (12) Statement that the city may make any permit amendment deemed necessary by the city if there is new introduction into the wastewater system of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater system. (b) Individual wastewater discharge permits or general permits may contain, but need not be limited to, the following conditions: (1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (3) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; (4) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; (6) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (7) A statement that compliance with the individual wastewater discharge permit or the general permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State Pretreatment Standards, including those which become effective during the term of the individual wastewater discharge permit; (8) Any compliance schedule requirements; (9) Technical reports and/or discharge reports; and (10) Other conditions as deemed appropriate by the city for the user to ensure compliance with this ordinance, and State and Federal laws, rules, and regulations.

(Ord. No. 2021-743, § 2, 10-5-21)

Ask a question about Waco law

Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.