9-7B-5: SWPPP DESIGN REQUIREMENTS:
A. The authorized enforcement officer may establish by administrative order city design criteria for grading, erosion control practices, sediment control practices, and watercourse crossings, which administrative order shall be effective upon filing in the city recorder's office. B. Grading, erosion control practices, sediment control practices, and watercourse crossings shall meet any design criteria established by the authorized enforcement officer pursuant to subsection A of this section, and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the authorized enforcement officer. Cut and fill slopes shall be no greater than two to one (2:1), except as approved by the authorized enforcement officer to meet other community or environmental objectives. C. Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and have been stabilized. D. Erosion control practices shall, at a minimum, include the following: 1. Soil stabilization shall be completed within five (5) days of clearing or inactivity in construction. 2. If seeding or another vegetative erosion control method is used, it shall become established within two (2) weeks or the authorized enforcement officer may require the site to be reseeded or a nonvegetative option employed. 3. Soil stockpiles maintained off site must be stabilized or covered at the end of each workday. 4. Specialized techniques meeting design criteria approved by the authorized enforcement officer must be employed to stabilize steep slopes or along drainageways to ensure stabilization. 5. The entire site must be stabilized, using a heavy mulch layer or another method that does not require germination to control erosion, at the close of the construction season if applicable. 6. Techniques shall be employed to prevent the blowing of dust or sediment from the site. 7. Techniques that divert upland runoff past disturbed slopes shall be employed. E. Sediment control requirements shall include: 1. Settling basins, sediment traps and perimeter controls. 2. Settling basins that are designed in a manner that allows adaptation to provide long term storm water management, if required by the authorized enforcement officer. 3. Protection for adjacent properties by the use of a vegetated buffer strip in combination with perimeter controls. F. Waterway and watercourse protection requirements shall include: 1. A temporary stream crossing installed and approved by the authorized enforcement officer if a wet watercourse will be crossed regularly during construction. 2. Stabilization of the watercourse channel before, during, and after any in-channel work. 3. All on site storm water conveyance channels designed according to city design criteria established pursuant to subsection A of this section or the city's engineering standards adopted pursuant to title 7, chapter 6 of this code. 4. Stabilization adequate to prevent erosion located at the outlets of all pipes and paved channels. G. Construction site access requirements shall include measures adequate to ensure that sediment is not tracked onto public streets by construction vehicles or washed into storm drains. (Ord. 2006-45, 7-25-2006)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.