For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3.3 — Required documents

Code of Ordinances of the City of Waco, Texas (Supp. No. 88: codified through Ordinance No. 2026-250, enacted April 21, 2026) · Waco City Code, App. B, pt. III, § 3.3

Corpus is an independent public-information project, not the official City of Waco website. Stable reference: corpuslaw.us/code/70d8fd21-de1a-4893-b469-86e5a7e87b03

Sec. 3.3. - Required documents.

The number of copies of documents to be submitted to the city plan department for plat review and permanent record shall be determined by the city plan department. Information concerning number of copies shall be made available by the city plan department. 3.301. Preapplication conference. The following documents should be submitted to the city plan department at the preapplication conference: A) A sketch plan of the entire subdivision, drawn approximately to scale, showing proposed street, lot and utility and drainage layout, B) A location map showing the subdivision in relation to existing streets or roadways (i.e., McLennan County Tax Map). 3.302. Preliminary plat approval. The required number of the following documents shall be submitted to the city plan department for preliminary plat review and approval. A) A legible, accurately scaled plat of the entire parent tract of land to be subdivided, including all adjacent land owned by the developer. Plats shall be submitted in both paper and digital format. Digital files shall be in a current version of AutoCAD (.dwg) or in Digital Exchange Format (.dxf) and shall be oriented to within ten feet of correct Texas State Plane Coordinates, NAD83. Plats shall be prepared by a Registered Professional Land Surveyor or a Registered Professional Engineer showing: 1) The subdivision boundary parent tract of land as determined by a boundary survey or by recorded description of the property; 2) The street and lot layout and the proposed use of the property; 3) Proposed and existing easements, sewers, water lines, gas mains, water courses, ravines, bridges, culverts, existing structures, and other features pertinent to subdivision; 4) Proposed and dedicated rights-of-way; 5) The proposed legal description of the subdivision; 6) The proposed name of the subdivision; 7) The date of the plat and of any revisions; 8) The scale to which the plat was drawn, (1:1200 unless this scale is impractical); 9) Computed total acreage; 10) A north arrow; 11) The name and address, signature, and date of signature of the owner of the property; 12) The words shown on the plat "PRELIMINARY PLAT FOR REVIEW PURPOSES ONLY"; 13) The city plan commission approval date; 14) The Texas Commission on Environmental Quality (TCEQ) water certification of convenience and necessity file number; 15) The electric service cooperative that serves the area. 16) Proposed, preliminary storm drainage system map including inlets, storm drains, culverts, channels, and detention facilities with an accompanying drainage area map; 17) Proposed, preliminary water and wastewater system map to serve the entire parent tract of land comprising the Preliminary Plat. B) A topographical map of the entire subdivision, and of a 100-foot-wide strip surrounding the subdivision, showing contours at two foot intervals with all elevations referenced to city approved datum. (Topographic information is necessary only for subdivisions exceeding two acres in gross area and/or having unusual topography.) Topographic information may be included on the plat described in 3.302(A) above, or placed on a separate map drawn to the same scale as the above plat. The topographic map shall be either an actual on-the-ground survey, material obtained from engineering services of the City of Waco, or an aerial survey approved by engineering services. A note shall be placed on the plat stating which method was used to provide the topographical map. C) A location map showing: 1) The proposed subdivision in relation to existing streets and/or other easily recognizable geographic features, 2) A north arrow, and 3) The proposed name of the subdivision. D) For sites not served by public sanitary sewer, and have received variance approval for the lots to be under one acre in size, the subdivider shall submit a report by an independent registered professional engineer indicating sufficient soil tests have been conducted and that the said engineer has determined the environmental suitability of each lot for safe operation of an on-site sewage facility (OSSF). The report shall determine a minimum lot size, density, and type of proposed disposal system. This report is to be submitted to the City of Waco and the Waco- McLennan County Health Department at the time of application submission and shall comply with all Texas Commission on Environmental Quality (TCEQ) regulations. E) The following studies and analyses shall be submitted with the preliminary plat application, unless exempted in writing from the department director, to determine infrastructure capacity and requirements: 1) Water and Wastewater Utilities; 2) Traffic Impact; and 3) Stormwater Management. 3.303. Final plat review, approval and recordation. The required number of the following documents shall be submitted to the city plan department for final plat review and approval by the appropriate city departments and the city plan commission. The documents set forth in subsection 3.303A, 3.303B and 3.303C must be included in the final plat for it to be filed for record in the official public records of McLennan County: A) A legible, accurately scaled plat of the entire subdivision or portion thereof. Plats shall be in paper and digital format. Digital files shall conform to paragraph 3.302(A). Plats shall be prepared by a Registered Professional Land Surveyor showing: 1) The subdivision boundary as determined by a boundary survey done on the ground by a registered professional land surveyor; 2) The street and lot layout; 3) Proposed and existing alleys and easements; 4) Proposed and dedicated right-of-way; 5) All dimensions and other surveying information necessary to produce the plat on the ground including: a) Linear and curvilinear dimensions shall be shown in feet and decimals of a foot; b) Bearings reference shall be shown by the current standards as prescribed by the State of Texas Land Surveyors Board; c) The radii, tangents, central angles, chords, and arcs of all curves; d) The lengths and bearings of all straight lines; e) The dimensions from all angle points and points of curve of lot lines; f) The long chord distance and bearings for all curves and curved lot lines; g) Existing lot lines (shown by dashed lines) for property being resubdivided; and h) Side lot lines perpendicular to the street may have the bearing shown; 6) Recording data for all property to include the owners name, acreage, adjacent to the subdivision; 7) Names and dimensions of proposed and existing streets within and adjacent to the subdivision unless where right-of-way becomes impractical; 8) The proposed name of the subdivision; 9) The date of the plat and of any revisions; 10) The scale to which the plat was drawn, (1:1200) unless this scale is impractical); 11) A north arrow; 12) The name, address and signature line of the owner(s) of the property; 13) The name, address, signature, and seal of the registered professional land surveyor responsible for the survey of the properties being subdivided; 14) Abandoned streets, alley and easements with ordinance number and date; 15) A monument legend; 16) Certification by the registered professional land surveyor that the plat represents work done on the ground by his/her or under his/her supervision; 17) Certification by the surveyor that all survey monuments are correctly shown on the plat. The owner may provide a performance guarantee for monumentation along with a letter from the surveyor supporting the amount of the guarantee in lieu of certification that monuments have been set. After construction is complete, the surveyor shall set the monuments; 18) Certification by the local health authority. If a lot within the subdivision is approved through the variance process to be less than one acre in size, and is not to be served by sanitary sewer, a certification approved by planning services shall be included on the plat as set forth in section 5.201(2)(d). This certification shall be signed by the appropriate local health authority, or designee; 19) For any plat containing lots that are not served by sanitary sewer, a note shall be added to the plat that states: All on-site sewerage facilities shall be designed, installed and operated in accordance with the rules, regulations, and standards prepared by the Waco-McLennan County Health District, the State Health Department and the Texas Commission on Environmental Quality (TCEQ). Test locations and soil test results shall be submitted for approval to the Waco-McLennan County Health District, OSSF Program Office; 20) Location of all soil borings or other test sites where required; and 21) For subdivisions in the extraterritorial jurisdiction which are served by a private water utility, the Texas Public Utility Commission certificate number, date of certification, and name of water utility serving the subdivision shall be shown on the plat. 22) The plat should be no larger than necessary and easily read, and drawn to a standard format of 8½" x 11", 8½" x 14", 11" x 17", 18" x 24", 22" x 34", 24" x 36", and the size required by the McLennan County Clerk for recording in the official public records of McLennan County. B) Complete set of fieldnotes of the boundary survey, signed by the surveyor, and having a closure error no greater than 1/10000. C) An instrument of dedication for all street and highway right-of-way, alleys, easements, parks, and/or property improvements intended for public use. The dedication shall be signed by the owner or his/her legally designated agent and acknowledged by a notary public and will be filed for record. The following certificate shall be placed below the dedication: STATE OF TEXAS COUNTY OF MCLENNAN "I hereby certify that the above and foregoing plat and fieldnotes of the (subdivision name) addition to the City of Waco, Texas, was approved by the City Plan Commission on the _____ day of ________, 20___." ___________ City Secretary Sample dedication forms shall be available at the city plan department. D) One copy of any requirements or deed restrictions imposed upon the subdivision by an individual or agency other than city staff or the city plan commission. E) Plan documents, including public infrastructure plan and profile drawings, drainage area maps and calculations, lot grading, lot-to-lot grading and construction drawings, will be submitted to the City of Waco prior to the submission of the final plat application. All plans shall be designed in accordance with the most recently adopted guiding documents. F) Minor plats not requiring preliminary plat review, are not served by public sanitary sewer, and have received variance approval for the lots to be under one acre in size, the subdivider shall submit a report by an independent registered professional engineer indicating sufficient soil tests have been conducted and that the said engineer has determined the environmental suitability of each lot for safe operation of an on-site sewage facility (OSSF). The report shall determine a minimum lot size, density, and type of proposed disposal system. This report is to be submitted to the City of Waco and the Waco-McLennan County Health Department at the time of application submission and shall comply with all Texas Commission on Environmental Quality (TCEQ) regulations.

(Ord. No. 1997-6, § 1, 3-4-97; Ord. No. 2002-0489, § 2, 8-20-02; Ord. No. 2017-980, § 3, 11-7-17; Ord. No. 2019-533, § 6, 9-3-19; Ord. No. 2023-484, § 2, 6-20-23; Ord. No. 2023-610, § 2, 8-15-23; Ord. No. 2025-477, § 18, 6-17-25)

Ask a question about Waco law

Corpus searches the Waco sections it holds and shows the ones that match, with their citations. Free, no sign-in.