§ 9-7B-4 — STORM WATER POLLUTION PREVENTION PLANS
City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 9-7B-4
Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/f097a135-7961-43a6-a68f-fb56dfc5df9a
9-7B-4: STORM WATER POLLUTION PREVENTION PLANS:
A. Storm water pollution prevention plans shall include the following: 1. Map(s) or site plan(s) describing: a. The existing topography of the site; b. Delineation of any areas of vegetation or trees to be saved; c. Clear and definite delineation of any wetlands, natural or artificial water storage detention areas, and drainage ditches on the site; d. Clear and definite delineation of any 100-year floodplain on or near the site; e. Approved grading and drainage plans; f. Watercourses or portions of the city's storm drainage systems either on or near the site. 2. A sequence of construction activity to occur on the site, including stripping and clearing; rough grading; construction of utilities, infrastructure, and buildings; and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosions and sediment control measures, and establishment of permanent vegetation. 3. All storm water pollution control measures or BMPs necessary to meet the objectives of this article throughout all phases of the construction and after completion of development of the site. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season. 4. Provisions for maintenance of erosion or sediment control facilities. 5. An inspection schedule for determining the overall effectiveness of the SWPPP. 6. Such other additional information or data deemed necessary to ensure compliance with the requirements of this article. B. Storm water pollution prevention plans shall be stamped as approved by a registered civil engineer. The authorized enforcement officer may waive such requirement when it is self-evident that the construction activity is simple, clearly shown, and entails no hazard or nuisance potential to adjacent properties or watercourses, and does not include the placement of fill upon which a structure may be erected. C. Requests to modify a permit or an SWPPP shall be submitted and reviewed in the same manner as provided in sections 9-7B-2 and 9-7B-3 of this article for permit applications; provided that any modification deemed by the authorized enforcement officer to be minor may be approved on site or informally by the authorized enforcement officer without the need for a formal application and fee payment. Such informal modifications shall be documented on a field report or correction notice, and the approved plans, with a dated signature. (Ord. 2006-45, 7-25-2006)
Ask a question about Ogden law
Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.
