9-4B-74: BYPASS:
A. Bypass Not Violating Applicable Pretreatment Standards Or Requirements: An industrial user may allow any bypass to occur which does not violate pretreatment standards or requirements, but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to subsections B and C of this section. B. Notice: 1. If an industrial user knows in advance of the need for a bypass, it shall submit prior notice to the POTW, if possible, at least ten (10) days before the date of the bypass. 2. An industrial user shall orally notify the district of an unanticipated bypass that exceeds applicable pretreatment standards or requirements within twenty four (24) hours of becoming aware of the bypass. A written submission shall also be provided within five (5) days of becoming aware of the bypass. The written submission shall contain: a. A description of the bypass and its cause; b. The duration of the bypass, including exact times and dates, and, if the bypass has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the bypass. C. Prohibition Of Bypass: 1. Bypass is prohibited and the district may take enforcement action against an industrial user for a bypass, unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; b. There were no feasible alternatives to bypass, such as use of auxiliary treatment facilities, retention of wastes or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed to prevent bypass which occurred during normal periods of equipment downtime or preventive maintenance; and c. The industrial user submitted notices as required by subsection B of this section. 2. The POTW may approve an anticipated bypass, after considering its adverse effects, if the district determines that it will meet the three (3) conditions listed in subsection C1 of this section. (Ord. 12-08-09.35, 12-8-2009)
Ask a question about Lehi law
Corpus searches the Lehi sections it holds and shows the ones that match, with their citations. Free, no sign-in.