Sec. 26-268. - Bypass of pretreatment facilities.

(a) A user may allow bypass to occur which does not cause effluent limitations to be exceeded, but only if it is also for essential maintenance to assure efficient operations and approved by the city. (b) Notification of bypass. (1) Anticipated bypass. If the user knows in advance of the need for a bypass, it shall submit prior written notice, at least ten days before the date of the bypass, to the city if possible. (2) Unanticipated bypass. The user shall immediately orally notify the city and submit a written notice to the city within five days. This report shall specify: a. A description of the bypass and its cause, including its duration (including the time, volume, and location of the bypass, and the type and concentration of waste in the bypass); b. Whether the bypass has been corrected; and c. The steps being taken or to be taken to reduce, eliminate and prevent a reoccurrence of the bypass. d. The city may waive the written notice on a case-by-case basis. (c) Bypass is prohibited and enforcement action may be taken against the user unless the following conditions are met: (1) All three of the following conditions are met: a. The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage or no feasible alternatives exist. As used in this section, severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can be reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; b. There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventative maintenance; and c. The user submits the notices required by this section; or (2) The city approves the bypass, after considering its adverse effects.

(Ord. No. 2021-743, § 2, 10-5-21)