For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15-8-9 — SUBMISSION AND APPROVAL PROCESS

City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 15-8-9

Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/2c4aac49-7b8c-4f34-ad49-280db8b77def

15-8-9: SUBMISSION AND APPROVAL PROCESS:

A. Steps Outlined: The PRUD approval process consists of three (3) basic review steps. The first step is submission and review of a conceptual sketch plan. The purpose of this step is to evaluate the appropriateness of the development as PRUD based on the consideration of the existing features of the proposed site and the relationship to adjacent properties. The second step is submission and review of a preliminary development plan and conditional use permit based on the conceptual sketch plan. The purpose of this step is to determine if the preliminary plan/conditional use permit shall be granted. The third step is submission and review of a final development plan. The purpose of this step is to review compliance with the conditional use permit and the preliminary plan. For purposes of recordation, the PRUD shall be recorded as a subdivision. Upon compliance with final approval, a final plat shall be recorded. B. Conceptual Sketch Plan Approval Process: Prior to the submission of a PRUD proposal, the applicant shall meet with the current planning staff to discuss their proposal and its appropriateness for development as a PRUD. Upon completion of the preapplication meeting with the current planning staff, the applicant may choose to present the conceptual sketch plan to the Planning Commission. The purpose of this presentation is to provide the applicant with an opportunity to present why the PRUD proposal is appropriate for the site. The Planning Commission may comment as to the potential suitability of the site for a PRUD and present any concerns or comments they may have for the applicant relative to the proposed PRUD. If the applicant chooses to not present the conceptual sketch plan, it shall be done as part of the preliminary plan approval. For sites located in the Sensitive Area Overlay Zone, a conceptual review by the Planning Commission is required to determine if and what geo-technical studies are required in accordance with the zone. The application shall provide a conceptual sketch plan which shall include the following: 1. Basic site analysis which includes existing features of the site, such as existing plant materials, steep slopes or rock outcroppings, views and how they will be incorporated into the proposed development; 2. Traffic flow patters into, through and out of the proposed development, including vehicular, pedestrian, and other; 3. The general location of the housing units by type (i.e., detached dwelling units and attached dwelling units), along with other appropriate uses and amenities; and 4. The existing land uses bordering the proposed site. C. Preliminary Development Plan/Conditional Use Permit Submission: An application for a PRUD preliminary plan/conditional use permit shall be presented to the Planning Commission and shall include the following information: 1. Topographic maps of the entire site, including contour intervals of no greater than ten feet (10'); 2. A tabulation of the total acreage of the site and the percentages to be designated for parking, streets and travel ways, various types of residential units, other buildings and structures, open space, and waterways, along with other relevant aspects of the site; 3. The proposed circulation patterns, including private and public streets, and any other path systems; 4. The proposed location of all parking and ingress and egress; 5. The proposed location of parks, common open spaces, playgrounds, school sites, recreation facilities, and other similar types of improvements; 6. The proposed location of all dwellings by type and number of dwelling units per building, along with other buildings (e.g., recreational buildings or club houses) or structures (e.g., fencing, lighting, and signage); 7. The proposed location of each phase, if the project is to be done in phases; 8. A table of densities for each development phase with a overall density for the development; 9. A general landscape plan showing the areas to be landscaped and the retention of existing plant materials and landscape features, along with the use of plant materials for buffers and screening; 10. Preliminary building elevations with notation of building materials of all building types proposed within the development, excluding detached single-unit dwellings; 11. A preliminary subdivision design, showing a general lot layout and buildable area; 12. A preliminary utility plan showing the manner in which adequate sewage disposal, subsurface drainage, storm drainage, and water are to be provided to the site, including the location from which said services will need to be extended; 13. If located in the Sensitive Area Overlay Zone, all necessary reports or information required for compliance with Chapter 27 of this Title; and 14. Such other information as may be necessary to determine whether the proposed PRUD is desirable and in accordance with the applicable standards. D. Preliminary Development Plan Review Process: 1. The Planning Commission, subject to the requirements of this Chapter, may approve, deny or approve with conditions, the preliminary development plan for the proposed PRUD. Approval of a preliminary development plan shall result in the issuance of a conditional use permit. During the preliminary review process, notice shall be given to the public of the PRUD proposal in accordance with Planning Commission rules for conditional use permits. 2. In reviewing the proposed PRUD, the Planning Commission shall determine if the PRUD: a. Encourages better utilization of the land, develops a sense of community and is compatible with the neighborhood; b. Meets the minimum requirements in this Chapter; c. Meets the requirements for any bonus density requested for the PRUD; d. Provides an adequate traffic circulation system and whether streets should be designated as public or private; and e. Meets the general intent and purpose of this Chapter and the General Plan. E. Final Development Plan Submission: The final development plan, based on the conceptual sketch and preliminary plans, shall be presented to the Planning Commission and include the following information: 1. All of those items required by the Planning Commission as part of the approval of the preliminary development plan and conditional use permit; 2. A complete and accurate legal description of all property proposed for development; 3. A detailed site plan showing the precise location of all buildings and structures, the location of developed common activity area and recreational uses, waterways, detailed circulation patterns, including proposed ownership of common areas, streets and trails, along with other relevant aspects of the site; 4. Parking layout showing the location of individual stalls and all areas of ingress and egress; 5. Design of entryways, along with elevations of proposed signage; 6. A detailed landscape plan showing the location, types and sizes of all plant materials, sprinkling or irrigation systems, screening and fencing; 7. Final elevations of all buildings proposed within the development with notation of building materials, excluding detached single-unit dwellings; 8. A final plat of the PRUD, along with all covenants, conditions and restrictions which the City deems necessary to provide adequate guarantees for retention and maintenance of the development as approved; 9. Detailed engineering plans including site grading, street improvements, drainage and public utility locations; and 10. A time schedule for the completion of landscaping and amenities (e.g., common buildings, playground equipment, recreational facilities, trails and entry signage). F. Final Development Plan Review Process: 1. The Planning Commission, subject to the requirements of this Chapter, may approve, deny, or approve with conditions, the final development plan for the proposed PRUD and the accompanying conditional use permit. 2. The Planning Commission review of the final development plan shall include the following: a. Whether or not the requirements imposed addressed by the Planning Commission during the conceptual, preliminary processes and the conditions established by the conditional use permit have been adequately addressed in the final development plan; b. Any additional changes from the preliminary development plan proposed by the developer; and c. Any additional information relevant to the success of the proposed development. (Ord. 93-30, 7-27-1993)

Ask a question about Ogden law

Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.