§ 10-4-9 — SPECIFICATIONS
City Code of Lehi City, Utah (2026 S-12) · Lehi City Code § 10-4-9
Corpus is an independent public-information project, not the official City of Lehi website. Stable reference: corpuslaw.us/code/ccb1dc84-8a86-4741-9c80-d0d42605f024
10-4-9: SPECIFICATIONS:
A. Performance: Specifications are provided to assist property owners in satisfying a delivered audio quality (DAQ) of three (3) with a ninety percent (90%) reliability factor for emergency personnel using radio communication in their buildings and structures. Property owners who can demonstrate full compliance with the reliability factor without adhering to all of the following specifications may be excused from all or part of these provisions. Property owners who adhere to all of the specifications and fail to reach the reliability factor must employ all resources necessary to ensure full compliance. Performance and compliance will be inspected annually as part of the city fire department fire inspection. B. Signal Strength, Signal Rejection, Modulation Compatibility And Delivered Audio Quality: The following defines the minimum required level of radio signal strength: 1. A minimum signal strength of -95 dB in ninety five percent (95%) of the area of each floor of the building from both the seven hundred (700) and eight hundred (800) MHz countywide communications systems and from within the building is required. 2. The frequency range supported from the seven hundred (700) and eight hundred (800) MHz countywide communications system shall be seven hundred (700) to eight hundred sixty nine (869) MHz (base transmitter frequencies). 3. The frequency range supported to the eight hundred (800) MHz countywide communications system shall be seven hundred (700) to eight hundred twenty four (824) MHz (radio field transmit frequencies). 4. A public safety radio amplification system shall include filters to reject frequencies below seven hundred (700) MHz and frequencies above eight hundred sixty nine (869) MHz by a minimum of thirty five (35) dB. 5. All system components must be one hundred percent (100%) compatible with analog and digital modulations after installation without additional adjustments or modifications. The systems must be capable of encompassing the frequencies stated herein and capable of future modifications to a frequency range subsequently established by the city. If the system is not capable of modification to future frequencies, then a new system will need to be installed to accommodate the new frequency band. 6. Active devices shall have a minimum of -50 dB third order intermodulation protection. 7. All active in building coverage devices shall be FCC part 90 type certified. 8. UL listing is required for any AC operated power supplies. 9. Active devices shall include a minimum of twelve (12) hours of battery backup power. 10. Any in building coverage system shall be installed by a city approved, manufacturer trained and certified installer. C. Delivered Audio Quality: The delivered audio quality is defined below: DAQ | Subjective Performance Description DAQ | Subjective Performance Description 1 | Unusable, speech present but unreadable. 2 | Understandable with considerable effort. Frequent repetition due to noise/distortion. 3 | Speech understandable with slight effort. Occasional repetition required due to noise/distortion. 3.5 | Speech understandable with repetition only rarely required. Some noise/distortion. 4 | Speech easily understood. Occasional noise/distortion. 4.5 | Speech easily understood. Infrequent noise/distortion. 5 | Speech easily understood. D. Remedies To Achieve Compliance (Acceptable Amplification Systems): 1. If needed to ensure compliance with the ninety five percent (95%) reliability factor, the property owner must install each of the following: a. An in building coverage system composed of a radiating cable system or an internal multiple antenna system with FCC certified bidirectional amplifier, distribution system and subcomponents capable of accommodating the seven hundred (700) and eight hundred (800) megahertz band. b. Any active devices (e.g., signal booster) must be encased in a NEMA 4 (or equivalent) dust/water proof case and clearly labeled "Lehi City Public Safety Radio". c. Multiband pass filters as required. 2. In the event of a power outage, all electrical components must be equipped with independent auxiliary battery power or generators to function at full capacity for at least twelve (12) hours. 3. Once a system is installed, a spectrum analyzer will be used to evaluate the system for harmful interference to the countywide coordinated communications system backbone initially, and annually thereafter by a Utah County dispatch communications division FCC certified technician. Any interference must be identified and removed before the system can be accepted. E. Applicable Federal Communications Commission Rule Compliance: All active devices used to provide extended coverage must be FCC certificated. 1. Test Standards; Design Review And Certification: a. Prior to issuance of a building permit, the applicant shall: (1) Retain an FCC certified technician who will review construction plans in order to ensure that such plans meet the aforementioned radio communication criteria, and recommend, if needed, an in building solution for reliable radio communication; (2) Submit copies of plans certified with the signature of the technician to the fire marshal, city chief building official and Utah County dispatch communications; b. Prior to issuance of a certificate of occupancy, the applicant shall: (1) Retain an FCC certified technician who will test all areas of the building or structure, verify installation and operation of in building solutions, if needed, and certify all of the findings stated herein on the date of inspection with his/her signature. A passing test is one that demonstrates DAQ 3 with a ninety five percent (95%) reliability factor on each floor. Owners of buildings that fail to meet this standard will not be in compliance with this chapter. (2) The building owner must retain all records of initial and annual inspections and submit copies to the city fire marshal and Utah County dispatch communications. 2. Initial Test Procedure: a. For purposes of testing, each floor of the building shall be divided into a grid of approximately twenty (20) equal areas. A maximum of two (2) nonadjacent areas will be permitted to fail the test. In the event that three (3) of the areas fail the test, and to provide greater statistical accuracy, the floor may be divided into forty (40) equal areas. In such an event, a maximum of four (4) nonadjacent areas will be permitted to fail the test. As specified by the authority having jurisdiction, the test shall be conducted by using a Motorola XTS 2500, or equivalent portable radio, talking through the eight hundred (800) countywide coordinated communications system. A spot located approximately in the center of a grid area will be selected for the test. The radio will then be keyed to verify two-way communication to and from the outside of the building through the countywide communications system. Once the spot has been selected, prospecting for a better spot within the grid area will not be permitted. b. All auxiliary power systems shall be tested under load for a period of one hour to verify that the system will operate properly in the event of a power outage. The testing technician reserves the discretion to determine whether or not the battery exhibits symptoms of failure. The FCC certified technician will ultimately decide if the auxiliary system needs to be replaced or upgraded. 3. Annual Test Procedure: After a certificate of occupancy is issued, the authority having jurisdiction or appointed agent will annually test the in building system components to determine general functional operability. If noncompliance is found, an approved FCC technician will reassess the improvement upon scheduling by the building owner. 4. Battery Replacement: Every two (2) years battery backup systems shall be replaced per manufacturer specifications. F. Additional Equipment Feature Requirements: Active devices shall be alarmed. A telephone line will provide dial tone to an alarm device. The alarm device will be programmed to activate Utah County's paging system to notify a failure. Access to the active components of the in building coverage system (if any) is required twenty four (24) hours a day by county technicians/engineers. The minimum alarms will indicate loss of AC failure and operational failure. The device shall also have modem access to allow remote monitoring. G. New Building Construction: All new building construction shall have a two inch (2") conduit installed for wire and cable routing between the first and bottom subterranean floor and said conduit shall extend along the center of the building to the roof. The conduit shall be dedicated to the public safety radio system and the fire command center and shall not have any interference from outside sources. At each floor the ceiling and the roof, an opening shall be made to afford easy access to the conduit. Access in either the form of drop ceiling or conduit shall be made available along hallways and through firewalls. All subterranean parking garages shall have a similar conduit installation. H. Survivability: All wiring shall be installed in conduit. All main risers or trunks of the antenna system shall be installed with resistance to attack from fire by a two (2) hour fire rated cable, cable system or enclosure. I. Tower: The owner of the building shall construct a tower at the highest point of the building or make reasonable accommodations to equip an existing tower with the necessary equipment, including, but not limited to, signal boosters, bidirectional amplifiers, transmitters, receivers, cabling, etc., that shall be compatible with the countywide coordinated communications system and shall be unobstructed and free from interference. (Ord. 01-22-08.11, 1-22-2007)
Ask a question about Lehi law
Corpus searches the Lehi sections it holds and shows the ones that match, with their citations. Free, no sign-in.
