§ 15-27-8 — APPENDIX A
City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 15-27-8
Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/fd9905e5-bfcf-4956-aaad-1d1c74974c70
15-27-8: APPENDIX A:
A. Soil Characteristics Report: A soils report should be prepared by a person or firm qualified by training and experience which would furnish specific soil data for the property to be developed and methods that would control urban erosion. Data on the soil should include: 1. Soils map of the property involved, delineating the soil types; 2. An accurate slope map; 3. Major soil hazard ratings in relation to total area of development; 4. Percentage of area to be disturbed in relation to total area of development. B. Grading Or Erosion Control: A grading or erosion control plan should accompany the development application showing the specific methods to be employed to control urban erosion and sedimentation and should include as a minimum: 1. The grading plan shall show present topography to include elevations, lines and grades including the location and depth of all proposed fills and cuts of the finished earth surfaces using a contour interval of two feet (2') or less. Access or haul road location, treatment and maintenance requirements shall be included; 2. The specific control practices to be employed on the disturbed area where necessary (includes seed mixes, types of mulches, etc.); 3. All calculations and proposed details used for design and construction (of debris basins, impoundments, diversions, dikes, waterways, drains, culverts and other water management for soil erosion control measures) shall be shown. Calculations shall employ predictions of soil loss from sheet erosion. Equations should include factors of: a. Rainfall intensity and energy; b. Soil stability; c. Land slope and length of slope or topography; d. Condition of the soil surface and land management practices in use; e. Surface cover, grass, woodland, crop, pavement, etc.; 4. Specific dates on the length of time exposure for unprotected, cleared and graded areas; 5. A schedule showing when each stage of the project will be completed, including estimated starting and completion with reference to other stages of the project. C. Geology: A geologic investigation of the site should be prepared containing the following information: 1. Location and size of subject area, and its general setting with respect to major geographic and/or geologic features; 2. The individual or agency who perform the geologic mapping upon which the report is based, and when the mapping was prepared; 3. Abundance, distribution, and general nature of exposure of earth materials within the area; 4. Nature and source of available subsurface information; 5. A geologic map should accompany the report and should delineate the following: a. Rock composition and structural elements; b. Surface and subsurface distribution of earth materials exposed or inferred within both bedrock and surficial deposits; c. The nature and distribution of earth materials, faults, folds, slide masses, zones of contortion or crushing joints, fractures, shear zones, or other significant features; 6. Written recommendations for construction of proposed improvements to avoid impact of any potential geologic hazards. D. Vegetation And Preservation Report: Vegetation preservation and protection report shall include: 1. Location and identification (by species) of existing vegetation; 2. The vegetation to be removed and method of disposal; 3. The vegetation to be planted; 4. Slope stabilization measures to be installed; 5. Analysis of the environmental effect of such operations including effects on slope stability, soil erosion, water quality, fish and wildlife, and fire hazard; 6. Topsoil stockpile areas will be designated; 7. Solar orientation is recommended for review. E. Hydrology And Storm Drainage: A hydrology report should be prepared by a person or firm qualified by training and experience to have expert knowledge of the subject and should include an adequate description of the following: 1. A flood analysis should be made for all stream channels that occur on the site: a. 100-year storm frequency based on rain on a saturated soil mantle or snow pack taking the results which cause the greater flood flow; b. On streams with a meandering channel and relatively flat gradient way of the standard flood plain analysis of streams may be used (i.e., U.S. Corps of Engineers Standard Project Flood); c. On mountain streams with relatively steep gradients only those analyses based on turbulent flow conditions may be used. "Bulking", if it occurs, must be recognized and channel cross sections increased to allow for it. Mud flows and other debris must also be considered in the analysis; d. History of prior flooding; e. Investigation of effects of short duration high intensity rain storms on the proposed storm drainage system will handle the predicted flows including the impact on areas below. 2. The ability of the existing stream channels to accommodate the estimated increase in storm flow due to the proposed development should be defined with respect to water flow and velocity. If the stream channel or banks are subject to erosion, measures to be taken to minimize this impact should be specified by consideration of the following: a. The proposed streamside environment zone on the site plan and criteria for determining the zone must be delineated; b. Natural flow patterns as they affect the proposed development should be described and evaluated; c. Means by which the manmade drainage systems will deliver water to the natural channel systems should be specified. 3. Subsurface Hydrology: a. The location and size of swamps, springs, and seeps shall be shown on the site plan and an investigation made to determine the reasons for the occurrence of these underground water sources. (An analysis of the vegetative cover or other surface information may be used to show the presence of underground water.) b. Effects of the proposed development on subsurface water sources for areas immediately downstream should be defined and evaluated; c. Effects of the proposed development on subsurface water sources for areas immediately downstream should be defined and evaluated; d. If infiltration systems are proposed for handling increased flows caused by the proposed development, their operation and failure prevention measures should be described. F. Fire Protection: A fire protection report should be prepared to assess fire probability and potential hazards by a person or agency qualified by training and experience. Elements of the report should include the following: 1. The width and approximate location of any easements required for access of fire protection equipment; 2. Agreements, if any, entered into by the applicant and a fire protection entity or other government agency that could have concerns about fire probability (State and Federal agencies); 3. The approval of the subdivision design and fire protection measures by the fire protection agency; 4. A letter from the chief of the fire protection entity stating: a. Fire flow recommended by insurance service organizations; b. The existing fire flow capability proposed to serve the project. (Ord. 85-27, 6-13-1985; amd. 1999 Code)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.
